flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

$61,000 awarded to students in Cleveland’s ACE Mentor Program

$61,000 awarded to students in Cleveland’s ACE Mentor Program

Mayor Frank G. Jackson gives keynote address at scholarship event for 80 Cleveland Metropolitan School District students involved in the ACE Mentor Program, which provides guidance and assistance for students interested in careers in the integrated construction industry.


By Posted by Tim Gregorski, Senior Editor | May 21, 2012
CMSD students in the ACE program received scholarships totaling more than $61,00
CMSD students in the ACE program received scholarships totaling more than $61,000

University Hospitals, together with Gilbane Building Co., and Regency Construction Services, Inc., awarded $61,000 in scholarships to students in the ACE (Architecture, Construction and Engineering) Mentor Program. This is the second $50,000 scholarship award made from the health system’s $200,000 donation to the ACE Mentor Program of Cleveland.  Individual student scholarships were provided by Gilbane and Regency while Kent State University, Cuyahoga Community College, and Cleveland State University provided matching scholarship awards to senior students entering architecture and engineering programs next fall.

Students presented their final design projects to a crowd of more than 250 family members, fellow students, community leaders and local businesses. A special guest panel of industry professionals provided input into the presentations, including Terry Schwartz, Director, Cleveland Urban Design Collaborative; Bob Brown, Director of City Planning, City of Cleveland; Hunter Morison, Director, YSU Urban Design Center; and Aparna Bapu, The Rise Group.

Thirty-five local architecture, engineering and construction firms provided more than 50 volunteers to mentor the students throughout the school year.  A selection of participating companies include Array Healthcare Facility Solutions, Architect; Barber & Hoffman, Structural Engineer; Chas E. Phipps Company, Material Supplier; Cleveland Educational Design Alliance, Architect; CT Consultants, Civil Engineer; Gilbane Building Company, Construction Manager; Herschman Architects, Architect; Michael Benza & Associates, Civil Engineer; PCS, Construction Manager; Regency Construction Services, Inc., Construction Manager; Stantec, Architect; Turner Construction Company, Construction Manager; URS, Architect/Engineer and VIP Restoration, Masonry Contractor. +

Related Stories

| Nov 1, 2010

Vancouver’s former Olympic Village shoots for Gold

The first tenants of the Millennium Water development in Vancouver, B.C., were Olympic athletes competing in the 2010 Winter Games. Now the former Olympic Village, located on a 17-acre brownfield site, is being transformed into a residential neighborhood targeting LEED ND Gold. The buildings are expected to consume 30-70% less energy than comparable structures.

| Oct 27, 2010

Grid-neutral education complex to serve students, community

MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.

| Oct 21, 2010

GSA confirms new LEED Gold requirement

The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.

| Oct 18, 2010

World’s first zero-carbon city on track in Abu Dhabi

Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.

| Oct 13, 2010

Editorial

The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.

| Oct 13, 2010

Test run on the HP Z200 SFF Good Value in a Small Package

Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.

| Oct 13, 2010

Prefab Trailblazer

The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.

| Oct 13, 2010

Thought Leader

Sundra L. Ryce, President and CEO of SLR Contracting & Service Company, Buffalo, N.Y., talks about her firm’s success in new construction, renovation, CM, and design-build projects for the Navy, Air Force, and Buffalo Public Schools.

| Oct 13, 2010

Hospital tower gets modern makeover

The Wellmont Holston Valley Medical Center in Kingsport, Tenn., expanded its D unit, a project that includes a 243,443-sf addition with a 12-room operating suite, a 36-bed intensive care unit, and an enlarged emergency department.

boombox1
boombox2
native1

More In Category

Healthcare Facilities

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021