flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

7 hip high-rise developments on the drawing board

7 hip high-rise developments on the drawing board

Learn which AEC firms are behind these compelling high-rise buildings across the globe.


By BD+C Staff | April 19, 2013

In each issue of Building Design+Construction, we feature the latest new construction and renovation projects in our On the Drawing Board section. Here's a collection of recently profiled high-rise projects in the works around the world. They include Adrian Smith and Gordon Gill's whimsical Dancing Dragons tower in Seoul and a 1,312-foot-tall finance and trade center under construction in Nanning, China.

 

 

 

 

 

 

 

1. Mixed-use Towers in Seoul awake the dancing dragons

Adrian Smith + Gordon Gill Architecture designed Dancing Dragons, a pair of landmark mixed-use towers, for the new Yongsan International Business District in Seoul, South Korea. Slender mini-towers cantilevered around a central core make up the buildings, which include residential, “officetel,” and retail elements. The design aesthetic, including the building skin, includes aspects of traditional Korean culture. In both buildings the mini-tower cuts are clad in glass at the top and bottom, making for dramatic skylights above the units at the highest levels and a transparent floor beneath the units at the lowest levels. The Building Team also includes PositivEnergy Practice and Werner Sobek.

 

2. Supertall skyscraper planned for capital of Guangxi province

John Portman & Associates has been selected by developer Guangxi Wei Zhuang Real Estate Co. to design Tian Long Fortune Center, the first supertall skyscraper in Nanning, China. With a height of 1,312 feet, the building will provide new headquarters for member companies of ASEAN (Association of Southeast Asian Nations) and is envisioned as a finance and trade center. The upper portion of the tower will include an atrium hotel with a fitness center, pool, executive club, and restaurants. The building also will contain a public observation complex, providing a 360-degree view.

 

3. Residential building will offer luxury in newly enlivened Boston neighborhood

Blake Middleton, FAIA, and Deborah Moelis of Handel Architects designed Millennium Place, a 15-story residential building in Boston, located on the corner of Avery and Washington Streets. Developed by Millennium Partners, the building will serve as the keystone of the Avery Street Corridor, part of a new neighborhood recently brought to life. The 155-foot building consists of 256 residences, with one, two, and three bedrooms, ranging in size from 750 sf to 2,400 sf. Residences are expected to range in price from $550,000 to $2.8 million. Millennium Place is slated for initial occupancy in fall 2013. Suffolk Construction is the builder.

 

4. Corporate HQ in the works in Xiaoshan district

A 52-story office building is currently in development in the Xiaoshan District in Hangzhou, China. Designed by Chicago’s Turner + DeCelles for the Zhejiang Hengyi Group, the tower will provide office space for ~2,000 employees. A below-grade transit “superstation” will house conference facilities, retail shops, and parking. Approximately half of the office space will be held for future growth but leased to tenants on an interim basis. Also on the Building Team: BMP Project Consulting (program manager) and Tongji Architectural Design of Shanghai (local design firm).

 

5. 'Glass waterfall' façade highlights design of Education First HQ

Phase one of the 10-story, 300,000-sf headquarters for EF Education First, a Cambridge, Mass.-based private education company, is under way. Designed by Wingardh Arkitektkontor AB of Sweden and Wilson Architects, the facility will provide 230,000 sf of office and educational space, a 65,000-sf parking garage, a 14,000-sf restaurant, and 31,000 sf of ground- and mezzanine-level public space. In a design-build partnership, Skanska USA Building will serve as contractor, while TG Gallagher will provide HVAC, plumbing, and fire protection services.

 

6. Fourth-tallest building in Vancouver under construction on a tight site

Westbank Projects Corp. commissioned BIG-Bjarke Ingels Group to design a 49-story, 600-unit mixed-use tower in downtown Vancouver. Beach and Howe tower combines 653,890 sf of residential, retail, and commercial space in an urban complex at the entrance to the Granville Street Bridge. In response to a constricted urban site, BIG designed the tower to be inverted. The tower’s small triangular base curves away from the bridge to allow light and air to enter lower apartments. As it rises, the building’s shape transforms into larger, rectangular floor plates that culminate in a square top. Buro Happold engineering firm, working with the local engineer of record, Glotman Simpson, designed a concrete core with post-tensioned walls to protect against damage in case of an earthquake and also to improve performance. Other Building Team members: design firm Dialog, Cobalt Engineering, planning and landscape architecture firm PFS, and local architect James Cheng.

