flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

8 cool cultural projects in the works

8 cool cultural projects in the works

Learn which AEC firms are behind some of the most notable performing arts, library, and museum projects.


By BD+C Staff | March 22, 2013
This article first appeared in the BD+C March 2013 issue of BD+C.

In each issue of Building Design+Construction, we feature the latest new construction and renovation projects in a section called, On the Drawing Board. Here, we have assembled eight of the most notable cultural facility projects currently in the works. They include a soaring opera center in Hong Kong, a multi-tower music center in Calgary, and a massive expansion to the Country Music Hall of Fame and Museum in Nashville. Check them out below.

 

 

 

1. NATIONAL MUSIC CENTRE UNITES ELEMENTS OF CANADIAN MUSIC

Allied Works Architecture is designing the National Music Centre, a project on the site of the historic King Edward Hotel and music venue in Calgary. The 160,000-sf museum, performance space, and teaching facility will combine new construction plus adaptive reuse of the “King Eddy,” ultimately comprising nine towers connected by pathways that bridge a major street. The old hotel will be completely refurbished, and will house a radio station, recording studios, classrooms, and performance and exhibition spaces. A new five-story building across the street will include museum and performance space. Also on the Building Team: Kasian (associate architect), Haley Sharpe Design (exhibition design), Fisher Dachs Associates (theater design), and CANA (CM).

 

2. DESIGN PARTNERSHIP TO CONDUCT PLANS FOR HONG KONG OPERA CENTER

Bing Thom Architects and Ronald Lu & Partners Company Ltd. have been chosen to design the Xiqu Centre, in Hong Kong. The opera center, scheduled to open in 2016, will be the first of 17 core arts and cultural venues to open in the West Kowloon Cultural District. The facility will include two auditoriums, with 1,100 and 400 seats, and a 280-seat teahouse, as well as training and educational facilities for the creation and development of Chinese and Cantonese opera works.

 

3. FORT LAUDERDALE PERFORMING ARTS CENTER TO GET UPGRADE

A joint venture between Stiles and Miller Construction Co. is renovating and expanding the 20-year-old Broward Center for the Performing Arts in downtown Fort Lauderdale, Fla. The 18-month upgrade is phased and planned to keep the center’s schedule of performances running smoothly while new amenities, a two-story waterfront pavilion, and terraced dining areas are added. A three-story arts education wing that will face Avenue of the Arts is also in the works. Wilson Butler Architects designed the project, with Jacobs Engineering Group as project manager.

 

4. NEW HOTEL, MUSEUM EXPANSION UNDER WAY IN MUSIC CITY

Brasfield & Gorrie is building the Omni Nashville Hotel and an addition to the Country Music Hall of Fame and Museum in downtown Nashville. The project, totaling 1.4 million sf, includes an 800-room hotel and 225,000-sf expansion to the Hall of Fame. The facility will encompass a ballroom, music venues, and restaurants. LEED Silver is targeted. Also on the Building Team: HKS  (architect) and Earl Swennson Associates (associate architect).

 

5. NORTHWESTERN'S MUSIC SCHOOL AWAITS NEW HOME ON EVANSTON CAMPUS

The new home of Northwestern University’s Bienen School of Music will be located just south of the school’s Pick-Staiger Concert Hall on the southeastern edge of the Evanston campus. The 152,000-sf building will feature a 400-seat recital hall and a 150-seat opera rehearsal room-cum-black box theater. The project is slated to achieve at least LEED Silver certification. Building Team: Goettsch Partners (architect), Thornton Tomasetti (structural engineer), Cosentini Associates (MEP engineer), and Power Construction (general contractor). Planned completion: 2015.

 

6. ARTISTS AND VISITORS GO WITH THE FLOW AT NEW CONTEMPORARY ART INSTITUTE

The new Institute for Contemporary Art (ICA) at Virginia Commonwealth University, in Richmond, is designed to facilitate the way artists work today. Designed by Chris McVoy and Steven Holl of Steven Holl Architects, New York, N.Y., the 38,000-sf building will be part exhibition and performance space, part lab and incubator, fit to hold programming from visual art to theater to film. At the heart of the building will be a double-height “forum,” a flexible space that links the three levels of galleries. This floor plan will allow artists to create work that extends across spaces and permit visitors to circulate through the space via a variety of paths. BCWH Architects are the local architects on the project.

7. MARYLAND LIBRARY WILL HOUSE BOOKS WITH A SIDE OF ART

With a 22-month completion plan, The Lukmire Partnership (architect) and Costello Construction (general contractor) have teamed up to complete the 70,000-sf Silver Spring (Md.) Library. The five-story facility will house nonprofit art group Pyramid Atlantic in the basement and on the first two floors, with the library occupying floors three through five. The $35 million library, which is targeting LEED Silver certification, will feature all-glass curtain wall. A combined escalator system with ornamental staircase will be the focal point of the interior.

