flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

8 cool cultural projects in the works

8 cool cultural projects in the works

Learn which AEC firms are behind some of the most notable performing arts, library, and museum projects.


By BD+C Staff | March 22, 2013
This article first appeared in the BD+C March 2013 issue of BD+C.

In each issue of Building Design+Construction, we feature the latest new construction and renovation projects in a section called, On the Drawing Board. Here, we have assembled eight of the most notable cultural facility projects currently in the works. They include a soaring opera center in Hong Kong, a multi-tower music center in Calgary, and a massive expansion to the Country Music Hall of Fame and Museum in Nashville. Check them out below.

 

 

 

1. NATIONAL MUSIC CENTRE UNITES ELEMENTS OF CANADIAN MUSIC

Allied Works Architecture is designing the National Music Centre, a project on the site of the historic King Edward Hotel and music venue in Calgary. The 160,000-sf museum, performance space, and teaching facility will combine new construction plus adaptive reuse of the “King Eddy,” ultimately comprising nine towers connected by pathways that bridge a major street. The old hotel will be completely refurbished, and will house a radio station, recording studios, classrooms, and performance and exhibition spaces. A new five-story building across the street will include museum and performance space. Also on the Building Team: Kasian (associate architect), Haley Sharpe Design (exhibition design), Fisher Dachs Associates (theater design), and CANA (CM).

 

2. DESIGN PARTNERSHIP TO CONDUCT PLANS FOR HONG KONG OPERA CENTER

Bing Thom Architects and Ronald Lu & Partners Company Ltd. have been chosen to design the Xiqu Centre, in Hong Kong. The opera center, scheduled to open in 2016, will be the first of 17 core arts and cultural venues to open in the West Kowloon Cultural District. The facility will include two auditoriums, with 1,100 and 400 seats, and a 280-seat teahouse, as well as training and educational facilities for the creation and development of Chinese and Cantonese opera works.

 

3. FORT LAUDERDALE PERFORMING ARTS CENTER TO GET UPGRADE

A joint venture between Stiles and Miller Construction Co. is renovating and expanding the 20-year-old Broward Center for the Performing Arts in downtown Fort Lauderdale, Fla. The 18-month upgrade is phased and planned to keep the center’s schedule of performances running smoothly while new amenities, a two-story waterfront pavilion, and terraced dining areas are added. A three-story arts education wing that will face Avenue of the Arts is also in the works. Wilson Butler Architects designed the project, with Jacobs Engineering Group as project manager.

 

4. NEW HOTEL, MUSEUM EXPANSION UNDER WAY IN MUSIC CITY

Brasfield & Gorrie is building the Omni Nashville Hotel and an addition to the Country Music Hall of Fame and Museum in downtown Nashville. The project, totaling 1.4 million sf, includes an 800-room hotel and 225,000-sf expansion to the Hall of Fame. The facility will encompass a ballroom, music venues, and restaurants. LEED Silver is targeted. Also on the Building Team: HKS  (architect) and Earl Swennson Associates (associate architect).

 

5. NORTHWESTERN'S MUSIC SCHOOL AWAITS NEW HOME ON EVANSTON CAMPUS

The new home of Northwestern University’s Bienen School of Music will be located just south of the school’s Pick-Staiger Concert Hall on the southeastern edge of the Evanston campus. The 152,000-sf building will feature a 400-seat recital hall and a 150-seat opera rehearsal room-cum-black box theater. The project is slated to achieve at least LEED Silver certification. Building Team: Goettsch Partners (architect), Thornton Tomasetti (structural engineer), Cosentini Associates (MEP engineer), and Power Construction (general contractor). Planned completion: 2015.

 

6. ARTISTS AND VISITORS GO WITH THE FLOW AT NEW CONTEMPORARY ART INSTITUTE

The new Institute for Contemporary Art (ICA) at Virginia Commonwealth University, in Richmond, is designed to facilitate the way artists work today. Designed by Chris McVoy and Steven Holl of Steven Holl Architects, New York, N.Y., the 38,000-sf building will be part exhibition and performance space, part lab and incubator, fit to hold programming from visual art to theater to film. At the heart of the building will be a double-height “forum,” a flexible space that links the three levels of galleries. This floor plan will allow artists to create work that extends across spaces and permit visitors to circulate through the space via a variety of paths. BCWH Architects are the local architects on the project.

