flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

90,000-sf industrial facility will add needed manufacturing space in West Michigan

Industrial Facilities

90,000-sf industrial facility will add needed manufacturing space in West Michigan

Vision Real Estate Investment recently broke ground on the building.


By David Malone, Associate Editor | April 2, 2018

Courtesy Vision Real Estate Investment

West Michigan will soon have an extra 90,020 sf of industrial and manufacturing space when Crossroads Business Center is completed in October 2018. Located at 103 76th Street just east of US-131 on 76th Street, the new facility will add needed space and spark economic growth in the area.

The multi-tenant industrial building includes office space, separated office and truck parking areas, an ESFR fire suppression system, 24-foot clear ceiling height, natural daylight in warehouse areas, and a minimum of one overhead door and one dock in each space. Lease space between 10,000 and 50,000 sf is available.

“The property’s proximity to major highways and its state-of-the-art infrastructure makes this building an ideal location for modern manufacturers as well as any transportation intensive service company that values efficient logistics,” says Curt Mulder, Co-President of Wolverine Building Group, the project’s General Contractor.

Related Stories

Industrial Facilities | Aug 3, 2023

The state of battery manufacturing in the era of EV

One of the most significant changes seen in today’s battery plant is the full manufacturing process—from raw materials to the fully operational battery.

Market Data | Aug 1, 2023

Nonresidential construction spending increases slightly in June

National nonresidential construction spending increased 0.1% in June, according to an Associated Builders and Contractors analysis of data published today by the U.S. Census Bureau. Spending is up 18% over the past 12 months. On a seasonally adjusted annualized basis, nonresidential spending totaled $1.07 trillion in June.

Digital Twin | Jul 31, 2023

Creating the foundation for a Digital Twin

Aligning the BIM model with the owner’s asset management system is the crucial first step in creating a Digital Twin. By following these guidelines, organizations can harness the power of Digital Twins to optimize facility management, maintenance planning, and decision-making throughout the building’s lifecycle.

Market Data | Jul 24, 2023

Leading economists call for 2% increase in building construction spending in 2024

Following a 19.7% surge in spending for commercial, institutional, and industrial buildings in 2023, leading construction industry economists expect spending growth to come back to earth in 2024, according to the July 2023 AIA Consensus Construction Forecast Panel. 

Standards | Jun 26, 2023

New Wi-Fi standard boosts indoor navigation, tracking accuracy in buildings

The recently released Wi-Fi standard, IEEE 802.11az enables more refined and accurate indoor location capabilities. As technology manufacturers incorporate the new standard in various devices, it will enable buildings, including malls, arenas, and stadiums, to provide new wayfinding and tracking features.

Industrial Facilities | Jun 20, 2023

A new study presses for measuring embodied carbon in industrial buildings

The embodied carbon (EC) intensity in core and shell industrial buildings in the U.S. averages 23.0 kilograms per sf, according to a recent analysis of 26 whole building life-cycle assessments. That means a 300,000-sf warehouse would emit 6,890 megatons of carbon over its lifespan, or the equivalent of the carbon emitted by 1,530 gas-powered cars driven for one year. Those sobering estimates come from a new benchmark study, “Embodied Carbon U.S. Industrial Real Estate.”

Industrial Facilities | May 31, 2023

Nascent cowarehousing firm steps forward with facilities that offer a communal user experience

The design firm Ware Malcomb has partnered with FlexHQ, a Los Angeles-based firm offering cowarehouse leasing solutions, to create a scalable workspace that emphasizes leasing flexibility and higher-quality and environmentally friendlier amenities than aren’t commonly found in this building type, say representatives from both companies.

Multifamily Housing | May 12, 2023

An industrial ‘eyesore’ is getting new life as an apartment complex

The project, in Metuchen, N.J., includes significant improvements to a nearby wildlife preserve.

Industrial Facilities | Apr 10, 2023

Implementing human-centric design in operations and maintenance facilities

Stantec's Ryan Odell suggests using the human experience to advance OMSF design that puts a focus on wellness and efficiency.

Warehouses | Mar 29, 2023

Construction completed on Canada’s first multi-story distribution center

Construction was recently completed on Canada’s first major multi-story industrial project, a distribution center in Burnaby, British Columbia. The project provides infrastructure for last-mile delivery in a world where consumers have come to expect next-day and same-day delivery, according to Ware Malcomb, the project's architect of record.

boombox1
boombox2
native1

More In Category


Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.


Industrial Facilities

8 ways to cool a factory

Whichever way you look at it—from a workplace wellness point of view or from a competing for talent angle—there are good reasons to explore options for climate control in the factory workplace.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021