flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Abandoned 15-story high-rise becomes mixed-use luxury apartment building

Multifamily Housing

Abandoned 15-story high-rise becomes mixed-use luxury apartment building

Kimmich Smith Architecture designed the project.


By David Malone, Associate Editor | July 20, 2020
1100 apex exterior

Photos courtesy McShane Construction

1100 Apex, a formerly abandoned 15-story concrete building located in Clearwater, Fla., has undergone an adaptive reuse project to become 134 luxury apartment units with 4,300 sf of ground-floor retail. The project, positioned on a 2.1-acre site, was originally built as an office building in 1972.

After being abandoned in 2009, GSP Development purchased the building and tasked Kimmich Smith Architecture and McShane Construction Company with redeveloping the structure into a Class A multi-family residence.

 

1100 Apex exterior

 

The 134 apartment and townhouse units feature stainless steel appliances, quartz and granite countertops, wood plank flooring, and private balconies. Amenities include a clubhouse, fitness center, putting green, resort-style pool, and an outdoor lounge area with grills, a fire pit, and private cabanas. A parking deck with 202 parking spaces is also included.

The development is expected to spur further economic development in the area.

 

1100 Apex pool deck

Related Stories

Multifamily Housing | Sep 12, 2019

Meet the masters of offsite construction

Prescient combines 5D software, clever engineering, and advanced robotics to create prefabricated assemblies for apartment buildings and student housing.

Multifamily Housing | Sep 10, 2019

Carbon-neutral apartment building sets the pace for scalable affordable housing

Project Open has no carbon footprint, but the six-story, solar-powered building is already leaving its imprint on Salt Lake City’s multifamily landscape. 

Multifamily Housing | Sep 4, 2019

Peloton to multifamily communities: Drop dead

Peloton will no longer sell its bikes to apartment communities.

| Sep 3, 2019

Top 10 indoor amenities in multifamily developments for 2019

In-unit washer/dryer heads our ranking of the top indoor amenities in multifamily housing developments. 

AEC Innovators | Aug 27, 2019

7 AEC industry disruptors and their groundbreaking achievements

From building prefab factories in the sky to incubating the next generation of AEC tech startups, our 2019 class of AEC Innovators demonstrates that the industry is poised for a shakeup. Meet BD+C’s 2019 AEC Innovators.

AEC Tech | Aug 25, 2019

Deluxe parking: A condo building in Philadelphia offers its owners a completely automated parking service

This is the first “palletless” system that Westfalia Technologies has installed.

Multifamily Housing | Aug 22, 2019

40-story residential tower to rise near Seattle’s Pike Place Market

Hewitt architects is designing the project.

Multifamily Housing | Aug 19, 2019

Affordable, senior development rises in the Bronx

RKTB Architects is designing the project.

Multifamily Housing | Aug 19, 2019

Top 10 outdoor amenities in multifamily housing for 2019

Top 10 results in the “Outdoor Amenities” category in our Multifamily Design+Construction Amenities Survey 2019.

Market Data | Aug 19, 2019

Multifamily market sustains positive cycle

Year-over-year growth tops 3% for 13th month. Will the economy stifle momentum?

boombox1
boombox2
native1

More In Category


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021