 

7. Downtown Dallas development will provide many tenant options

BOKA Powell, working with commercial real estate development and investment firm KDC, has created an adaptable design for the new 400,000-sf, Class A office tower at the Victory Park mixed-use development in downtown Dallas. The 23-story building, with more than 14 floors of office space above an eight-story parking structure, is designed to accommodate a wide variety of floor plate sizes, ranging from 25,000 to 54,000 sf, to meet the needs of a range of potential tenants. Construction is expected to begin in the fall. KDC will pursue LEED certification.

 

Related Stories

| Apr 23, 2014

Mean and Green: Top 10 green building projects for 2014 [slideshow]

The American Institute of Architects' Committee on the Environment has selected the top ten examples of sustainable architecture and ecological design projects that protect and enhance the environment. Projects range from a project for Portland's homeless to public parks to a LEED Platinum campus center.

| Apr 16, 2014

Upgrading windows: repair, refurbish, or retrofit [AIA course]

Building Teams must focus on a number of key decisions in order to arrive at the optimal solution: repair the windows in place, remove and refurbish them, or opt for full replacement.

| Apr 15, 2014

12 award-winning structural steel buildings

Zaha Hadid's Broad Art Museum and One World Trade Center are among the projects honored by the American Institute of Steel Construction for excellence in structural steel design.

| Apr 15, 2014

Chipperfield's sparkling brass-clad scheme selected to be new home of Nobel Prize

The distinctive building, with its shimmering vertical brass elements and glass façade design, beat out two other finalists in the Nobel Center architectural competition.

| Apr 14, 2014

Perkins+Will-designed KSU Engineering building now under construction

The facility will consolidate instructional, research, and office space from across campus into a flexible environment. 

| Apr 9, 2014

Steel decks: 11 tips for their proper use | BD+C

Building Teams have been using steel decks with proven success for 75 years. Building Design+Construction consulted with technical experts from the Steel Deck Institute and the deck manufacturing industry for their advice on how best to use steel decking.

| Apr 8, 2014

Science, engineering find common ground on the Northeastern University campus [slideshow]

The new Interdisciplinary Science and Engineering Building is designed to maximize potential of serendipitous meetings between researchers.

| Apr 2, 2014

8 tips for avoiding thermal bridges in window applications

Aligning thermal breaks and applying air barriers are among the top design and installation tricks recommended by building enclosure experts.

| Mar 26, 2014

Callison launches sustainable design tool with 84 proven strategies

Hybrid ventilation, nighttime cooling, and fuel cell technology are among the dozens of sustainable design techniques profiled by Callison on its new website, Matrix.Callison.com. 

| Mar 20, 2014

Common EIFS failures, and how to prevent them

Poor workmanship, impact damage, building movement, and incompatible or unsound substrate are among the major culprits of EIFS problems. 

boombox1
boombox2
native1

More In Category

K-12 Schools

New K-12 STEM center hosts robotics learning, competitions in Houston suburb

A new K-12 STEM Center in a Houston suburb is the venue for robotics learning and competitions along with education about other STEM subjects. An unused storage building was transformed into a lively space for students to immerse themselves in STEM subjects. Located in Texas City, the ISD Marathon STEM and Robotics Center is the first of its kind in the district. 




Student Housing

The University of Michigan addresses a decades-long student housing shortage with a new housing-dining facility

The University of Michigan has faced a decades-long shortage of on-campus student housing. In a couple of years, the situation should significantly improve with the addition of a new residential community on Central Campus in Ann Arbor, Mich. The University of Michigan has engaged American Campus Communities in a public-private partnership to lead the development of the environmentally sustainable living-learning student community.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021