flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

A 75-year-old hospital in Minnesota completes its latest makeover

Healthcare Facilities

A 75-year-old hospital in Minnesota completes its latest makeover

A 25-month project includes three separate additions.


By John Caulfield, Senior Editor | July 18, 2019

A rendering of the main entry of Mora (Minn.) Hospital and Clinic, which underwent an extensive remodeling and expansion. Image: Courtesy of Kraus Anderson Construction

A $52 million expansion of FirstLight Health System, in Mora, Minn., was completed this month by Kraus-Anderson Construction, one of the industry’s leading GCs in the healthcare sector. This multi-phased project, which took 25 months, expanded and renovated about 115,000 sf of the System’s Mora Hospital and Clinic campus, about 75 miles from Minneapolis, that was built in 1943 and had been added to five other times previously.

The renovation, designed by DSGW Architects, features a new main entry and commons for waiting and registration, eye clinic, lab, new infusion/chemotherapy and radiology spaces, IT, offices, and a giftshop.

A two-story addition includes a new rehab space with therapy pool, food service kitchen, cafeteria, and inpatient pharmacy. The addition also has new units for births, medical surgeries and ICU, and new barometric and transformative rooms.

Another two-story addition has a new emergency department, community pharmacy, ambulance garage and fitness center. And a separate one-story addition includes clinical exam rooms.

The project delivered new parking areas and courtyard, a relocation of the facility’s helipad, and improved campus access from Minnesota Highway 65.

The M/E engineer on this project was Obermiller Nelson Engineering, based in Fargo, N.D. Duluth, Minn.-based Northern Consulting Engineers was the SE, and Wenck of Maple Plain, Minn., was the CE.

 

Related Stories

| Aug 11, 2010

Research Facility Breaks the Mold

In the market for state-of-the-art biomedical research space in Boston's Longwood Medical Area? Good news: there are still two floors available in the Center for Life Science | Boston, a multi-tenant, speculative high-rise research building designed by Tsoi/Kobus & Associates, Boston, and developed by Lyme Properties, Hanover, N.

| Aug 11, 2010

3 Hospitals, 3 Building Teams, 1 Mission: Optimum Sustainability

It's big news in any city when a new billion-dollar hospital is announced. Imagine what it must be like to have not one, not two, but three such blockbusters in the works, each of them tracking LEED-NC Gold certification from the U.S. Green Building Council. That's the case in San Francisco, where three new billion-dollar-plus healthcare facilities are in various stages of design and constructi...

| Aug 11, 2010

Holyoke Health Center

The team behind the new Holyoke (Mass.) Health Center was aiming for more than the renovation of a single building—they were hoping to revive an entire community. Holyoke's central business district was built in the 19th century as part of a planned industrial town, but over the years it had fallen into disrepair.

| Aug 11, 2010

Right-Sizing Healthcare

Over the past 30 years or so, the healthcare industry has quietly super-sized its healthcare facilities. Since 1980, ORs have bulked up in size by 53%, acute-care patient rooms by 77%. The slow creep went unlabeled until recently, when consultant H. Scot Latimer applied the super-sizing moniker to hospitals, inpatient rooms, operating rooms, and other treatment and administrative spaces.

| Aug 11, 2010

Great Solutions: Healthcare

11. Operating Room-Integrated MRI will Help Neurosurgeons Get it Right the First Time A major limitation of traditional brain cancer surgery is the lack of scanning capability in the operating room. Neurosurgeons do their best to visually identify and remove the cancerous tissue, but only an MRI scan will confirm if the operation was a complete success or not.

boombox1
boombox2
native1

More In Category

Healthcare Facilities

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.




Mass Timber

British Columbia hospital features mass timber community hall

The Cowichan District Hospital Replacement Project in Duncan, British Columbia, features an expansive community hall featuring mass timber construction. The hall, designed to promote social interaction and connection to give patients, families, and staff a warm and welcoming environment, connects a Diagnostic and Treatment (“D&T”) Block and Inpatient Tower.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021