flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Call for Kitchen+Bath projects and products – for next issue of "MULTIFAMILY Design+Construction" (no charge to participate!)

Multifamily Housing

Call for Kitchen+Bath projects and products – for next issue of "MULTIFAMILY Design+Construction" (no charge to participate!)

Multifamily AEC firms and developers and product manufactions can submit Kitchen+Bath projects and products – for the next issue of "MULTIFAMILY Design+Construction."


By ROBERT CASSIDY, EDITOR, MULTIFAMILY DESIGN+CONSTRUCTION | May 3, 2022
Image by Solomon Rodgers from Pixabay
Multifamily design firms and product manufacturers can submit kitchen+bath photos for the next issue of Mutifamily Design+Construction. Image by Solomon Rodgers from Pixabay.
MULTIFAMILY Design+Construction (circulation: 42,134) is seeking photos of your best new Kitchen+Bath installations in multifamily housing communities and best Kitchen+Bath products for Multifamily for our Summer Issue (August), to accompany our "Kitchen+Bath Amenities Survey 2022." There is no charge for your submittal.
 

ABSOLUTELY NO CHARGE TO PARTICIPATE!!!

 
Here’s what we need (deadline: Friday, May 20):
 
1. HIGH-QUALITY, HIGH-RESOLUTION PHOTOS (300 dpi, no renderings!), with BRIEF CAPTIONS (up to 50 words). OK to have people in photos – preferably real people, not actors. Casual, candid, not posed. Must have PHOTO CREDITS for all photos.

2. PROJECT DESCRIPTION (preferably Word file or email text)—project name, location, # of units, construction cost or total cost (if public), Developer or Owner firm, key AEC firms involved, esp. which firm designed the kitchen/bath (architect, interior designer, kitchen or bath consultant, etc.)

Projects must have been completed in the last 12-24 months (please give approx. Occupancy Date or Construction Completion Date). Please do not submit projects that are still in design or under construction. No renderings!

3. TELL US WHAT MAKES THIS KITCHEN+BATH PROJECT SPECIAL Briefly, why would multifamily designers, owners, and developers be interested in this Kitchen+Bath installation? Any special design aspects, intriguing materials/appliances/fixtures, interesting client target group, unusually difficult obstacles to overcome, unusual project goals, etc.?

4.  SUBMITTER'S CONTACT INFO – including mobile phone (in case we have a question).

5. DEADLINE Please submit all materials by Thursday, May 26, 2022.

Send all materials to: Rob Cassidy, Editor, MFDC: rcassidy@sgcmail.com; 773-220-3555.

ATTENTION! PRODUCT MANUFACTURERS –
YOU ARE WELCOME TO PARTICIPATE (IT'S FREE!)

Kitchen+Bath Product Manufacturers: Follow the instructions above to send us your K+B product photos and K+B product installation case studies.

TELL US WHAT MAKES THIS KITCHEN+BATH PRODUCT SPECIAL (preferably in a Word file or email text) why MFDC readers would be interested in the product: special design aspects, intriguing materials/appliances/fixtures, interesting customer target group (e.g., smaller apartments), unusual obstacles to overcome, demanding product goals, certifications, etc.

DEADLINE Thursday, May 26, 2022.

Send all materials to: Rob Cassidy, Editor, MFDC: rcassidy@sgcmail.com; 773-220-3555.

Related Stories

| Aug 11, 2010

Arup, SOM top BD+C's ranking of the country's largest mixed-use design firms

A ranking of the Top 75 Mixed-Use Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

10% of world's skyscraper construction on hold

Emporis, the largest provider of global building data worldwide, reported that 8.7% of all skyscrapers listed as "under construction" in its database had been put on hold. Most of these projects have been halted in the second half of 2008. According to Emporis statistics, the United States had been hit the worst: at the beginning of 2008, "Met 3" in Miami was the only U.S. skyscraper listed as being "on hold". In the second half of the year, 19 projects followed suit.

| Aug 11, 2010

Structure Tone, Turner among the nation's busiest reconstruction contractors, according to BD+C's Giants 300 report

A ranking of the Top 75 Reconstruction Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants

| Aug 11, 2010

Skanska completes $74 million Harbor Towers project six months ahead of schedule

Skanska USA Building Inc. announced the completion of a $74 million rehabilitation project at Harbor Towers, a 40-story luxury condominium complex comprising two towers located on Boston’s waterfront. Skanska served as Program Manager and oversaw the repair and replacement work that dramatically enhanced the reliability, cost-effectiveness, and energy efficiency of the buildings’ MEP systems.

| Aug 11, 2010

Best AEC Firms of 2011/12

Later this year, we will launch Best AEC Firms 2012. We’re looking for firms that create truly positive workplaces for their AEC professionals and support staff. Keep an eye on this page for entry information. +

| Aug 11, 2010

Manitoba Hydro Place, Tornado Tower among world's 'best tall buildings,' according to the Council on Tall Buildings and Urban Habitat

The Council on Tall Buildings and Urban Habitat last week announced the winners of its annual “Best Tall Building” awards for 2009, recognizing one outstanding tall building from each of four geographical regions: Americas, Asia & Australia, Europe, and Middle East & Africa. This year’s winners are: Manitoba Hydro Place, Winnipeg, Canada; Linked Hybrid, Beijing, China; The Broadgate Tower, London, UK; Tornado Tower, Doha, Qatar.

| Aug 11, 2010

Call for entries: Building enclosure design awards

The Boston Society of Architects and the Boston chapter of the Building Enclosure Council (BEC-Boston) have announced a High Performance Building award that will assess building enclosure innovation through the demonstrated design, construction, and operation of the building enclosure.

| Aug 11, 2010

CampusBrands Inc., NYLO Hotels team to launch student housing franchise brand

Which would you choose: the cramped quarters, thin mattresses, and crowded communal bathrooms of dormitory life or a new type of student housing with comfortable couches, a game room, fitness center, Wi-Fi in every room, flat-screen televisions and maybe even a theater?

boombox1
boombox2
native1

More In Category

Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021