flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

ABC: Nonresidential spending falls again in December

Contractors

ABC: Nonresidential spending falls again in December

For a second consecutive month, 12 of 16 nonresidential subsectors experienced spending decreases on a monthly basis.


By ABC | February 2, 2016
ABC: Nonresidential spending falls again in December

Construction in Indianpolis. Photo: sciondriver/Creative Commons.

Nonresidential construction spending dipped for a second consecutive month, falling 0.4% on a monthly basis in December, according to analysis of U.S. Census Bureau data released by Associated Builders and Contractors (ABC). Nonresidential construction spending totaled $681.2 billion on a seasonally adjusted, annualized basis. November's nonresidential construction spending estimate was revised lower by 0.6% to $683.7 billion. 

For a second consecutive month, 12 of 16 nonresidential subsectors experienced spending decreases on a monthly basis. Private nonresidential spending dipped 2.1% for the month, while public sector spending expanded 2.2%.

"December's estimate is a bit unnerving not only because it represents a second consecutive month of spending decline, but also because unusually warm temperatures should have helped to translate into better spending performance," ABC Chief Economist Anirban Basu said. "A number of leading indicators suggest that nonresidential construction spending performance will remain choppy moving forward, both for the broader economy and the nation's nonresidential construction segment, including the Baltic Dry Index, the Conference Board's Index of Leading Economic Indicators and the Architecture Billings Index.

"This is not to suggest that the nonresidential recovery will end in the near term," Basu said. "Most firms continue to report healthy backlog and hiring remains aggressive, implying that many firms are staffing up in order to perform on forthcoming contractual opportunities. However, private credit is beginning to tighten and becoming more expensive. Consumer delinquencies are edging higher and corporate bond defaults have been climbing. Accordingly, many contractors may experience a slowdown in backlog accumulation in 2016, with the 2017-2018 economic outlook remaining decidedly murky."

Only four of 16 nonresidential construction sectors experienced spending increases in December on a monthly basis:

  • Spending in the highway and street category expanded by 9.6% on a monthly basis and 11.7% on a yearly basis.
  • Communication-related spending increased 4% month over month and 37.2% year over year.
  • Sewage and waste disposal-related spending expanded 1.3% for the month, but fell 9.7% from the same time last year.
  • Spending in the amusement and recreation category climbed 0.5% on a monthly basis and 9.2% on a year-over-year basis.

Spending in 12 of the nonresidential construction subsectors fell in December on a monthly basis:

  • Spending in the power category fell 0.3% from November 2015, but is 7.6% higher than in December 2014.
  • Commercial-related construction spending fell 0.6% for the month and 3.2% for the year.
  • Educational-related construction spending fell 0.8% on a monthly basis, but expanded 10% on a yearly basis.
  • Transportation-related spending fell 0.8% month over month, but expanded 2.3% year over year.
  • Lodging-related spending was down 1.3% for the month, but is up 29.1% on a year-ago basis.
  • Spending in the office category fell 1.8% from November 2015, but is up 16.6% from December 2014.
  • Water supply-related spending fell 2.9% on a monthly basis and 6.6% on a yearly basis.
  • Health care-related spending fell 3.2% month over month, but is up 0.4% year over year.
  • Spending in the religious category fell 4.1% for the month and 1.7% for the year.
  • Public safety-related spending declined 4.6% for the month and 7.4% for the year.
  • Manufacturing-related spending fell 7.2% from November 2015, but is 19.6% higher than in December 2014.
  • Conservation and development-related spending declined 9.9% on a monthly basis and is 8% lower on a yearly basis.

Related Stories

| Nov 2, 2010

Wind Power, Windy City-style

Building-integrated wind turbines lend a futuristic look to a parking structure in Chicago’s trendy River North neighborhood. Only time will tell how much power the wind devices will generate.

| Nov 2, 2010

Energy Analysis No Longer a Luxury

Back in the halcyon days of 2006, energy analysis of building design and performance was a luxury. Sure, many forward-thinking AEC firms ran their designs through services such as Autodesk’s Green Building Studio and IES’s Virtual Environment, and some facility managers used Honeywell’s Energy Manager and other monitoring software. Today, however, knowing exactly how much energy your building will produce and use is survival of the fittest as energy costs and green design requirements demand precision.

| Nov 2, 2010

Yudelson: ‘If It Doesn’t Perform, It Can’t Be Green’

Jerry Yudelson, prolific author and veteran green building expert, challenges Building Teams to think big when it comes to controlling energy use and reducing carbon emissions in buildings.

| Nov 2, 2010

Historic changes to commercial building energy codes drive energy efficiency, emissions reductions

Revisions to the commercial section of the 2012 International Energy Conservation Code (IECC)  represent the largest single-step efficiency increase in the history of the national, model energy. The changes mean that new and renovated buildings constructed in jurisdictions that follow the 2012 IECC will use 30% less energy than those built to current standards.

| Nov 1, 2010

Sustainable, mixed-income housing to revitalize community

The $41 million Arlington Grove mixed-use development in St. Louis is viewed as a major step in revitalizing the community. Developed by McCormack Baron Salazar with KAI Design & Build (architect, MEP, GC), the project will add 112 new and renovated mixed-income rental units (market rate, low-income, and public housing) totaling 162,000 sf, plus 5,000 sf of commercial/retail space.

| Nov 1, 2010

John Pearce: First thing I tell designers: Do your homework!

John Pearce, FAIA, University Architect at Duke University, Durham, N.C., tells BD+C’s Robert Cassidy  about the school’s construction plans and sustainability efforts, how to land work at Duke, and why he’s proceeding with caution when it comes to BIM.

| Nov 1, 2010

Vancouver’s former Olympic Village shoots for Gold

The first tenants of the Millennium Water development in Vancouver, B.C., were Olympic athletes competing in the 2010 Winter Games. Now the former Olympic Village, located on a 17-acre brownfield site, is being transformed into a residential neighborhood targeting LEED ND Gold. The buildings are expected to consume 30-70% less energy than comparable structures.

| Oct 27, 2010

Grid-neutral education complex to serve students, community

MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.

| Oct 21, 2010

GSA confirms new LEED Gold requirement

The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.

boombox1
boombox2
native1

More In Category



Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021