ABSOLUTELY NO CHARGE TO PARTICIPATE!!!
2. PROJECT DESCRIPTION (preferably Word file or email text)—project name, location, # of units, construction cost or total cost (if public), Developer or Owner firm, key AEC firms involved, esp. which firm designed the kitchen/bath (architect, interior designer, kitchen or bath consultant, etc.)
Projects must have been completed in the last 12-24 months (please give approx. Occupancy Date or Construction Completion Date). Please do not submit projects that are still in design or under construction. No renderings!
3. TELL US WHAT MAKES THIS KITCHEN+BATH PROJECT SPECIAL Briefly, why would multifamily designers, owners, and developers be interested in this Kitchen+Bath installation? Any special design aspects, intriguing materials/appliances/fixtures, interesting client target group, unusually difficult obstacles to overcome, unusual project goals, etc.?
4. SUBMITTER'S CONTACT INFO – including mobile phone (in case we have a question).
5. DEADLINE Please submit all materials by Thursday, May 26, 2022.
Send all materials to: Rob Cassidy, Editor, MFDC: rcassidy@sgcmail.com; 773-220-3555.
ATTENTION! PRODUCT MANUFACTURERS –
YOU ARE WELCOME TO PARTICIPATE (IT'S FREE!)
Kitchen+Bath Product Manufacturers: Follow the instructions above to send us your K+B product photos and K+B product installation case studies.
TELL US WHAT MAKES THIS KITCHEN+BATH PRODUCT SPECIAL (preferably in a Word file or email text) why MFDC readers would be interested in the product: special design aspects, intriguing materials/appliances/fixtures, interesting customer target group (e.g., smaller apartments), unusual obstacles to overcome, demanding product goals, certifications, etc.
DEADLINE Thursday, May 26, 2022.
Send all materials to: Rob Cassidy, Editor, MFDC: rcassidy@sgcmail.com; 773-220-3555.
Related Stories
Codes and Standards | Oct 17, 2022
Ambitious state EV adoption goals put pressure on multifamily owners to provide chargers
California’s recently announced ban on the sale of new gas-powered vehicles starting in 2035—and New York’s recent decision to follow suit—are putting pressure on multifamily property owners to install charging stations for tenants.
Multifamily Housing | Oct 7, 2022
Design for new Ft. Lauderdale mixed-use tower features sequence of stepped rounded volumes
The newly revealed design for 633 SE 3rd Ave., a 47-story, mixed-use tower in Ft. Lauderdale, features a sequence of stepped rounded volumes that ease the massing of the tower as it rises.
Multifamily Housing | Oct 5, 2022
Co-living spaces, wellness-minded designs among innovations in multifamily housing
The booming multifamily sector shows no signs of a significant slowdown heading into 2023. Here is a round up of Giants 400 firms that are driving innovation in this sector.
Fire and Life Safety | Oct 4, 2022
Fire safety considerations for cantilevered buildings
Bold cantilevered designs are prevalent today, as developers and architects strive to maximize space, views, and natural light in buildings. Cantilevered structures, however, present a host of challenges for building teams, according to José R. Rivera, PE, Associate Principal and Director of Plumbing and Fire Protection with Lilker.
| Oct 4, 2022
Rental property owners want access to utility usage data for whole properties
As pressure from investors for ESG reporting mounts, owners of multifamily properties increasingly look to collect whole-building utility usage data.
Resiliency | Sep 30, 2022
Designing buildings for wildfire defensibility
Wold Architects and Engineers' Senior Planner Ryan Downs, AIA, talks about how to make structures and communities more fire-resistant.
Sponsored | Multifamily Housing | Sep 16, 2022
In-Stock Sheathing System Saves Multifamily Project Timeline
Multifamily Housing | Sep 15, 2022
Toronto’s B-Line Condominiums completed using prefabricated panels
B-Line Condos, Toronto, completed using Sto Panel Technology.
Multifamily Housing | Sep 15, 2022
Heat Pumps in Multifamily Projects
RMI's Lacey Tan gives the basics of heat pumps and how they can reduce energy costs and carbon emissions in apartment projects.