flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

$545 million patient pavilion at Vassar Brothers Medical Center completes

Healthcare Facilities

$545 million patient pavilion at Vassar Brothers Medical Center completes

CallisonRTKL designed the project.


By David Malone, Associate Editor | February 3, 2021
Patient pavilion at Vassar Brothers Medical Center

Photos: Brad Feinknopf

Walsh Construction and joint venture partner Consigli Construction have completed Nuvance Health’s new 752,610-sf patient pavilion at Vassar Brothers medical center. The $545 million medical pavilion is the largest single construction project in the history of Poughkeepsie and will transform healthcare in the Hudson Valley.

The facility includes 264 private patient rooms, 30 critical care rooms, a 66-room emergency department, 12 surgical suites, and a 300-seat conference center. The private patient rooms offer more than twice the space per patient than the current semi-private rooms. 

The pavilion’s distinctive curved shape follows the aesthetic of the adjacent Hudson River and includes sustainable design features such as:

— Lower level roofs lined with varied flora to better assimilate the structure with the environment, while retaining rainwater runoff

— High performance, dual-paneled glazing to lessen solar gain and low-reflectivity glass that will protect birds from collisions

—Low-flow faucets and fixtures with auto-off controls that save an estimated 20,000 gallons of water per day

—LED lights, energy recovery, and efficient insulation that will result in an estimated 20% reduction in energy demand

—Underground garage with preferred parking spaces and charging station for hybrid and electric vehicles.

 

New Patient Pavilion at Vassar Brothers Medical Center exterior

 

Throughout the four-year construction project, the Walsh/Consigli team managed the installation of approximately 3.45-million-linear-feet of cabling, 1.4-million pounds of ductwork, 200,000 square feet of metal panel facade, 775,500 linear feet of conduit, 13,000 light fixtures, 4,400 tons of steel, 30,000 cubic yards of concrete, and 103,000-square-feet of glass.

Vassar Brothers Medical Center opened the new emergency department and trauma center on January 9, 2021, followed by the opening of the remainder of the patient pavilion on January 11.

Related Stories

Market Data | Dec 5, 2017

Top health systems engaged in $21 billion of U.S. construction projects

Largest active projects are by Sutter Health, New York Presbyterian, and Scripps Health.

Healthcare Facilities | Nov 30, 2017

Scope it out

How to design and build what’s needed to meet organizational goals and strategies.

University Buildings | Nov 28, 2017

FXFOWLE and CO Architects collaborate on Columbia University School of Nursing building

The building has a ‘collaboration ribbon’ that runs throughout the building.

Sponsored | Windows and Doors | Nov 21, 2017

Daylighting promotes healing and wellness at the Florida Hospital for Women at Orlando Campus

Growing research demonstrates that patients recover faster and better from illness or surgery in settings that offer abundant daylight and views to the outdoors.

Healthcare Facilities | Nov 6, 2017

Design isn’t enough to foster collaboration in healthcare and research spaces

A new Perkins Eastman white paper finds limited employee interaction at NYU Winthrop Hospital, a year after it opened. 

Healthcare Facilities | Oct 25, 2017

Creating child-friendly healthcare spaces: Five goals for success

Children often accompany parents or grandparents in medical settings; what can we do to address their unique needs?

Greenbuild Report | Oct 23, 2017

NZE and carbon neutral

An Army hospital in the Mojave Desert sets a new bar for sustainable design.

Designers | Oct 10, 2017

Merging artwork and building design

With many hospital projects, art can be a construction-phase afterthought.

Healthcare Facilities | Oct 5, 2017

Architectural best practices for behavioral health: A case study at VCBR

Confined treatment centers for civilly-committed individuals.

Healthcare Facilities | Sep 29, 2017

Having a vision

The ability to clearly communicate specific priorities to your team is among the most important tasks the owner’s leadership team will perform.

boombox1
boombox2
native1

More In Category


Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021