Wood truss construction surged in popularity in the 1960s and â70s, but back then most buildings that used metal-plate-connected wood trusses had flat ceilings. With todayâs CAD and BIM technology, however, manufacturers can create trusses for much more intricate and complicated architectural designs.
Archie Landreman, a technical director with WoodWorks, an initiative of the Wood Products Council, offers eight tips for working with metal-plate-connected wood trusses.
Â
1. Sweat the details.
Creating a complete set of construction documents is the first no-brainer step for any wood truss project. âThe more information the team has, the better job theyâre going to do,â Landreman says. âYou need a complete set of blueprintsâarchitectural, structural, mechanical.â
Detailed sections, including design loads, spacing, building codes, and special shapes, are crucial for a manufacturer to properly design trusses for your project. Providing these details up front will save time and money, and the approval process will go more smoothly.
Landremanâs advice: Make sure the truss heel height isnât overlooked during the blueprint stage. âA lot of times, plans are drawn in such a way that that particular section of the building is genericâit doesnât necessarily show details to scale,â he says. To accurately calculate heel height, the manufacturer needs detailed informationâincluding a drawing of a typical wall sectionâon wall height, height at the bottom of the header, length of the overhang, and dimensions for the soffit and fascia materials.
Â
2. Specifications are as important as blueprints.
To design trusses properly, you must supply the manufacturer with a specification book. Such documentation may include specific carpentry information on trusses that does not appear on the project blueprints. Without a spec book, the truss manufacturer could do a complete set of truss layouts and profiles for approval, Landreman says, only to have the architect or structural engineer come back with a whole new set of drawings and specifications. âIt could add a lot of time and expense for the manufacturer to have to redo something that was done without complete information,â Landreman says.
Landremanâs advice: Provide the truss manufacturer with the spec book at the time of the bid. âIn some cases, it can provide a lot more detail than the blueprint itself.â
Â
3. Get close to your manufacturer.
Before beginning a truss project, do your research on several truss manufacturers. Donât be afraid to ask tough questions; for example, âHave you done big commercial jobs with spans in excess of 60 feet before?â
Ask truss manufacturers for their annual business volume, which can be an indicator of experience. âIf someoneâs manufacturing $10 million worth of trusses a year, you would think that they should have more experience and probably be able to do a better job than a manufacturer thatâs doing $500,000 a year,â he says. Business volume may not always be a perfect indicator, but itâs a factor you should take into consideration.
Landremanâs advice: Ask manufacturers for references on projects similar to yours to get a sense of their experience in that area. âNot everybody has done the kind of job youâre working on,â he says.
Â
4. Keep in touch with your manufacturer as the job progresses.
Developing a solid relationship with your truss manufacturer is important, since a good manufacturer can assist your Building Team during the early stages of the design process. If, for example, youâre designing a building with a 26-foot span for a floor truss, get the specifications details to the manufacturer, request a preliminary drawing, and work with the manufacturerâs drawing to develop a better sense of what the truss would look like and whether the manufacturerâs concept can become a reality.
Landremanâs advice: Work with the truss manufacturer to get details on span and truss height before starting any drawings to make sure the basic design concept will work before it is put on paper.
Â
5. Make your manufacturer part of your Building Team.
When your manufacturer completes shop drawings for the placement diagrams of the trusses, getting input from all parties involved in the project should provide added perspective before final approval of these documents.
Landremanâs advice: Share manufacturer drawings with all the members of your Building Team, so that âyouâre getting viewpoints from different angles.â
Â
6. Schedule the wood truss work carefully.
The approval process can take time. To keep on schedule, leave ample time for placing the order, completing the layout and profile designs, and approving the drawings. According to Landreman, this process usually takes about two weeks, but it can vary depending on the manufacturer, the time of year, and the size and complexity of the project.
Landremanâs advice: Ask the manufacturer how long to expect the drawings to take once the purchase order or contract is placed.Â
Â
7. Follow the manufacturerâs directions carefully.
The truss manufacturer should provide detailed guidelines on truss storage and installation during the approval process and upon delivery to the job site. The guidelines should include instructions on storage, lifting installation, bracing, cutting, and notching. Follow the manufacturerâs guidelines to the letter, since problems can occur if trusses are mishandled.
The chief problem is damage during delivery to the job site, as trusses are being rolled off the truck and dropped to the ground. âIf they put them on a really rough part of the job site, some of the trusses could be broken or there could be damage to the connector plates when they hit the ground,â Landreman says.
Some trusses cannot be repaired once theyâre put in place, so damage that goes unnoticed until after the trusses and roof sheeting are installed could result in extra time and expense to remove the sheeting and put in a new truss.
