flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

ABC: Construction activity increases as backlog edges higher

Contractors

ABC: Construction activity increases as backlog edges higher

The backlog indicator is up 1% to 8.5 months during the second quarter of 2015.


By Associated Builders and Contractors | September 9, 2015

Photo: cegoh/Pixabay

Associated Builders and Contractors' (ABC) Construction Backlog Indicator (CBI) expanded by 1% to 8.5 months during the 2nd quarter of 2015. Backlog declined 3% during the 1st quarter, which was punctuated by harsh winter weather and the lingering effects of the West Coast ports slowdown. CBI stands roughly where it did a year ago, indicative of an ongoing recovery in the nation's nonresidential construction industry.

"The nation's nonresidential construction industry is now one of America's leading engines of growth," said ABC Chief Economist Anirban Basu. "The broader U.S. economic recovery is now in its 74th month, but remains under-diversified, led primarily by a combination of consumer spending growth as well as residential and nonresidential construction recovery. Were the overall economy in better shape, the performance of nonresidential construction would not be as closely watched. The economic recovery remains fragile despite a solid GDP growth figure for the second quarter, and must at some point negotiate an interest-rate tightening cycle. Recent stock market volatility has served to remind all stakeholders how delicate the economic recovery continues to be."

 

 

Regional Highlights

  • The West experienced a significant expansion in backlog, rising 1.2 months following the resolution of the West Coast port slowdown, however backlog in the region remains nearly 2.5 months below its year-ago levels, the largest drop of any region. 
  • Backlog in the South has essentially returned to where it was two years ago, in part because of a slowdown in energy-related investment. The implication is that the average contractor remains busy, but boom-like conditions no longer prevail in energy-intensive communities.
  • Despite this, backlog in the South continue to hold the longest average construction backlog.
  • Backlog slipped for a second consecutive quarter in the Northeast, but remains above levels registered during the second half of 2013.
  • See charts and graphs here.
  •  

Industry Highlights

  • Backlog in the heavy industrial segment has never been higher during the length of the series, penetrating the seven-month mark for the first time. This represents an increase of more than two months in average backlog over the past two years. Average backlog was below five months during 2013's second half.
  • Industrial backlog has continued to rise despite the strength of the U.S. dollar, which has contributed to limited export growth.
  • Commercial/institutional backlog has remained above eight months on average for twelve consecutive quarters, a reflection of America's steady rate of employment expansion.
  • Backlog for all industry segments is higher on a year-over-year basis with exception of the commercial/institutional segment. Commercial/institution construction segments have been among the most active from a construction spending perspective in recent years. Therefore, the small adjustment in average backlog is not particularly worrisome.
  • See charts and graphs here.
  •  

 

Highlights by Company Size

  • On a quarterly basis, backlog rose or remained flat across all firm sizes.
  • Average construction backlog is higher or roughly the same as year-ago levels for firms of all size categories with the exception of a half-month drop in backlog among firms generating $100 million or more in annual revenues.
  • The largest firms, however, continue to have the lengthiest average backlog at 10.7 months.
  • See charts and graphs here.

Related Stories

| Aug 25, 2014

Ranked: Top cultural facility sector AEC firms [2014 Giants 300 Report]

Arup, Gensler, and Turner head BD+C's rankings of design and construction firms with the most revenue from cultural facility projects, as reported in the 2014 Giants 300 Report.

| Aug 25, 2014

'Vanity space' makes up large percentage of world's tallest buildings [infographic]

Large portions of some skyscrapers are useless space used to artificially enhance their height, according to the Council on Tall Buildings and Urban Habitat.

| Aug 25, 2014

An easy trick for minimizing construction delays

About one out of every three construction projects is behind schedule or over budget, according to the Construction Industry Institute's Assessment of Owner Project Management Practices and Performance survey. SPONSORED CONTENT

| Aug 21, 2014

Ranked: Top science and technology sector AEC firms [2014 Giants 300 Report]

HDR, Affiliated Engineers, and Skanska top BD+C's rankings of the nation's largest S+T sector design and construction firms.

| Aug 21, 2014

Ranked: Top convention center AEC firms [2014 Giants 300 Report]

Gensler, AECOM, and Hunt Construction top BD+C's rankings of the nation's largest convention center design and construction firms.

| Aug 21, 2014

Apartment construction hits 25-year high

The boost to apartment construction suggests that job gains are encouraging the creation of households.

| Aug 21, 2014

Strategies for providing great customer service

Customers are inherently inefficient and inconvenient to do business with, writes Customer Service Consultant Micah Solomon, in a recent Forbes post. That’s why he believes great customer service depends on understanding this. SPONSORED CONTENT

| Aug 21, 2014

Must See: Detroit's Beaux-Arts parking garage

An opulent Renaissance Revival building in downtown Detroit is being used as a parking garage.

| Aug 20, 2014

Construction backlog indicator reaches all-time high in second quarter

Associated Builders and Contractors (ABC) Construction Backlog Indicator (CBI) reached an all-time high in the second quarter of 2014. CBI improved 5.4 percent and currently stands at 8.5.

| Aug 19, 2014

Goettsch Partners unveils design for mega mixed-use development in Shenzhen [slideshow]

The overall design concept is of a complex of textured buildings that would differentiate from the surrounding blue-glass buildings of Shenzhen.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021