flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Abandoned 15-story high-rise becomes mixed-use luxury apartment building

Multifamily Housing

Abandoned 15-story high-rise becomes mixed-use luxury apartment building

Kimmich Smith Architecture designed the project.


By David Malone, Associate Editor | July 20, 2020
1100 apex exterior

Photos courtesy McShane Construction

1100 Apex, a formerly abandoned 15-story concrete building located in Clearwater, Fla., has undergone an adaptive reuse project to become 134 luxury apartment units with 4,300 sf of ground-floor retail. The project, positioned on a 2.1-acre site, was originally built as an office building in 1972.

After being abandoned in 2009, GSP Development purchased the building and tasked Kimmich Smith Architecture and McShane Construction Company with redeveloping the structure into a Class A multi-family residence.

 

1100 Apex exterior

 

The 134 apartment and townhouse units feature stainless steel appliances, quartz and granite countertops, wood plank flooring, and private balconies. Amenities include a clubhouse, fitness center, putting green, resort-style pool, and an outdoor lounge area with grills, a fire pit, and private cabanas. A parking deck with 202 parking spaces is also included.

The development is expected to spur further economic development in the area.

 

1100 Apex pool deck

Related Stories

Coronavirus | Aug 25, 2020

Video: 5 building sectors to watch amid COVID-19

RCLCO's Brad Hunter reveals the winners and non-winners of the U.S. real estate market during the coronavirus pandemic.

Multifamily Housing | Aug 24, 2020

Portland’s zoning reform looks to boost the ‘missing middle’ of housing

The city council in Portland, Ore., recently approved the “Residential Infill Project” (RIP), a package of amendments to the city’s zoning code that legalizes up to four homes on nearly any residential lot and sharply limits building sizes.

Multifamily Housing | Aug 24, 2020

Texaco’s century-old headquarters is now a luxury apartment community

After sitting vacant for nearly three decades, the former home of Texaco, Inc. has been converted into a 17-story, 286-unit apartment building in the heart of downtown Houston.

Multifamily Housing | Aug 23, 2020

Designing affordable housing on odd urban lots in LA

"Misfit parcels" could be the key to providing more affordable housing in Los Angeles, say two experienced multifamily housing designers.

Multifamily Housing | Aug 16, 2020

TCA Architects specifies Engineered Floors products for 304-unit apartment complex in Tracy, Calif.

TCA Architects specified Lewis Rigid Stone Polymer floating plank and Lewis Gold 100% Solution-Dyed high-performance fiber carpet for Harvest in Tracy, Calif.

Multifamily Housing | Aug 3, 2020

71-unit 100% affordable housing development breaks ground in Mountain View, Calif.

Van Meter Williams Pollack is designing the project.

Multifamily Housing | Aug 2, 2020

Stantec-designed 17 West mixed-use development completed in Miami Beach

Stantec-designed 17 West mixed-use development completed, with first Trader Joe's in Miami Beach.

Multifamily Housing | Jul 31, 2020

Railings manufacturer VistaPro launches its new website

VistaPro Architectural Railing Solutions launches new website.

Multifamily Housing | Jul 29, 2020

Multifamily construction proposal activity sees modest rebound in Q2 2020

Among the firms that work in the multifamily sector, 31% said that proposal activity increased in the second quarter, while 24% said it decreased.

boombox1
boombox2
native1

More In Category


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021