Sto Corp., a leader in facade claddings, air barriers, coatings, and renovation systems, has made recent advancements in its branded Sto Panel Technology business. Sto Panel Technology, which produces fully engineered and tested prefabricated finished exterior megapanel systems, is now introducing the versatility of 3D printing to its megapanels with StoPanel 3DP powered by Branch Technology. Sto is also bringing megapanel walls and windows together in a more efficient and integrated way through a collaboration with Kawneer North America.
“At Sto, our overarching goal is to provide architects, designers, and building professionals with the widest range of aesthetics through the most complete collection of building enclosure systems via our offsite construction technologies,” said Tyson Kindstrom, vice president of industrialized construction with Sto. “Megapanels continue to present a host of value propositions to construction professionals – from design freedom, greater efficiencies, and collapsed project timelines to potential cost savings.”
STO/BRANCH TECHNOLOGY: '3D DESIGN FREEDOM' FOR EXTERIOR WALLS
StoPanel 3DP delivers unprecedented three-dimensional design freedom for exterior walls. The megapanel system includes all the building envelope control layers integrated with a unique, fully customizable 3D-printed composite facade. The 3D component, called the Composite Core, is lightweight, structurally robust, and easy to install. Branch’s unique Cellular Fabrication (C-Fab) 3D printing process gives designers and architects the ability to stretch the limits of their creativity. The technology enables StoPanel 3DP to create virtually any 3D shape or form at a large scale.
“StoPanel 3DP bridges the gap between design freedom and precision manufacturing to achieve phenomenal results for the building envelope,” said Karine Galla, senior project manager for Sto. “To arrive at this solution, Branch Technology robotically prints a lightweight polymer matrix and then fills that matrix with an insulating foam, providing continuous insulation for the wall panel. Digital files are used versus shop drawings in this manufacturing process, ensuring extreme accuracy that is true to the original design. The result is three-dimensional exterior facade that turns heads and sets a building’s design apart.”
STO AND KAWNEER: INTEGRATING WALLS AND WINDOWS
Sto Panel Technology’s collaboration with Kawneer North America integrates windows and walls together in the manufacturing process, achieving greater efficiencies and improved safety on the job site. Kawneer window receptors are installed during the offsite production of the StoPanel megapanels.
“This has a measurable impact on window installation once StoPanels have been shipped to a location,” said Richard Martens, director of business development for Sto. “By fully integrating the prefabricated wall and window system, crews can install the windows from the inside of the building versus shipping the windows with the wall panels or performing installations from the exterior of the building. It allows for a seamless installation option that drives down material and labor costs while reducing site safety risks.”
Sto Panel Technology and Kawneer North America have conducted independent, third-party testing of the StoPanel with Kawneer windows and customized receptors. The testing covered air leakage resistance, dynamic water penetration resistance, and structural loading. The results showed no water penetration through the StoPanel or the window receptor and perimeter sealant assembly at a test pressure of 10.0 psf, while also meeting a design pressure rating of 40 psf. The system consisting of the StoPanel, Kawneer window and receptor installed in the StoPanel, and window perimeter sealant met the requirements for a 40 psf DP rating when tested in accordance with AAMA 1010.
Sto and Kawneer North America are designing a system with a new high thermal window and receptor to meet more stringent codes. It will also be tested to AAMA 1010.
For more information on Sto Panel, visit www.stopanel.com.
Related Stories
| May 16, 2012
AEG releases 3D video of L.A.'s Farmers Field
The Los Angeles Convention Center footage depicts the new convention center hall spaces, including a new lobby above Pico Boulevard, pre-function space, and what will be the largest multi-purpose ballroom in Los Angeles.
| May 16, 2012
Balfour Beatty Construction taps Kiger as VP of operations
Kiger will manage current relationships and pursue other strategic clients, including select healthcare clients and strategic project pursuits in the Central Tennessee region.
| May 15, 2012
One World Trade Center goes to new height of sustainability
One of the biggest challenges in developing this concrete mixture was meeting the Port Authority of New York/New Jersey’s strict requirement for the replacement of cement.
| May 15, 2012
Don’t be insulated from green building
Examining the roles of insulation and manufacturing in sustainability’s growth.
| May 15, 2012
National Tradesmen Day set for Sept. 21
IRWIN Tools invites the nation to honor "The Real Working Hands that Build America and Keep it Running Strong".
| May 15, 2012
SAGE Electrochromics to become wholly owned subsidiary of Saint-Gobain
This deal will help SAGE expand into international markets, develop new products and complete construction of the company’s new, state-of-the-art manufacturing facility in Faribault, Minn.
| May 14, 2012
SOM to break ground on supertall structure in China
The 1,740-feet (530-meter) tall tower will house offices, 300 service apartments and a 350-room, 5-star hotel beneath an arched top.
| May 14, 2012
Adrian Smith + Gordon Gill Architecture design Seoul’s Dancing Dragons
Supertall two-tower complex located in Seoul’s Yongsan International Business District.
| May 14, 2012
ArchiCAD e-Specs integration unveiled
Architects, engineers and construction professionals use InterSpec’s e-SPECS products on thousands of projects annually to maintain synchronization between construction models, drawings, and project specifications.
| May 11, 2012
Betz promoted to senior vice president for McCarthy’s San Diego Office
He will oversee client relations, estimating, office operations and personnel as well as integration of the company’s scheduling, safety and contracts departments.