flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

A 75-year-old hospital in Minnesota completes its latest makeover

Healthcare Facilities

A 75-year-old hospital in Minnesota completes its latest makeover

A 25-month project includes three separate additions.


By John Caulfield, Senior Editor | July 18, 2019

A rendering of the main entry of Mora (Minn.) Hospital and Clinic, which underwent an extensive remodeling and expansion. Image: Courtesy of Kraus Anderson Construction

A $52 million expansion of FirstLight Health System, in Mora, Minn., was completed this month by Kraus-Anderson Construction, one of the industry’s leading GCs in the healthcare sector. This multi-phased project, which took 25 months, expanded and renovated about 115,000 sf of the System’s Mora Hospital and Clinic campus, about 75 miles from Minneapolis, that was built in 1943 and had been added to five other times previously.

The renovation, designed by DSGW Architects, features a new main entry and commons for waiting and registration, eye clinic, lab, new infusion/chemotherapy and radiology spaces, IT, offices, and a giftshop.

A two-story addition includes a new rehab space with therapy pool, food service kitchen, cafeteria, and inpatient pharmacy. The addition also has new units for births, medical surgeries and ICU, and new barometric and transformative rooms.

Another two-story addition has a new emergency department, community pharmacy, ambulance garage and fitness center. And a separate one-story addition includes clinical exam rooms.

The project delivered new parking areas and courtyard, a relocation of the facility’s helipad, and improved campus access from Minnesota Highway 65.

The M/E engineer on this project was Obermiller Nelson Engineering, based in Fargo, N.D. Duluth, Minn.-based Northern Consulting Engineers was the SE, and Wenck of Maple Plain, Minn., was the CE.

 

Related Stories

| Jun 20, 2012

WHR’s Tradewell Fellowship Marks 15th Anniversary

Fellowship program marks milestone with announcement of new program curator and 2012 fellow

| Jun 6, 2012

KLMK Group awarded contract with Parkland Health & Hospital System in Texas

KLMK will also provide planning guidance in all aspects of the project related to facility activation.

| Jun 1, 2012

New BD+C University Course on Insulated Metal Panels available

By completing this course, you earn 1.0 HSW/SD AIA Learning Units.

| Jun 1, 2012

Ground broken for Children’s Hospital Colorado South Campus

Children’s Hospital Colorado expects to host nearly 80,000 patient visits at the South Campus during its first year.

| Jun 1, 2012

K-State Olathe Innovation Campus receives LEED Silver

Aspects of the design included a curtain wall and punched openings allowing natural light deep into the building, regional materials were used, which minimized the need for heavy hauling, and much of the final material included pre and post-consumer recycled content.

| May 31, 2012

5 military construction trends

Defense spending may be down somewhat, but there’s still plenty of project dollars out there if you know where to look.

| May 29, 2012

Torrance Memorial Medical Center’s pediatric burn patients create their version of new Patient Tower using Legos

McCarthy workers joined the patients, donning construction gear and hard hats, to help with their building efforts.

| May 29, 2012

Reconstruction Awards Entry Information

Download a PDF of the Entry Information at the bottom of this page.

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

boombox1
boombox2
native1

More In Category

Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 


Healthcare Facilities

U.S. healthcare building sector trends and innovations for 2024-2025

As new medicines, treatment regimens, and clinical protocols radically alter the medical world, facilities and building environments in which they take form are similarly evolving rapidly. Innovations and trends related to products, materials, assemblies, and building systems for the U.S. healthcare building sector have opened new avenues for better care delivery. Discussions with leading healthcare architecture, engineering, and construction (AEC) firms and owners-operators offer insights into some of the most promising directions. This course is worth 1.0 AIA/HSW learning unit.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021