AAMA announced the launch of the AAMA Virtual Library (AVL) during its National Fall Conference in Palm Desert, Calif., on Mon., Sept. 26.
This new program offers a system for members to purchase annual licenses in order to offer electronic versions of AAMA publications in an effort to make AAMA’s technical information resources more readily available to their employees.
The launch includes 15 document sets that are read only files viewable with Adobe Flash software. Document groupings include topics such as windows and sliding glass doors, metal curtain walls, storefront and entrance manual, skylights and space enclosures, as well as vinyl and polymer resource set and the 101/NAFS documents. Also available are document bundles for finishes, hardware, general testing, field testing and laboratory testing.
Initially, the AVL is only offered to AAMA Category 1 corporate members, technical consultant and professional members. Agreements are offered on a one-year basis that requires renewal on the anniversary of the license agreement. If a member resigns from AAMA at any time during the license agreement term, the license will automatically expire. It is preferred that renewals be submitted with AAMA membership renewals.
If a publication is revised and re-published during the life of an active license agreement, a notice will be sent to licensees, and the online AVL will be updated automatically. For more information visit www.aamanet.org. BD+C
Related Stories
| Sep 6, 2012
CPPI awarded $30.3 million contract for University of Florida’s Harrell Medical Education Building
The specialized interdisciplinary learning environment will serve as a focal point for integration and program development for all primary care educational activities in the College of Medicine.
| Sep 5, 2012
Pagano joins Thornton Tomasetti as Vice President in Newark office
Pagano is a Certified Energy Planner and Certified Energy Manager through the Association of Energy Engineers.
| Aug 30, 2012
John S Clark Co. completes teaching lab at UNC Wilmington
Three-story building provides offices, classrooms, and labs.
| Aug 29, 2012
BOND completes South Cove Community Health Center
$11 million, 21,000 square foot community health center opens in Quincy, Mass.
| Aug 29, 2012
Mamayek joins HDR as Design Principal in Boston
He will work closely with the Executive Committee and business group leaders to expand and promote HDR’s Design Excellence initiatives in the Northeast region.
| Aug 28, 2012
McCarthy begins construction on transportation center at Bob Hope Airport
Designed to meet LEED silver certification standards, the facility will feature unique, above ground base isolators that will resist a maximum credible earthquake.
| Aug 28, 2012
Wisnewski Blair & Associates changes name to HGA Mid-Atlantic
New name reflects firm's growing design resources on East Coast.
| Aug 24, 2012
Meis heads to Woods Bagot Sport
Staples Center, Paul Brown Stadium architect to leverage global studio to serve clients worldwide.
| Aug 21, 2012
Under 40 Leadership Summit slated for October 3-5 in Chicago
Attendees will be given an exclusive technical tour of Wrigley Field, led by Steven J. Jacobsen, CDP, who has been retained by the Chicago Cubs to create the business plan and high-level concepts to evaluate the feasibility of various renovation options for this iconic sports venue; and Carl Rice, Cubs’ Vice President, Baseball Operations.