flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Call for Kitchen+Bath projects and products – for next issue of "MULTIFAMILY Design+Construction" (no charge to participate!)

Multifamily Housing

Call for Kitchen+Bath projects and products – for next issue of "MULTIFAMILY Design+Construction" (no charge to participate!)

Multifamily AEC firms and developers and product manufactions can submit Kitchen+Bath projects and products – for the next issue of "MULTIFAMILY Design+Construction."


By ROBERT CASSIDY, EDITOR, MULTIFAMILY DESIGN+CONSTRUCTION | May 3, 2022
Image by Solomon Rodgers from Pixabay
Multifamily design firms and product manufacturers can submit kitchen+bath photos for the next issue of Mutifamily Design+Construction. Image by Solomon Rodgers from Pixabay.
MULTIFAMILY Design+Construction (circulation: 42,134) is seeking photos of your best new Kitchen+Bath installations in multifamily housing communities and best Kitchen+Bath products for Multifamily for our Summer Issue (August), to accompany our "Kitchen+Bath Amenities Survey 2022." There is no charge for your submittal.
 

ABSOLUTELY NO CHARGE TO PARTICIPATE!!!

 
Here’s what we need (deadline: Friday, May 20):
 
1. HIGH-QUALITY, HIGH-RESOLUTION PHOTOS (300 dpi, no renderings!), with BRIEF CAPTIONS (up to 50 words). OK to have people in photos – preferably real people, not actors. Casual, candid, not posed. Must have PHOTO CREDITS for all photos.

2. PROJECT DESCRIPTION (preferably Word file or email text)—project name, location, # of units, construction cost or total cost (if public), Developer or Owner firm, key AEC firms involved, esp. which firm designed the kitchen/bath (architect, interior designer, kitchen or bath consultant, etc.)

Projects must have been completed in the last 12-24 months (please give approx. Occupancy Date or Construction Completion Date). Please do not submit projects that are still in design or under construction. No renderings!

3. TELL US WHAT MAKES THIS KITCHEN+BATH PROJECT SPECIAL Briefly, why would multifamily designers, owners, and developers be interested in this Kitchen+Bath installation? Any special design aspects, intriguing materials/appliances/fixtures, interesting client target group, unusually difficult obstacles to overcome, unusual project goals, etc.?

4.  SUBMITTER'S CONTACT INFO – including mobile phone (in case we have a question).

5. DEADLINE Please submit all materials by Thursday, May 26, 2022.

Send all materials to: Rob Cassidy, Editor, MFDC: rcassidy@sgcmail.com; 773-220-3555.

ATTENTION! PRODUCT MANUFACTURERS –
YOU ARE WELCOME TO PARTICIPATE (IT'S FREE!)

Kitchen+Bath Product Manufacturers: Follow the instructions above to send us your K+B product photos and K+B product installation case studies.

TELL US WHAT MAKES THIS KITCHEN+BATH PRODUCT SPECIAL (preferably in a Word file or email text) why MFDC readers would be interested in the product: special design aspects, intriguing materials/appliances/fixtures, interesting customer target group (e.g., smaller apartments), unusual obstacles to overcome, demanding product goals, certifications, etc.

DEADLINE Thursday, May 26, 2022.

Send all materials to: Rob Cassidy, Editor, MFDC: rcassidy@sgcmail.com; 773-220-3555.

Related Stories

Codes and Standards | Feb 21, 2022

More bad news on sea level rise for U.S. coastal areas

A new government report predicts sea levels in the U.S. of 10 to 12 inches higher by 2050, with some major cities on the East and Gulf coasts experiencing damaging floods even on sunny days.

Urban Planning | Feb 14, 2022

5 steps to remake suburbs into green communities where people want to live, work, and play

Stantec's John Bachmann offers proven tactic for retrofitting communities for success in the post-COVID era.

Senior Living Design | Feb 11, 2022

Design for senior living: A chat with Rocky Berg, AIA

Rob Cassidy, Editor of MULTIFAMILY Design + Construction, chats with Rocky Berg, AIA, Principal with Dallas architecture firm three, about how to design senior living communities to meet the needs of the owner, seniors, their families, and staff.

Multifamily Housing | Feb 8, 2022

Suffolk to build Alba Palm Beach

The project will feature 55 residences.

| Feb 4, 2022

New apartment complex Dixon Place honors the history of Salt Lake City

Salt Lake City’s Sugar House neighborhood has been experiencing somewhat of a renaissance as of late, and the opening of new apartment community Dixon Place continues that trend. MVE + Partners took leadership in the design of the 59-unit, Class A development.  

Sponsored | Steel Buildings | Jan 25, 2022

Multifamily + Hospitality: Benefits of building in long-span composite floor systems

Long-span composite floor systems provide unique advantages in the construction of multi-family and hospitality facilities. This introductory course explains what composite deck is, how it works, what typical composite deck profiles look like and provides guidelines for using composite floor systems. This is a nano unit course.

Coronavirus | Jan 20, 2022

Advances and challenges in improving indoor air quality in commercial buildings

Michael Dreidger, CEO of IAQ tech startup Airsset speaks with BD+C's John Caulfield about how building owners and property managers can improve their buildings' air quality.

3D Printing | Jan 12, 2022

Using 3D-printed molds to create unitized window forms

COOKFOX designer Pam Campbell and Gate Precast's Mo Wright discuss the use of 3D-printed molds from Oak Ridge National Lab to create unitized window panels for One South First, a residential-commercial high-rise in Brooklyn, N.Y.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021