7. MARYLAND LIBRARY WILL HOUSE BOOKS WITH A SIDE OF ART

With a 22-month completion plan, The Lukmire Partnership (architect) and Costello Construction (general contractor) have teamed up to complete the 70,000-sf Silver Spring (Md.) Library. The five-story facility will house nonprofit art group Pyramid Atlantic in the basement and on the first two floors, with the library occupying floors three through five. The $35 million library, which is targeting LEED Silver certification, will feature all-glass curtain wall. A combined escalator system with ornamental staircase will be the focal point of the interior.

 

8. MEDGAR EVERS COLLEGE LIBRARY TO GET MAKEOVER

Medgar Evers College, a City University of New York (CUNY), is planning a $11 million renovation and addition to its 45,720-sf library in Brooklyn. The school commissioned ikon.5 Architects (architect) and MBI Group (general contractor) to head up the project, which will transform the 1980s facility into a contemporary information media commons. The 2,000-SF Welcome Center addition will feature a cafe with a full-height electronic media display, terrazzo floor, and bamboo-clad entry. 

Related Stories

| Sep 20, 2011

PPG, Pleotint to co-market environmentally adaptive glazing technology with low-e glass

 Laminated between two lites of glass, SRT interlayer may be used monolithically or within an insulating glass unit. 

| Sep 19, 2011

Portland team hired as LEED and commissioning consultants for $5.5B downtown sustainable project in Qatar

The $5.5 billion sustainable downtown regeneration project underway by Msheireb Properties will transform a 76 acres site at the centre of Doha, Qatar’s capital city, recreating a way of living that is rooted in Qatari culture, attracting residents back to the city center and reversing the trend for decentralization.

| Sep 16, 2011

Chicago Architecture Foundation partners with seven renowned architects to re-imagine Chicago neighborhoods

Design on the Edge presents plans created by seven teams of nine Chicago-based architects to reimagine seven of the city’s neighborhoods to encourage street life, retail districts and dense housing around the existing “L” transit system.

| Sep 14, 2011

USGBC L.A. Chapter's Green Gala features Jason McLennan as keynote speaker

The Los Angeles Chapter of the nonprofit USGBC will launch its Sustainable Innovation Awards this year during the chapter's 7th Annual Green Gala on Thursday, November 3.

| Sep 14, 2011

Lend Lease’s role in 9/11 Memorial & Museum

Lend Lease is honored to be the general contractor for the National September 11 Memorial & Museum project at the World Trade Center site in New York City.

| Sep 14, 2011

Thornton Tomasetti’s Poon named to the Council on Tall Buildings and Urban Habitat’s Board of Trustees

 During his 30-plus years of experience, Poon has been responsible for the design and construction of super high-rise structures, mixed-used buildings, hotels, airports, arenas and residential buildings worldwide. 

| Sep 12, 2011

PVs play new roles as a teaching tool

Solar installations are helping K-12 schools around the country save money and teach students the intricacies of renewable energy sources.

| Sep 12, 2011

Living Buildings: Are AEC Firms up to the Challenge?

Modular Architecture > You’ve done a LEED Gold or two, maybe even a LEED Platinum. But are you and your firm ready to take on the Living Building Challenge? Think twice before you say yes.

| Sep 12, 2011

First phase of plan to revitalize Florida's Hialeah Park announced

This is the first project of a master plan developed to revive the historic racetrack. 

| Sep 9, 2011

Kauffman Center for the Performing Arts in Kansas City opens this month

Theatre Projects played the lead role in theatre design and planning as well as in engineering the customized theatre equipment. BNIM in Kansas City served as the executive architect.

boombox1
boombox2
native1

More In Category



Urban Planning

The magic of L.A.’s Melrose Mile

Great streets are generally not initially curated or willed into being. Rather, they emerge organically from unintentional synergies of commercial, business, cultural and economic drivers. L.A.’s Melrose Avenue is a prime example. 


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021