Associated Builders and Contractors' (ABC) Construction Confidence Index (CCI) indicates that contractor confidence will continue to rise in the first half of 2015. The diffusion index measures forward-looking construction industry expectations in sales, profit margins and staffing levels with readings above 50 indicating growth.
In summary, first half index readings are as follows:
- Sales expectations rose from 67.3 to 69.4;
- Profit margin expectations were up from 61.0 to 62.9;
- Staffing level intentions dipped slightly from 66.3 to 66.2.
Most expect that sales will continue to expand and profit margins will widen further. ABC's weighted diffusion index for profit margins is now approaching the highest reading in the index's three-year history. The sales expectation reading is even more optimistic with nearly three in four respondents expecting an increase in sales. While the rate of new hires will continue to be brisk, the pace of hiring is not expected to accelerate over the next six months due in large part to a lack of available skilled labor.
"The recovery continues and is now in its seventh year, but there is plenty of reason for concern with respect to the U.S. economy," said ABC Chief Economist Anirban Basu. "Financial markets have been jittery, the global economy has been slowing and Federal Reserve policy has become less predictable and more confusing. While U.S. economic expansion continues to be led by growth in consumer outlays, in part due to extraordinarily low interest rates, nonresidential construction spending growth has become an important supporting actor. Nonresidential spending, including on factories, hotels, office buildings and distribution centers, has continued to climb in the face of more readily available financing, lower retail and office vacancy rates and rising hotel occupancy rates.
"Though the U.S. economy refuses to boom, the pace of growth has been enough to allow the average contractor to secure more work at higher margins," said Basu. "Interestingly, the pace of hiring is not set to accelerate, which may be a partial reflection of the lack of appropriately skilled construction workers available for hire. The expectation is for construction compensation costs to continue to rise given expanding skills shortages, but apparently not by enough to preclude steadily expanding margins."
"While the decline in commodity prices has helped to slow construction in parts of the country, including in portions of Texas, Oklahoma and North Dakota, low fuel prices have induced faster investment elsewhere, including in the U.S. auto industry," said Basu. "The result appears to be that the average construction decision maker is more confident than six months ago when commodity prices were higher. A stronger U.S. dollar has served to suppress U.S. export growth, however, and business investment growth remains mediocre by historic standards. The implication is that the U.S. economy is not poised to break out anytime soon, and that stakeholders can continue to expect frustratingly unexceptional growth close to 2 to 2.5%."
To read more about the latest CCI, click here.
Related Stories
| Feb 7, 2012
Thornton Tomasetti opens new office in Denver
The firm, which now has 25 offices internationally, opened the new office to better serve current and potential clients in the western Central region and Mountain States.
| Feb 6, 2012
Slight increase in nonres construction spending expected in 2012, growth projected for 2013
Commercial sector expected to lead real estate recovery.
| Feb 6, 2012
FMI releases 2012 Construction Productivity Report
Downsizing has resulted in retaining the most experienced and best-trained personnel who are the most capable of working more efficiently and harder.
| Feb 6, 2012
Kirchhoff-Consigli begins Phase 2 renovations at FDR Presidential Library and Museum
EYP Architecture & Engineering is architect for the $35 million National Archives Administration project.
| Feb 6, 2012
Batson-Cook announces the appointment of Hall as president
Hall will manage and direct all aspects of the firm’s day-to-day operations. He will be based in Batson-Cook’s Atlanta office.
| Feb 6, 2012
Siemens gifts Worcester Polytechnic Institute $100,000 for fire protection lab renovation
Siemens support is earmarked for the school’s Fire Protection Engineering Lab, a facility that has been forwarding engineering and other advanced degrees, graduating fire protection engineers since 1979.
| Feb 2, 2012
Call for Entries: 2012 Building Team Awards. Deadline March 2, 2012
Winning projects will be featured in the May issue of BD+C.
| Feb 2, 2012
VLK Architects selected for new Cypress, Texas elementary school
The Bridgeland Elementary School will be a new prototype school for the District. Designed to meet the requirements of The Collaborative for High Performance Schools.
| Feb 2, 2012
Mortenson Construction to build 2.4 MW solar project in North Carolina
Located on a 12 acre site in the Sandhills region, the 2.4 megawatt (MW) system is expected to generate approximately 3.5 million kilowatt hours (kWhs) of clean electricity on an annual basis.