flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Abandoned 15-story high-rise becomes mixed-use luxury apartment building

Multifamily Housing

Abandoned 15-story high-rise becomes mixed-use luxury apartment building

Kimmich Smith Architecture designed the project.


By David Malone, Associate Editor | July 20, 2020
1100 apex exterior

Photos courtesy McShane Construction

1100 Apex, a formerly abandoned 15-story concrete building located in Clearwater, Fla., has undergone an adaptive reuse project to become 134 luxury apartment units with 4,300 sf of ground-floor retail. The project, positioned on a 2.1-acre site, was originally built as an office building in 1972.

After being abandoned in 2009, GSP Development purchased the building and tasked Kimmich Smith Architecture and McShane Construction Company with redeveloping the structure into a Class A multi-family residence.

 

1100 Apex exterior

 

The 134 apartment and townhouse units feature stainless steel appliances, quartz and granite countertops, wood plank flooring, and private balconies. Amenities include a clubhouse, fitness center, putting green, resort-style pool, and an outdoor lounge area with grills, a fire pit, and private cabanas. A parking deck with 202 parking spaces is also included.

The development is expected to spur further economic development in the area.

 

1100 Apex pool deck

Related Stories

Building Team Awards | Jun 1, 2016

Multifamily tower and office building revitalize Philadelphia cathedral

The Philadelphia Episcopal Cathedral capitalizes on hot property to help fund much needed upgrades and programs.

Multifamily Housing | May 19, 2016

Architect Jean Nouvel designs flood-resilient Monad Terrace in Miami Beach

A man-made lagoon with lush vegetation at the base of the complex is expected to adapt to climate change and rising sea levels.

Green | May 16, 2016

Development team picked for largest Passive House project in North America

The 24-story curved building would be 70% more efficient than comparable housing in New York City.

Multifamily Housing | May 12, 2016

Micro apartment complex planned for artsy Austin district

Indie Apartments will consist of 139 one- and two-bedroom units at 350- and 520-sf each.  

Mixed-Use | May 1, 2016

A man-made lagoon with a Bellagio-like fountain will be the highlight of a mixed-use project outside Dallas

Construction will soon begin on housing, retail, and office spaces.

Senior Living Design | Apr 14, 2016

Creating a home for eldercare using the ‘Green House’ design concept

VOA Associates’ Douglas King offers design considerations in implementing the Green House concept in eldercare for continuing care retirement communities.

Multifamily Housing | Apr 7, 2016

Multifamily and Specialized Housing projects honored in 2016 AIA Housing Awards

A San Francisco low-income mixed-use complex, a Los Angeles homeless veterans housing facility, and a series of student residential buildings at UMass were among the winners.

Multifamily Housing | Mar 10, 2016

Access and energy control app clicks with student housing developers and managers

Ease of installation is one of StratIS’s selling features.

Multifamily Housing | Mar 7, 2016

Multifamily developers face steep costs for violating Fair Housing Act

Designers without previous multifamily experience could overlook key provisions.

High-rise Construction | Mar 3, 2016

HOK’s Hertsmere House will be Western Europe’s tallest residential tower

Recently approved for development, the 67-story building will have more than 900 units.

boombox1
boombox2
native1

More In Category

Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021