flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Take the Multifamily Kitchen + Bath survey – Maybe win one of 10 $50 gift cards

Multifamily Housing

Take the Multifamily Kitchen + Bath survey – Maybe win one of 10 $50 gift cards

Last chance to win a $50 give card – Take the Kitchen+Bath Survey now!


By ROBERT CASSIDY, EDITOR, MULTIFAMILY DESIGN+CONSTRUCTION | September 13, 2022
Caesarstone quartz countertops in Modern, Traditional, and Farmhouse kitchen settings.
Caesarstone quartz countertops in Modern, Traditional, and Farmhouse kitchen settings. Photo: Caesarstone

Early results from MULTIFAMILY Design+Construction's inaugural Kitchen + Bath survey of multifamily developers, architects, contractors, and other specifiers make it clear that supply chain problems are impacting apartment, condo, and townhome projects.


To take the survey – with a chance to win one of 10 $50 debit cards – go to MFDC K+B Survey. To be qualified to participate, your company must be actively involved in multifamily design, development, or construction, and you must give your name, company name, and email at the end of the survey.


HOW COVID, UKRAINE WAR ARE IMPACTING SPECIFIERS

We asked: "What K+B amenities have you had DIFFICULTY SOURCING due to the Covid pandemic or Ukraine war? What are you doing about this?"

Appliances came up more often than any other product category. "We've been purchasing them early and storing in our own warehouses or changing our spec to purchase models that are in stock/available," said one respondent.

"It's been difficult getting appliance packages with the same manufacturer," said another respondent. "We're needing to mix manufacturers and appliances."

Yet another said, of appliances, "We're ordering early and being more flexible, less committed on specific brands or models."

"We had to take early delivery of the appliances (way ahead of schedule), because otherwise they'd be given to another project," said a respondent. "As a result, we had to find storage for the appliances."

Stackable washer/dryer combos were In short supply, according to one respondent. 

THE GREAT REFRIGERATOR VANISHING ACT OF 2022

Refrigerators were the main culprit, according to early survey respondents. One respondent was very specific: "French door refrigerators."

But most would have been happy with any ol' fridge. "We're finding whatever spec is available," said a respondent. "Need to order well in advance and be flexible," advised another.

But the list of shortages was not limited to kitchen appliances. Tile products were a problem for one respondent: "We are having to respecify to domestic manufacturers."

Cabinets were also cited by several repondents. "Unfortunately, playing the waiting game," said a cabinetless respondent.

Another pleaded, "Trying to get locally sourced cabinets, made in the USA." Yet another said, "Diversifying [cabinet] suppliers."

WIDE RANGE OF K+B PRODUCTS STILL MISSING

Other amenities lost in the black hole of the supply chain:

  • Vented fans with LED lights
  • Porcelain tile
  • Faucets
  • Stone
  • Electrical fixtures
  • Plumbing fixtures
  • Shower surrounds
  • Fiberglass shower units
  • Quartz countertops
  • Solid surface materials for compartments
  • Lighting
  • Flooring

The last word on "solving" the K+B amenity shortage problem: "Order way in advance," advised one respondent.

LAST CHANCE TO ENTER FOR $50 GIFT CARD

The survey will close Friday, Oct 7, 2022 at 11:59pm CT, so take the survey now to be eligible for one of 10 $50 gift cards.

(Note: If you've already completed the survey there is no need to repeat it: You are entered in the drawing.)


To take the survey – with a chance to win one of 10 $50 debit cards – go to MFDC K+B Survey. To be qualified to participate, your company must be actively involved in multifamily design, development, or construction, and you must give your name, company name, and email at the end of the survey.


Related Stories

| Sep 15, 2014

Gen-Y-focused multifamily development under way in L.A.

The new urban residential community at 1001 S. Olive Street will offer open floor plans consisting of 64 studios, 109 one bedroom units, and 28 two-bedroom units, ranging in size from approximately 500 sq ft to 1,100 sq ft. 

| Sep 9, 2014

Using Facebook to transform workplace design

As part of our ongoing studies of how building design influences human behavior in today’s social media-driven world, HOK’s workplace strategists had an idea: Leverage the power of social media to collect data about how people feel about their workplaces and the type of spaces they need to succeed.

| Sep 7, 2014

Behind the scenes of integrated project delivery — successful tools and applications

The underlying variables and tools used to manage collaboration between teams is ultimately the driving for success with IPD, writes CBRE Healthcare's Megan Donham.

| Sep 5, 2014

First Look: Zaha Hadid's Grace on Coronation towers in Australia

Zaha Hadid's latest project in Australia is a complex of three, tapered residential high-rises that have expansive grounds to provide the surrounding community unobstructed views and access to the town's waterfront.

| Sep 3, 2014

Ranked: Top local government sector AEC firms [2014 Giants 300 Report]

STV, HOK, and Turner top BD+C's rankings of the nation's largest local government design and construction firms, as reported in the 2014 Giants 300 Report.

| Sep 3, 2014

New designation launched to streamline LEED review process

The LEED Proven Provider designation is designed to minimize the need for additional work during the project review process.

| Sep 2, 2014

Ranked: Top green building sector AEC firms [2014 Giants 300 Report]

AECOM, Gensler, and Turner top BD+C's rankings of the nation's largest green design and construction firms. 

| Sep 2, 2014

Extreme conversion: 17-story industrial silo to be converted to high-rise housing

As part of Copenhagen's effort to turn an industrial seaport into a bustling neighborhood, Danish architecture firm COBE was invited to convert a grain silo into a residential tower.

| Sep 2, 2014

Melbourne's tallest residential tower will have 'optically transformative façade'

Plans for Melbourne's tallest residential tower have been released by Elenberg Fraser Architects. Using an optically transformative façade and botanical aesthetic, the project seeks to change the landscape of Australia's Victoria state. 

| Sep 1, 2014

Ranked: Top federal government sector AEC firms [2014 Giants 300 Report]

Clark Group, Fluor, and HOK top BD+C's rankings of the nation's largest federal government design and construction firms, as reported in the 2014 Giants 300 Report. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021