Early results from MULTIFAMILY Design+Construction's inaugural Kitchen + Bath survey of multifamily developers, architects, contractors, and other specifiers make it clear that supply chain problems are impacting apartment, condo, and townhome projects.
To take the survey – with a chance to win one of 10 $50 debit cards – go to MFDC K+B Survey. To be qualified to participate, your company must be actively involved in multifamily design, development, or construction, and you must give your name, company name, and email at the end of the survey.
HOW COVID, UKRAINE WAR ARE IMPACTING SPECIFIERS
We asked: "What K+B amenities have you had DIFFICULTY SOURCING due to the Covid pandemic or Ukraine war? What are you doing about this?"
Appliances came up more often than any other product category. "We've been purchasing them early and storing in our own warehouses or changing our spec to purchase models that are in stock/available," said one respondent.
"It's been difficult getting appliance packages with the same manufacturer," said another respondent. "We're needing to mix manufacturers and appliances."
Yet another said, of appliances, "We're ordering early and being more flexible, less committed on specific brands or models."
"We had to take early delivery of the appliances (way ahead of schedule), because otherwise they'd be given to another project," said a respondent. "As a result, we had to find storage for the appliances."
Stackable washer/dryer combos were In short supply, according to one respondent.
THE GREAT REFRIGERATOR VANISHING ACT OF 2022
Refrigerators were the main culprit, according to early survey respondents. One respondent was very specific: "French door refrigerators."
But most would have been happy with any ol' fridge. "We're finding whatever spec is available," said a respondent. "Need to order well in advance and be flexible," advised another.
But the list of shortages was not limited to kitchen appliances. Tile products were a problem for one respondent: "We are having to respecify to domestic manufacturers."
Cabinets were also cited by several repondents. "Unfortunately, playing the waiting game," said a cabinetless respondent.
Another pleaded, "Trying to get locally sourced cabinets, made in the USA." Yet another said, "Diversifying [cabinet] suppliers."
WIDE RANGE OF K+B PRODUCTS STILL MISSING
Other amenities lost in the black hole of the supply chain:
- Vented fans with LED lights
- Porcelain tile
- Faucets
- Stone
- Electrical fixtures
- Plumbing fixtures
- Shower surrounds
- Fiberglass shower units
- Quartz countertops
- Solid surface materials for compartments
- Lighting
- Flooring
The last word on "solving" the K+B amenity shortage problem: "Order way in advance," advised one respondent.
LAST CHANCE TO ENTER FOR $50 GIFT CARD
The survey will close Friday, Oct 7, 2022 at 11:59pm CT, so take the survey now to be eligible for one of 10 $50 gift cards.
(Note: If you've already completed the survey there is no need to repeat it: You are entered in the drawing.)
To take the survey – with a chance to win one of 10 $50 debit cards – go to MFDC K+B Survey. To be qualified to participate, your company must be actively involved in multifamily design, development, or construction, and you must give your name, company name, and email at the end of the survey.
Related Stories
| Aug 11, 2010
REDD and Corcoran Group Real Estate developing eco-friendly boutique condos in Brooklyn's Vinegar Hill
REDD and Corcoran Group Real Estate are developing 100 Gold, a 10-unit boutique condominium complex in Brooklyn's Vinegar Hill that consists of (6) one bedrooms, (2) duplex studios—one with a private yard, and (2) penthouses—duplex apartments with one bedroom and loft, and private terraces.
| Aug 11, 2010
AECOM, Arup, Gensler most active in commercial building design, according to BD+C's Giants 300 report
A ranking of the Top 100 Commercial Design Firms based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants
| Aug 11, 2010
Turner Building Cost Index dips nearly 4% in second quarter 2009
Turner Construction Company announced that the second quarter 2009 Turner Building Cost Index, which measures nonresidential building construction costs in the U.S., has decreased 3.35% from the first quarter 2009 and is 8.92% lower than its peak in the second quarter of 2008. The Turner Building Cost Index number for second quarter 2009 is 837.
| Aug 11, 2010
AGC unveils comprehensive plan to revive the construction industry
The Associated General Contractors of America unveiled a new plan today designed to revive the nation’s construction industry. The plan, “Build Now for the Future: A Blueprint for Economic Growth,” is designed to reverse predictions that construction activity will continue to shrink through 2010, crippling broader economic growth.
| Aug 11, 2010
PCL Construction, HITT Contracting among nation's largest commercial building contractors, according to BD+C's Giants 300 report
A ranking of the Top 50 Commercial Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants
| Aug 11, 2010
Webcor, Hunt Construction lead the way in mixed-use construction, according to BD+C's Giants 300 report
A ranking of the Top 30 Mixed-Use Contractors based on Building Design+Construction's 2009 Giants 300 survey. For more Giants 300 rankings, visit http://www.BDCnetwork.com/Giants
| Aug 11, 2010
Report: Fraud levels fall for construction industry, but companies still losing $6.4 million on average
The global construction, engineering and infrastructure industry saw a significant decline in fraud activity with companies losing an average of $6.4 million over the last three years, according to the latest edition of the Kroll Annual Global Fraud Report, released today at the Association of Corporate Counsel’s 2009 Annual Meeting in Boston. This new figure represents less than half of last year’s amount of $14.2 million.
| Aug 11, 2010
First CityCenter projects earn LEED Gold
CityCenter announced today that it has received three Leadership in Energy and Environmental Design LEED Gold certifications from the U.S. Green Building Council for: 1) ARIA Resort's hotel tower; 2) ARIA Resort's convention center and theater; 3) Vdara Hotel. ARIA and Vdara will open in December on the Las Vegas Strip and are the first of CityCenter's developments to be LEED certified.
| Aug 11, 2010
Oldcastle Precast Building Systems wins PCI 2009 Sustainable Design Award
Oldcastle Precast Building Systems was part of the award winning team behind the affordable housing development Melrose Commons Site 5 situated in the South Bronx. PCI (Precast Concrete Institute) recently selected Melrose 5 for the “2009 PCI Design Award for Best Sustainable Project”.