flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

ABC: Nonresidential construction spending flat in February

Contractors

ABC: Nonresidential construction spending flat in February

The Associated Builders and Contractors forecasts a robust nonresidential construction spending recovery in 2015, despite an underwhelming start.


By Associated Builders and Contractors | April 1, 2015
Nonresidential construction spending flat in February

Commercial construction spending lost 1.9% in February, but is up 13.5% on a year-over-year basis.

Blame it on the weather. That's what many economists have been doing over the past two months as economic data continue to disappoint. Retail sales, durable goods orders, and other categories have not been as strong as anticipated.

Nonresidential construction has often proved an exception, with the industry's momentum gaining steam recently. However, in February, nonresidential construction spending remained virtually unchanged, inching down 0.1% on a monthly basis, according to the April 1 release from the U.S. Census Bureau.

The February 2015 spending figure is 4.6% higher than February 2014, as spending for the month totaled $611.5 billion on a seasonally adjusted annualized basis. The estimate for January spending was revised downward, from $614.1 billion to $611.9 billion, while the government revised December's spending estimate upward from $627 billion to $629.3 billion.

 

 

"Construction is impacted more by weather than just about any economic segment, and the impact of February's brutal weather is evident in the government's spending figure," said Associated Builders and Contractors Chief Economist Anirban Basu. "ABC continues to forecast a robust nonresidential construction spending recovery in 2015, despite the most recent monthly data, with the obvious exceptions of industry segments most directly and negatively impacted by declines in energy prices.

"The broader U.S. economy has not gotten off to as good a start in 2015 as many had expected with consumer spending growth frustrated by thriftier than anticipated shoppers," said Basu. "With winter behind us and temperatures warming, the expectation is that economic growth will roar back during the second quarter, which is precisely what happened last year. To the extent that this proves to be true, nonresidential construction's recovery can be expected to persist."

Seven of 16 nonresidential construction subsectors posted increases in spending in February on a monthly basis.

  • Manufacturing-related spending expanded 6.8 percent in February and is up 37.9% on a year-over-year basis.
  • Conservation and development-related construction spending expanded 11% for the month and is up 19.8% on a yearly basis.
  • Office-related construction spending expanded 2.4% in February and is up 19% from the same time one year ago.
  • Amusement and recreation-related construction spending gained 2% on a monthly basis and is up 22.5% from the same time last year.
  • Education-related construction spending grew 0.3% for the month, but is down 0.6% on a year-over-year basis.
  • Construction spending in the transportation category grew 0.6% on a monthly basis and has expanded 9.3% on an annual basis.
  • Lodging-related construction spending was up 5% on a monthly basis and 10.4% on a year-over-year basis.

Spending in nine nonresidential construction subsectors failed to rise in February.

  • Healthcare-related construction spending fell 0.9% for the month and is down 4.5% for the year.
  • Spending in the water supply category dropped 7.8% from January, but is still 7.4% higher than at the same time last year.
  • Public safety-related construction spending lost 2.2% on a monthly basis and is down 9.6% on a year-over-year basis.
  • Commercial construction spending lost 1.9% in February, but is up 13.5% on a year-over-year basis.
  • Religious spending fell 4.8% for the month and is down 10.3% from the same time last year.
  • Sewage and waste disposal-related construction spending shed 1.4% for the month, but has grown 19.9% on a 12-month basis.
  • Power-related construction spending fell 4.5% for the month and is 17.2% lower than at the same time one year ago.
  • Lodging construction spending is down 4.4% on a monthly basis, but is up 18.2% on a year-over-year basis.
  • Sewage and waste disposal-related construction spending shed 7.5% for the month, but has grown 16% on a 12-month basis.
  • Power-related construction spending fell 1.1% for the month and is 13.2% lower than at the same time one year ago.
  • Communication-related construction spending fell 6.1% for the month and is down 15.5% for the year.
  • Highway and street-related construction spending was unchanged in February and is up 3.3% compared to the same time last year.

To view the previous spending report, click here.

Related Stories

| Apr 26, 2012

Orange County, Fla. high school receives NAIOP “Public Development of the Year” award

School replacement designed by SchenkelShultz Architecture and constructed by Williams Co.

| Apr 25, 2012

Bubble skyscraper design aims to purify drinking water

The Freshwater Skyscraper will address the issue of increasing water scarcity through a process known as transpiration

| Apr 25, 2012

Thornton Tomasetti/Fore Solutions provides consulting for Biologics Support Center

Project receives LEED Gold Certification.

| Apr 25, 2012

McCarthy introduces high school students to a career in construction

High school students from the ACE Mentoring Program tour the new CHOC Children’s Patient Tower in Orange, Calif.

| Apr 25, 2012

Missner Group names McCrory VP of property management

McCrory will be responsible for overseeing the financial and operational needs of the firm’s commercial real estate portfolio which includes more than two million square feet of property.

| Apr 25, 2012

Rogers joins Morgan/Harbour as senior project manager

Rogers will also manage the construction process and daily activities as well as act as the interface between the subcontractors, owners, municipalities and regulatory agencies

| Apr 25, 2012

J.C. Anderson selected for 50,000-sf build out at Chicago’s DePaul University

The build-out will consist of the construction of new offices, meeting rooms, video rooms and a state-of-the-art multi-tiered Trading Room.

| Apr 24, 2012

ULI Real Estate Consensus Forecast, projects improvements for the real estate industry through 2014

Survey is based on opinions from 38 of the nation’s leading real estate economists and analysts and suggests a marked increase in commercial real estate activity, with total transaction volume expected to rise from $250 billion in 2012 to $312 billion in 2014.

| Apr 24, 2012

Roofing Supply Group acquired by Clayton, Dubilier & Rice

RSG provides a complete offering of residential and commercial roofing materials and related supplies.

| Apr 24, 2012

McLennan named Ashoka Fellow

McLennan was recognized for his work on the Living Building Challenge.

boombox1
boombox2
native1

More In Category



Contractors

Conflict resolution is a critical skill for contractors

Contractors interact with other companies seventeen times a day on average, and nearly half of those interactions (eight) involve conflicts, according to a report by Dodge Construction Network and Dusty Robotics. The study suggests that specialty trade contractors, in particular, rarely experience good resolution from conflicts. 


Museums

UT Dallas opens Morphosis-designed Crow Museum of Asian Art

In Richardson, Tex., the University of Texas at Dallas has opened a second location for the Crow Museum of Asian Art—the first of multiple buildings that will be part of a 12-acre cultural district. When completed, the arts and performance complex, called the Edith and Peter O’Donnell Jr. Athenaeum, will include two museums, a performance hall and music building, a grand plaza, and a dedicated parking structure on the Richardson campus.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021