flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

7 towers that define the 'skinny skyscraper' boom [slideshow]

7 towers that define the 'skinny skyscraper' boom [slideshow]

New York and Melbourne are leading the charge with six super-slender towers in the works. 


By BD+C Staff | February 5, 2014
Designed by Bjarke Ingels Group and James KM Cheng Architects, the 49-story Beach & Howe Tower in Vancouver features a twisting,

Recent advancements in structural design, combined with the loosening of density and zoning requirements, has opened the door for the so-called "superslim skyscraper."  

From New York to Melbourne to Vancouver, developers are planning high-rise structures on postage-stamp-sized parcels (OK, not that small, but we're talking lots as narrow as 22 feet) in dense urban locations. 

Developers love the building type because they can finally take advantage of land that was previously unusable for large multifamily and mixed-use structures.

Some projects, like the Beach & Howe Tower in Vancouver (see No. 2 below), utilize a narrow form to accommodate multiple structures on a given site.

To be considered "superthin" or "slender," a tower must have a height-to-width ratio of at least 10:1. A typical skyscraper, such as the Willis Tower, falls in the 7:1 range. The new crop of skinny towers blows those ratios out of the water. For example, the 111 West 57th Street project in New York City has a height-to-width ratio of 22.5:1.

Here's a quick look at some prominent skinny skyscraper projects in the works:

 

1. 111 West 57th Street, New York

Building Type: multifamily (100 units)
Height: 1,350 feet, 77 fours
Width: 60 feet

Building Team
Developer: JDS Development
Architect: SHoP Architects
Structural engineer: WSP Cantor Seinuk

More on 111 West 57th Street via CTBUH's Skyscraper Center

 

 

 

2. Beach & Howe Tower, Vancouver

Building Type: multifamily (407 units)
Height: 493 feet, 49 floors
Width: NA

Building Team
Developer: Westbank Corp.
Architects: Bjarke Ingels Group (BIG), James KM Cheng Architects
Structural engineer: Glotman Simpson Group
MEP engineer: Cobalt Engineering

More on the Beach & Howe Tower via CTBUH's Skyscraper Center

 

 

 

3. Phoenix Apartments, Melbourne, Australia

Building Type: multifamily (28 units)
Height: 290 feet, 29 floors
Width: 21 feet, 11 inches

Building Team
Developer: Equiset
Architect: Fender Katsalidis Architects

More on the Phoenix Apartments via Sidney Morning Herald

 

 

 

4. One57, New York

Building Type: mixed use, with hotel (210 rooms) and multifamily (92 units)
Height: 1,005 feet, 79 floors
Width: NA

Building Team
Developer: Extell Development Company
Design architect: Christian de Portzamparc
Executive architect: SLCE Architect LLP
Structural engineer: WSP Cantor Seinuk
MEP engineer: AKF Engineers
Exterior performance consultant: Israel Berger Associates
Interior designers: Yabu Pushelberg (hotel), Thomas Juul-Hansen, LLC (residential)
Contractor: Bovis Lend Lease

More on One57 via CTBUH's Skyscraper Center

 

 

 

5. 464 Collins Street, Melbourne

Building Type: mixed use, with multifamily (37 floors, 185 units) and office (13 floors)
Height: 593 feet, 50 floors
Width: 36 feet, 1 inch

Building Team
Developer: Equiset
Architect: Bates Smart

More on 464 Collins Street via Urban Melbourne

 

 

 

6. 432 Park Avenue, New York

Building type: multifamily (125 units)
Height: 1,397 feet, 85 floors
Width: 50 feet

Building Team
Developers: CIM Group, Macklowe Properties
Architects: Rafael Vinoly Architects, SLCE Architects
Structural engineer: WSP Cantor Seinuk
MEP engineer: WSP Flack + Kurtz
Contractor: Bovis Lend Lease

More on 432 Park Avenue via CTBUH's Skyscraper Center

 

 

7. 54 Clarke Street, Melbourne

Building Type: multifamily (256 units)
Height: 787 feet, 73 floors
Width: 39 feet, 4 inches

Building Team
Developer: Matrix & Cube
Architect: BKK Architects
Structural engineer: Macleod Consulting

More on 54 Clarke Street via Urban Melbourne

Related Stories

Sponsored | Architects | Jul 19, 2017

Introducing StrXur by Bluebeam

Our goal is to present unique perspectives you may not be able to find anywhere else.  

Sponsored | Accelerate Live! | Jul 13, 2017

Defining the future by mastering the art of change

From my perspective, what separates organizations thriving in the digital revolution from those who are not boils down to one thing: leadership.

Multifamily Housing | Jul 12, 2017

Midyear Rent Report: 26 states saw rental price increases in first half of 2017

The most notable rental increases are in growing markets in the South and Southwest: New Orleans, Glendale, Ariz., Houston, Reno, N.V., and Atlanta.

Giants 400 | Jul 12, 2017

Innovation abounds, but will it lead to growth for AEC Giants?

Engineering firms such as Arup, Glumac, and Thornton Tomasetti are leveraging their in-house expertise to develop products and tools for their design teams, clients, and even the competition. 

Multifamily Housing | Jul 12, 2017

7 noteworthy multifamily projects: posh amenities, healthy living, plugged-in lifestyle

Zen meditation gardens, bocce courts, saltwater pools, and free drinks highlight the niceties at these new multifamily developments.

Accelerate Live! | Jul 6, 2017

Watch all 20 Accelerate Live! talks on demand

BD+C’s inaugural AEC innovation conference, Accelerate Live! (May 11, Chicago), featured talks on machine learning, AI, gaming in construction, maker culture, and health-generating buildings.

Healthcare Facilities | Jun 29, 2017

Uniting healthcare and community

Out of the many insights that night, everyone agreed that the healthcare industry is ripe for disruption and that communities contribute immensely to our health and wellness.

Architects | Jun 25, 2017

Stantec adds RNL Design to its stable, fortifying several of its business units

The engineering giant also names successor to CEO who will retire at the end of this year.

Building Team | Jun 22, 2017

Seven lessons learned on commissioning projects

Commissioning is where the rubber meets the road in terms of building design.

Sponsored | Building Team | Jun 20, 2017

Plan ahead when building in the west

Getting a project through plan review can be an unusually long process, anywhere from six months to two years.

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021