flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

$53 million Chamberlain apartments will comprise six buildings, three new and three renovated

Multifamily Housing

$53 million Chamberlain apartments will comprise six buildings, three new and three renovated

The project’s groundbreaking was held on July 19.


By David Malone, Associate Editor | August 20, 2018

Designed by UrbanWorks Architecture, a new $53 million apartment complex is now under construction in Richfield, Minn.

The project, which is being built by a partnership between Kraus-Anderson (general contractor) and Inland Development Partners, will comprise three new construction buildings and three renovated ones. The complex will provide 316 units in total. Of the 316 mixed-income units, 20% will be designated as affordable housing.

 

See Also: First Half 2018 commercial and multifamily construction starts show mixed performance across top metropolitan areas

 

In addition to the new apartment units, the project will also extend Richfield Parkway through the complex south from 66th Street to 70th Street. The property was purchased from the City of Richfield and is being funded via the HUD 221(d)(4) program through the AFL-CIO Housing Investment trust and placed by Dougherty Mortgage of Minneapolis.

The first units are expected to be open in fall 2019.

Related Stories

University Buildings | Feb 29, 2016

4 factors driving the student housing market

In the hyper-competitive higher education sector, colleges and universities view residence halls as extensions of their academic brands, both on and off campus.

Multifamily Housing | Feb 24, 2016

Senior housing sector experiences record-setting year, says CBRE

Senior housing occupancy is at its highest level since 2007, and 2015 was a record year for sales and institutional transactions, according to CBRE.

Industry Research | Feb 22, 2016

8 of the most interesting trends from Gensler’s Design Forecast 2016

Technology is running wild in Gensler’s 2016 forecast, as things like virtual reality, "smart" buildings and products, and fully connected online and offline worlds are making their presence felt throughout many of the future's top trends.

Multifamily Housing | Feb 10, 2016

Miami review board recommends approval for Arquitectonica’s top-heavy condo tower

The 57-story Elysee Miami will offer residents impeccable views and plenty of amenities.  

Multifamily Housing | Feb 5, 2016

Design guidelines for retail space in NYC affordable housing projects released

Aimed at designing efficient, flexible ground-floor space.  

Multifamily Housing | Feb 2, 2016

10 top bathroom design trends for 2016

Floating vanities, tricked-out showers, and freestanding tubs highlight the top bathroom design trends, according to a survey of kitchen and bath design professionals by the National Kitchen and Bath Association.

Multifamily Housing | Feb 1, 2016

Top 10 kitchen design trends for 2016

Charging stations, built-in coffeemakers, and pet stations—these are among the top kitchen design trends for the coming year, according to a new survey of kitchen and bath designers by the National Kitchen & Bath Association.

Codes and Standards | Jan 22, 2016

Treasury Dept. will start crackdown on illicit money in luxury real estate

The move is expected to impact high-end condo development.

| Jan 14, 2016

How to succeed with EIFS: exterior insulation and finish systems

This AIA CES Discovery course discusses the six elements of an EIFS wall assembly; common EIFS failures and how to prevent them; and EIFS and sustainability.

Multifamily Housing | Jan 8, 2016

Manager of New York’s first micro-unit development inks pact with ‘personal butler’ service

The co-living platform Ollie is leasing its initial building, in New York, with housekeeping and grocery shopping available via Hello Alfred.

boombox1
boombox2
native1

More In Category

Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021