Wood truss construction surged in popularity in the 1960s and â70s, but back then most buildings that used metal-plate-connected wood trusses had flat ceilings. With todayâs CAD and BIM technology, however, manufacturers can create trusses for much more intricate and complicated architectural designs.
Archie Landreman, a technical director with WoodWorks, an initiative of the Wood Products Council, offers eight tips for working with metal-plate-connected wood trusses.
Â
1. Sweat the details.
Creating a complete set of construction documents is the first no-brainer step for any wood truss project. âThe more information the team has, the better job theyâre going to do,â Landreman says. âYou need a complete set of blueprintsâarchitectural, structural, mechanical.â
Detailed sections, including design loads, spacing, building codes, and special shapes, are crucial for a manufacturer to properly design trusses for your project. Providing these details up front will save time and money, and the approval process will go more smoothly.
Landremanâs advice: Make sure the truss heel height isnât overlooked during the blueprint stage. âA lot of times, plans are drawn in such a way that that particular section of the building is genericâit doesnât necessarily show details to scale,â he says. To accurately calculate heel height, the manufacturer needs detailed informationâincluding a drawing of a typical wall sectionâon wall height, height at the bottom of the header, length of the overhang, and dimensions for the soffit and fascia materials.
Â
2. Specifications are as important as blueprints.
To design trusses properly, you must supply the manufacturer with a specification book. Such documentation may include specific carpentry information on trusses that does not appear on the project blueprints. Without a spec book, the truss manufacturer could do a complete set of truss layouts and profiles for approval, Landreman says, only to have the architect or structural engineer come back with a whole new set of drawings and specifications. âIt could add a lot of time and expense for the manufacturer to have to redo something that was done without complete information,â Landreman says.
Landremanâs advice: Provide the truss manufacturer with the spec book at the time of the bid. âIn some cases, it can provide a lot more detail than the blueprint itself.â
Â
3. Get close to your manufacturer.
Before beginning a truss project, do your research on several truss manufacturers. Donât be afraid to ask tough questions; for example, âHave you done big commercial jobs with spans in excess of 60 feet before?â
Ask truss manufacturers for their annual business volume, which can be an indicator of experience. âIf someoneâs manufacturing $10 million worth of trusses a year, you would think that they should have more experience and probably be able to do a better job than a manufacturer thatâs doing $500,000 a year,â he says. Business volume may not always be a perfect indicator, but itâs a factor you should take into consideration.
Landremanâs advice: Ask manufacturers for references on projects similar to yours to get a sense of their experience in that area. âNot everybody has done the kind of job youâre working on,â he says.
Â
4. Keep in touch with your manufacturer as the job progresses.
Developing a solid relationship with your truss manufacturer is important, since a good manufacturer can assist your Building Team during the early stages of the design process. If, for example, youâre designing a building with a 26-foot span for a floor truss, get the specifications details to the manufacturer, request a preliminary drawing, and work with the manufacturerâs drawing to develop a better sense of what the truss would look like and whether the manufacturerâs concept can become a reality.
Landremanâs advice: Work with the truss manufacturer to get details on span and truss height before starting any drawings to make sure the basic design concept will work before it is put on paper.
Â
5. Make your manufacturer part of your Building Team.
When your manufacturer completes shop drawings for the placement diagrams of the trusses, getting input from all parties involved in the project should provide added perspective before final approval of these documents.
Landremanâs advice: Share manufacturer drawings with all the members of your Building Team, so that âyouâre getting viewpoints from different angles.â
Â
6. Schedule the wood truss work carefully.
The approval process can take time. To keep on schedule, leave ample time for placing the order, completing the layout and profile designs, and approving the drawings. According to Landreman, this process usually takes about two weeks, but it can vary depending on the manufacturer, the time of year, and the size and complexity of the project.
Landremanâs advice: Ask the manufacturer how long to expect the drawings to take once the purchase order or contract is placed.Â
Â
7. Follow the manufacturerâs directions carefully.
The truss manufacturer should provide detailed guidelines on truss storage and installation during the approval process and upon delivery to the job site. The guidelines should include instructions on storage, lifting installation, bracing, cutting, and notching. Follow the manufacturerâs guidelines to the letter, since problems can occur if trusses are mishandled.
The chief problem is damage during delivery to the job site, as trusses are being rolled off the truck and dropped to the ground. âIf they put them on a really rough part of the job site, some of the trusses could be broken or there could be damage to the connector plates when they hit the ground,â Landreman says.
