flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

ABC: Nonresidential construction spending flat in February

Contractors

ABC: Nonresidential construction spending flat in February

The Associated Builders and Contractors forecasts a robust nonresidential construction spending recovery in 2015, despite an underwhelming start.


By Associated Builders and Contractors | April 1, 2015
Nonresidential construction spending flat in February

Commercial construction spending lost 1.9% in February, but is up 13.5% on a year-over-year basis.

Blame it on the weather. That's what many economists have been doing over the past two months as economic data continue to disappoint. Retail sales, durable goods orders, and other categories have not been as strong as anticipated.

Nonresidential construction has often proved an exception, with the industry's momentum gaining steam recently. However, in February, nonresidential construction spending remained virtually unchanged, inching down 0.1% on a monthly basis, according to the April 1 release from the U.S. Census Bureau.

The February 2015 spending figure is 4.6% higher than February 2014, as spending for the month totaled $611.5 billion on a seasonally adjusted annualized basis. The estimate for January spending was revised downward, from $614.1 billion to $611.9 billion, while the government revised December's spending estimate upward from $627 billion to $629.3 billion.

 

 

"Construction is impacted more by weather than just about any economic segment, and the impact of February's brutal weather is evident in the government's spending figure," said Associated Builders and Contractors Chief Economist Anirban Basu. "ABC continues to forecast a robust nonresidential construction spending recovery in 2015, despite the most recent monthly data, with the obvious exceptions of industry segments most directly and negatively impacted by declines in energy prices.

"The broader U.S. economy has not gotten off to as good a start in 2015 as many had expected with consumer spending growth frustrated by thriftier than anticipated shoppers," said Basu. "With winter behind us and temperatures warming, the expectation is that economic growth will roar back during the second quarter, which is precisely what happened last year. To the extent that this proves to be true, nonresidential construction's recovery can be expected to persist."

Seven of 16 nonresidential construction subsectors posted increases in spending in February on a monthly basis.

  • Manufacturing-related spending expanded 6.8 percent in February and is up 37.9% on a year-over-year basis.
  • Conservation and development-related construction spending expanded 11% for the month and is up 19.8% on a yearly basis.
  • Office-related construction spending expanded 2.4% in February and is up 19% from the same time one year ago.
  • Amusement and recreation-related construction spending gained 2% on a monthly basis and is up 22.5% from the same time last year.
  • Education-related construction spending grew 0.3% for the month, but is down 0.6% on a year-over-year basis.
  • Construction spending in the transportation category grew 0.6% on a monthly basis and has expanded 9.3% on an annual basis.
  • Lodging-related construction spending was up 5% on a monthly basis and 10.4% on a year-over-year basis.

Spending in nine nonresidential construction subsectors failed to rise in February.

  • Healthcare-related construction spending fell 0.9% for the month and is down 4.5% for the year.
  • Spending in the water supply category dropped 7.8% from January, but is still 7.4% higher than at the same time last year.
  • Public safety-related construction spending lost 2.2% on a monthly basis and is down 9.6% on a year-over-year basis.
  • Commercial construction spending lost 1.9% in February, but is up 13.5% on a year-over-year basis.
  • Religious spending fell 4.8% for the month and is down 10.3% from the same time last year.
  • Sewage and waste disposal-related construction spending shed 1.4% for the month, but has grown 19.9% on a 12-month basis.
  • Power-related construction spending fell 4.5% for the month and is 17.2% lower than at the same time one year ago.
  • Lodging construction spending is down 4.4% on a monthly basis, but is up 18.2% on a year-over-year basis.
  • Sewage and waste disposal-related construction spending shed 7.5% for the month, but has grown 16% on a 12-month basis.
  • Power-related construction spending fell 1.1% for the month and is 13.2% lower than at the same time one year ago.
  • Communication-related construction spending fell 6.1% for the month and is down 15.5% for the year.
  • Highway and street-related construction spending was unchanged in February and is up 3.3% compared to the same time last year.

To view the previous spending report, click here.

Related Stories

| Jul 2, 2014

First Look: Qatar World Cup stadium design references nomadic heritage

Organizers of the Qatar 2022 World Cup, the Supreme Committee for Delivery and Legacy, recently unveiled designs for the second stadium.

| Jul 2, 2014

SHoP designs what would be Brooklyn's tallest building

JDS Development partners with SHoP to construct a 70-story building at 775-feet tall, unprecedented for downtown Brooklyn.

| Jul 2, 2014

Grimshaw's 'kit of parts' design scheme selected for Qatar sports facilities program

The series of projects, called the Al Farjan Recreational Sports Facilities, have been designed in such a way that the same basic design can be adapted to the specific requirements of each site.

| Jul 1, 2014

China's wild circular skyscraper opens in Guangzhou [slideshow]

The 33-story Guanghzou Circle takes the shape of a giant ribbon spool, with the floor space housed in a series of boxes suspended between two massive "wheels." 

| Jul 1, 2014

Hyper-speed rendering: How Gensler turns BIM models into beauty shots in seconds

In search of a fast rendering solution, Gensler looked to the gaming and moviemaking industries for the next breakthrough tool: Octane Render.

| Jul 1, 2014

Sochi's 'kinetic façade' may steal the show at the Winter Olympics

The temporary pavilion for Russian telecom operator MegaFon will be wrapped with a massive digital "pin screen" that will morph into the shape of any face.

| Jul 1, 2014

Zaha Hadid's flowing Heydar Aliyev Center named Design of the Year for 2014

The Design Museum's Design of the Year award has been awarded to Zaha Hadid's Heydar Aliyev Center. Hadid is not only the first woman to win the top prize, but the center is the first architectural project to win the overall competition.

| Jun 30, 2014

Autodesk acquires design studio The Living, will create Autodesk Studio

The Living, David Benjamin's design studio, has been acquired by Autodesk. Combined, the two will create the Autodesk Studio, which will "create new types of buildings, public installations, prototypes and architectural environments."

| Jun 30, 2014

San Antonio green lights multimodal transit center

The new 90,000-sf development will principally service San Antonio’s growing network of city bus and VIA PRIMO bus rapid transit service, including real-time arrival updates, as well as become an iconic public plaza for the city.

| Jun 30, 2014

Philip Johnson’s iconic World's Fair 'Tent of Tomorrow' to receive much needed restoration funding

A neglected Queens landmark that once reflected the "excitement and hopefulness" at the beginning of the Space Age may soon be restored. 

boombox1
boombox2
native1

More In Category


Brick and Masonry

A journey through masonry reclad litigation

This blog post by Walter P Moore's Mallory Buckley, RRO, PE, BECxP + CxA+BE, and Bob Hancock, MBA, JD, of Munsch Hardt Kopf & Harr PC, explains the importance of documentation, correspondence between parties, and supporting the claims for a Plaintiff-party, while facilitating continuous use of the facility, on construction litigation projects.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021