To avoid any confusion during installation, the manufacturerâs instructions should include the latest set of truss drawings showing the proper placement of all of the trusses. âMany times through the approval process some of the details in the drawings may change,â Landreman says. âIf the contractor in the field doesnât have the last revised set of truss drawings, some of those numbers and placements might have changed, and the truss could wind up in the wrong location.â
Landremanâs advice: If any instructions, warnings, or recommendations are missing, call the manufacturer immediately. âThey are more than willing to get that information to you or send someone out to the site to help make sure everythingâs going the way itâs supposed to.â
Â
8. Treat floor trusses with special care.
Floor trusses can be trickier than roof trusses. âWith roof trusses, thereâs a tremendous amount of design flexibility, and usually youâre dealing with slope trusses,â Landreman says. With floor trusses, however, âthe height of the floor truss can affect the design of the whole building, especially when youâre looking to accommodate mechanicals in those floor trusses,â he says.
For example, say youâre designing a three-story building using 24-foot floor trusses, and you expect the truss to be 12 inches deep. During the bidding process, however, the manufacturer determines that each truss needs to be 16 inches deep. âThat would add a whole foot to the building height, and itâs probably not going to work,â says Landreman.
Landremanâs advice: Consult your manufacturer on truss depth and spacing when considering floor trusses for any large-scale project, rather than relying on a preprinted span table.
Related Stories
| Nov 16, 2010
CityCenterâs new Harmon Hotel targeted for demolition
MGM Resorts officials want to demolish the unopened 27-story Harmon Hotelâone of the main components of its brand new $8.5 billion CityCenter development in Las Vegas. In 2008, inspectors found structural work on the Harmon didnât match building plans submitted to the county, with construction issues focused on improperly placed steel reinforcing bar. In January 2009, MGM scrapped the buildingâs 200 condo units on the upper floors and stopped the tower at 27 stories, focusing on the Harmon having just 400 hotel rooms. With the Lord Norman Foster-designed building mired in litigation, construction has since been halted on the interior, and the blue-glass tower is essentially a 27-story empty shell.
| Nov 16, 2010
Where can your firm beat the recession? Try any of these 10 places
Wondering where condos and rental apartments will be needed? Where companies are looking to rent office space? Where people will need hotel rooms, retail stores, and restaurants? Newsweek compiled a list of the 10 American cities best situated for economic recovery. The cities fall into three basic groups: Texas, the New Silicon Valleys, and the Heartland Honeys. Welcome to the recovery.
| Nov 16, 2010
Landscape architecture challenges AndrĂ©s Duanyâs Congress for New Urbanism
AndrĂ©s Duany, founder of the Congress for the New Urbanism, adopted the ideas, vision, and values of the early 20th Century landscape architects/planners John Nolen and Frederick Law Olmsted, Jr., to launch a movement that led to more than 300 new towns, regional plans, and community revitalization project commissions for his firm. However, now that thereâs a societal buyerâs remorse about New Urbanism, Duany is coming up against a movement that sees landscape architectureânot architectureâas the design medium more capable of organizing the city and enhancing the urban experience.
| Nov 16, 2010
Just for fun: Words that architects use
If you regularly use such words as juxtaposition, folly, truncated, and articulation, you may be an architect. Architects tend to use words rarely uttered during normal conversations. In fact, 62% of all the words that come out of an architects mouth could be replaced by a simpler and more widely known word, according to this âreport.â Review this list of designer words, and once you manage to work them into daily conversation, youâre on your way to becoming a bonafide architect.
| Nov 16, 2010
NFRC approves technical procedures for attachment product ratings
The NFRC Board of Directors has approved technical procedures for the development of U-factor, solar heat gain coefficient (SHGC), and visible transmittance (VT) ratings for co-planar interior and exterior attachment products. The new procedures, approved by unanimous voice vote last week at NFRCâs Fall Membership Meeting in San Francisco, will add co-planar attachments such as blinds and shades to the groupâs existing portfolio of windows, doors, skylights, curtain walls, and window film.
| Nov 15, 2010
Gilbane to acquire W.G. Mills, Inc.
Rhode Island-based Gilbane Building Company announced plans to acquire W.G. Mills, Inc., a construction management firm with operations based in Florida. The acquisition will dramatically strengthen Gilbaneâs position in Floridaâs growing market and complement its already established presence in the southeast.
| Nov 11, 2010
Saint-Gobain to make $80 million investment in SAGE Electrochromics
Saint-Gobain, one of the worldâs largest glass and construction material manufacturers, is making a strategic equity investment in SAGE Electrochromics to make electronically tintable âdynamic glassâ an affordable, mass-market product, ushering in a new era of energy-saving buildings.
| Nov 11, 2010
Saint-Gobain to make $80 million investment in SAGE Electrochromics
Saint-Gobain, one of the worldâs largest glass and construction material manufacturers, is making a strategic equity investment in SAGE Electrochromics to make electronically tintable âdynamic glassâ an affordable, mass-market product, ushering in a new era of energy-saving buildings.