flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Call for Kitchen+Bath projects and products – for next issue of "MULTIFAMILY Design+Construction" (no charge to participate!)

Multifamily Housing

Call for Kitchen+Bath projects and products – for next issue of "MULTIFAMILY Design+Construction" (no charge to participate!)

Multifamily AEC firms and developers and product manufactions can submit Kitchen+Bath projects and products – for the next issue of "MULTIFAMILY Design+Construction."


By ROBERT CASSIDY, EDITOR, MULTIFAMILY DESIGN+CONSTRUCTION | May 3, 2022
Image by Solomon Rodgers from Pixabay
Multifamily design firms and product manufacturers can submit kitchen+bath photos for the next issue of Mutifamily Design+Construction. Image by Solomon Rodgers from Pixabay.
MULTIFAMILY Design+Construction (circulation: 42,134) is seeking photos of your best new Kitchen+Bath installations in multifamily housing communities and best Kitchen+Bath products for Multifamily for our Summer Issue (August), to accompany our "Kitchen+Bath Amenities Survey 2022." There is no charge for your submittal.
 

ABSOLUTELY NO CHARGE TO PARTICIPATE!!!

 
Here’s what we need (deadline: Friday, May 20):
 
1. HIGH-QUALITY, HIGH-RESOLUTION PHOTOS (300 dpi, no renderings!), with BRIEF CAPTIONS (up to 50 words). OK to have people in photos – preferably real people, not actors. Casual, candid, not posed. Must have PHOTO CREDITS for all photos.

2. PROJECT DESCRIPTION (preferably Word file or email text)—project name, location, # of units, construction cost or total cost (if public), Developer or Owner firm, key AEC firms involved, esp. which firm designed the kitchen/bath (architect, interior designer, kitchen or bath consultant, etc.)

Projects must have been completed in the last 12-24 months (please give approx. Occupancy Date or Construction Completion Date). Please do not submit projects that are still in design or under construction. No renderings!

3. TELL US WHAT MAKES THIS KITCHEN+BATH PROJECT SPECIAL Briefly, why would multifamily designers, owners, and developers be interested in this Kitchen+Bath installation? Any special design aspects, intriguing materials/appliances/fixtures, interesting client target group, unusually difficult obstacles to overcome, unusual project goals, etc.?

4.  SUBMITTER'S CONTACT INFO – including mobile phone (in case we have a question).

5. DEADLINE Please submit all materials by Thursday, May 26, 2022.

Send all materials to: Rob Cassidy, Editor, MFDC: rcassidy@sgcmail.com; 773-220-3555.

ATTENTION! PRODUCT MANUFACTURERS –
YOU ARE WELCOME TO PARTICIPATE (IT'S FREE!)

Kitchen+Bath Product Manufacturers: Follow the instructions above to send us your K+B product photos and K+B product installation case studies.

TELL US WHAT MAKES THIS KITCHEN+BATH PRODUCT SPECIAL (preferably in a Word file or email text) why MFDC readers would be interested in the product: special design aspects, intriguing materials/appliances/fixtures, interesting customer target group (e.g., smaller apartments), unusual obstacles to overcome, demanding product goals, certifications, etc.

DEADLINE Thursday, May 26, 2022.

Send all materials to: Rob Cassidy, Editor, MFDC: rcassidy@sgcmail.com; 773-220-3555.

Related Stories

| Nov 3, 2014

Novel 'self-climbing' elevator operates during construction of high-rise buildings

The JumpLift system from KONE uses a mobile machine room that moves upward as the construction progresses, speeding construction of tall towers. 

| Nov 3, 2014

Cairo's ultra-green mixed-use development will be topped with flowing solar canopy

The solar canopy will shade green rooftop terraces and sky villas atop the nine-story structure.

| Oct 31, 2014

Dubai plans world’s next tallest towers

Emaar Properties has unveiled plans for a new project containing two towers that will top the charts in height, making them the world’s tallest towers once completed.

| Oct 29, 2014

Better guidance for appraising green buildings is steadily emerging

The Appraisal Foundation is striving to improve appraisers’ understanding of green valuation.

| Oct 27, 2014

Studio Gang Architects designs residential tower with exoskeleton-like exterior for Miami

Jeanne Gang's design reinvents the Florida room with shaded, asymmetrical balconies.

| Oct 21, 2014

Passive House concept gains momentum in apartment design

Passive House, an ultra-efficient building standard that originated in Germany, has been used for single-family homes since its inception in 1990. Only recently has the concept made its way into the U.S. commercial buildings market. 

| Oct 21, 2014

Perkins Eastman white paper explores state of the senior living industry in the Carolinas

Among the experts interviewed for the white paper, there was a general consensus that the model for continuing-care retirement communities is changing, driven by both the changing consumers and more prevalent global interest on the effects of aging.

| Oct 16, 2014

Perkins+Will white paper examines alternatives to flame retardant building materials

The white paper includes a list of 193 flame retardants, including 29 discovered in building and household products, 50 found in the indoor environment, and 33 in human blood, milk, and tissues.

| Oct 15, 2014

Harvard launches ‘design-centric’ center for green buildings and cities

The impetus behind Harvard's Center for Green Buildings and Cities is what the design school’s dean, Mohsen Mostafavi, describes as a “rapidly urbanizing global economy,” in which cities are building new structures “on a massive scale.” 

| Oct 15, 2014

Final touches make 432 Park Avenue tower second tallest in New York City

Concrete has been poured for the final floors of the residential high-rise at 432 Park Avenue in New York City, making it the city’s second-tallest building and the tallest residential tower in the Western Hemisphere.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021