Some trusses cannot be repaired once theyâre put in place, so damage that goes unnoticed until after the trusses and roof sheeting are installed could result in extra time and expense to remove the sheeting and put in a new truss.
To avoid any confusion during installation, the manufacturerâs instructions should include the latest set of truss drawings showing the proper placement of all of the trusses. âMany times through the approval process some of the details in the drawings may change,â Landreman says. âIf the contractor in the field doesnât have the last revised set of truss drawings, some of those numbers and placements might have changed, and the truss could wind up in the wrong location.â
Landremanâs advice: If any instructions, warnings, or recommendations are missing, call the manufacturer immediately. âThey are more than willing to get that information to you or send someone out to the site to help make sure everythingâs going the way itâs supposed to.â
Â
8. Treat floor trusses with special care.
Floor trusses can be trickier than roof trusses. âWith roof trusses, thereâs a tremendous amount of design flexibility, and usually youâre dealing with slope trusses,â Landreman says. With floor trusses, however, âthe height of the floor truss can affect the design of the whole building, especially when youâre looking to accommodate mechanicals in those floor trusses,â he says.
For example, say youâre designing a three-story building using 24-foot floor trusses, and you expect the truss to be 12 inches deep. During the bidding process, however, the manufacturer determines that each truss needs to be 16 inches deep. âThat would add a whole foot to the building height, and itâs probably not going to work,â says Landreman.
Landremanâs advice: Consult your manufacturer on truss depth and spacing when considering floor trusses for any large-scale project, rather than relying on a preprinted span table.
Related Stories
Healthcare Facilities | Aug 10, 2023
The present and future of crisis mental health design
BWBR principal Melanie Baumhover sat down with the firmâs behavioral and mental health designers to talk about how intentional design can play a role in combatting the crisis.
Architects | Aug 10, 2023
Hoffmann Architects + Engineers awards first Diversity Advancement Scholarship to Reeja Shrestha of Howard University
Now in its inaugural year, the Hoffmann Scholarship was established in collaboration with the Connecticut Architecture Foundation (CAF) to support students from underrepresented racial or ethnic groups who are seeking degrees in architecture or engineering.Â
Senior Living Design | Aug 7, 2023
Putting 9 senior living market trends into perspective
Brad Perkins, FAIA, a veteran of more than four decades in the planning and design of senior living communities, looks at where the market is heading in the immediate future.Â
Higher Education | Aug 7, 2023
Building a better academic workplace
Gensler's David Craig and Melany Park show how agile, efficient workplaces bring university faculty and staff closer together while supporting individual needs.
University Buildings | Aug 7, 2023
Eight-story Vancouver Community College building dedicated to clean energy, electric vehicle education
The Centre for Clean Energy and Automotive Innovation, to be designed by Stantec, will house classrooms, labs, a library and learning center, an Indigenous gathering space, administrative offices, and multiple collaborative learning spaces.
Green | Aug 7, 2023
Rooftop photovoltaic panels credited with propelling solar energy output to record high
Solar provided a record-high 7.3% of U.S. electrical generation in May, âdriven in large part by growth in âestimatedâ small-scale (e.g., rooftop) solar PV whose output increased by 25.6% and accounted for nearly a third (31.9%) of total solar production,â according to a report by the U.S. Energy Information Administration.Â
Resiliency | Aug 7, 2023
Creative ways cities are seeking to beat urban heat gain
As temperatures in many areas hit record highs this summer, cities around the world are turning to creative solutions to cope with the heat. Here are several creative ways cities are seeking to beat urban heat gain.
Government Buildings | Aug 7, 2023
Nearly $1 billion earmarked for energy efficiency upgrades to federal buildings
The U.S. General Services Administration (GSA) recently announced plans to use $975 million in Inflation Reduction Act funding for energy efficiency and clean energy upgrades to federal buildings across the country. The investment will impact about 40 million sf, or about 20% of GSAâs federal buildings portfolio.
MFPRO+ New Projects | Aug 4, 2023
Nashville gets 'first-of-its-kind' residential tower
Global architecture firm Goettsch Partners announces the completion of Alcove, a new 356-unit residential tower in Nashville, Tenn., developed by Giarratana LLC.Â
Industrial Facilities | Aug 3, 2023
The state of battery manufacturing in the era of EV
One of the most significant changes seen in todayâs battery plant is the full manufacturing processâfrom raw materials to the fully operational battery.