 

8. MEDGAR EVERS COLLEGE LIBRARY TO GET MAKEOVER

Medgar Evers College, a City University of New York (CUNY), is planning a $11 million renovation and addition to its 45,720-sf library in Brooklyn. The school commissioned ikon.5 Architects (architect) and MBI Group (general contractor) to head up the project, which will transform the 1980s facility into a contemporary information media commons. The 2,000-SF Welcome Center addition will feature a cafe with a full-height electronic media display, terrazzo floor, and bamboo-clad entry. 

Related Stories

| Jan 4, 2011

Furniture Sustainability Standard - Approved by ANSI and Released for Distribution

BIFMA International recently announced formal American National Standards Institute (ANSI) approval and release of the ANSI/BIFMA e3-2010 Furniture Sustainability Standard. The e3 standard represents a structured methodology to evaluate the "sustainable" attributes of furniture products and constitutes the technical criteria of the level product certification program.

| Jan 3, 2011

Chicago Architectural Foundation’s media expert takes all 85 tours in one year

Jennifer Lucente, the social media expert at the Chicago Architecture Foundation has completed her year of taking tours—taking all 85 tours in 2010. The challenge that began last January with a tour of the Board of Trade building has ended today with the architecture foundation’s newest tour:  Razzle Dazzle – featuring the Loop theater district followed by a celebration at the Chicago Theatre.

| Dec 28, 2010

Project of the Week: Community college for next-gen Homeland Security personnel

The College of DuPage, Glen Ellyn, Ill., began work on the Homeland Security Education Center, which will prepare future emergency personnel to tackle terrorist attacks and disasters. The $25 million, 61,100-sf building’s centerpiece will be an immersive interior street lab for urban response simulations.

| Dec 20, 2010

Architect Adrian D. Smith on zero-energy cities, new technologies, and high density.

Adrian D. Smith, FAIA, RIBA, is co-founder (with Gordon Gill) of Adrian Smith + Gordon Gill Architecture, Chicago. Previously, he was a design partner in the Chicago office of Skidmore, Owings & Merrill (1980-2003) and a consulting design partner from 2004 to 2006. His landmark structures include the Jin Mao Tower (Shanghai), Rowes Wharf (Boston), and Burj Khalifa (Dubai, U.A.E.), the world’s tallest structure. He recently collaborated with Gordon Gill to design the world’s first net-zero-energy skyscraper, Pearl River Tower, now nearing completion in Guangzhou, China. This account is based on his recent remarks at the Illinois Institute of Technology.

| Dec 17, 2010

BIM Tools Enhance Project Value

The Building Team for a renovation project at Georgia Tech uses BIM and 3D design tools to solve a complex millwork problem.

| Dec 17, 2010

Historic Rhode Island hotel reborn with modern amenities

The iconic Ocean House resort in Watch Hill, R.I., had to be torn down in 2005 when systemic deficiencies made restoration unfeasible. Centerbrook Architects and Planners, Centerbrook, Conn., designed a new version of the hotel, working with preservation societies to save or recreate favorite elements of the original building, and incorporating them into the contemporary structure. The new resort has 49 guest rooms and 23 residences, plus banquet halls, a corporate boardroom, a private clubroom, a spa and fitness center, an indoor lap pool, a bar, and the obligatory international croquet court. Dimeo Construction, Providence, R.I., was the construction manager.

| Dec 17, 2010

Gemstone-inspired design earns India’s first LEED Gold for a hotel

The Park Hotel Hyderabad in Hyderabad, India, was designed by Skidmore, Owings & Merrill to combine inspirations from the region’s jewelry-making traditions with sustainable elements.

| Dec 17, 2010

Condominium and retail building offers luxury and elegance

The 58-story Austonian in Austin, Texas, is the tallest residential building in the western U.S. Benchmark Development, along with Ziegler Cooper Architects and Balfour Beatty (GC), created the 850,000-sf tower with 178 residences, retail space, a 6,000-sf fitness center, and a 10th-floor outdoor area with a 75-foot saltwater lap pool and spa, private cabanas, outdoor kitchens, and pet exercise and grooming areas.

| Dec 17, 2010

Sam Houston State arts programs expand into new performance center

Theater, music, and dance programs at Sam Houston State University have a new venue in the 101,945-sf, $38.5 million James and Nancy Gaertner Performing Arts Center. WHR Architects, Houston, designed the new center to connect two existing buildings at the Huntsville, Texas, campus.

boombox1
boombox2
native1

More In Category

Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021