flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

5 new designs unveiled for Make It Right homes at Fort Peck, Mont.

5 new designs unveiled for Make It Right homes at Fort Peck, Mont.

More than 600 out of the 6,000 people living on the Fort Peck Indian Reservation are on a waiting list for housing. 


By BD+C Staff | June 23, 2014
Method Homes' home design for the Fort Peck Indian Reservation.
Method Homes' home design for the Fort Peck Indian Reservation.

Make It Right, Brad Pitt's foundation that builds homes for people in need, has just revealed five new designs for the Fort Peck (Mont.) Indian Reservation.

The organization plans to build 20 three- and four-bedroom homes on the reservation in the short-term. In the long term, a sustainable master plan for the entire 3,300-square-mile reservation is in the works, Arch Daily reports.

The designs come from GRAFT, Sustainable Native Communities Collaborative, Architecture for Humanity, Method Homes, and Living Homes, and were created with direction from the Fort Peck community. All homes are to be built to the standard of LEED Platinum certification. 

More than 600 out of the 6,000 people living on the Fort Peck Reservation are on a waiting list for housing. Make It Right's homes will be available to those at or below 60% of the area's median income. 

 

GRAFT 

Rendering credit: GRAFT
 
“One of the most fascinating aspects of working with Make It Right is the real collaboration with the community. This kind of relationship with the community is the real success of Make It Right projects.” - Christoph Korner, founding partner, GRAFT
 
 
 

Architecture for Humanity

Rendering credit: Architecture for Humanity
 
“We are enthusiastic about these home designs that reflect traditional life ways while exemplifying deep green public-impact architecture.” - Nathaniel Corum, architect, Architecture for Humanity
 
 
 

Method Homes

Rendering credit: Method Homes
 
“The community engagement in the design process and overall mission of creating a holistically sustainable community have been inspiring to witness.” - Brian Abramson, co-founder, Method Homes
 
 
 

Living Homes

Rendering credit: Living Homes
 
“We believe Make It Right’s Fort Peck project will set a standard for sustainable community development.” - Steve Glenn, founder, Living Homes
 
 
 

Sustainable Native Communities Collaborative

Rendering credit: Sustainable Native Communities Collaborative
 
“As a tribal designer working in Indian Country, I feel we have an obligation to design and build housing that is tied to the culture, community and place of Fort Peck.” - Joseph Kunkel, architect, Sustainable Native Communities Collaborative

Related Stories

| Nov 29, 2011

First EPD awarded to exterior roof and wall products manufacturer

EPD is a standardized, internationally recognized tool for providing information on a product’s environmental impact. 

| Nov 29, 2011

Suffolk Construction breaks ground on Boston residential tower

Millennium Place III is a $220 million, 256-unit development that will occupy a full city block in Boston’s Downtown Crossing.

| Nov 29, 2011

Report finds credit crunch accounts for 20% of nation’s stalled projects

Persistent financing crunch continues to plague design and construction sector.

| Nov 29, 2011

SB Architects completes Mission Hills Volcanic Mineral Springs and Spa in China

Mission Hills Volcanic Mineral Springs and Spa is home to the largest natural springs reserve in the region, and measures 950,000 sf.

| Nov 29, 2011

Turner Construction establishes partnership with Clark Builders

Partnership advances growth in the Canadian marketplace.

| Nov 29, 2011

AIA launches stalled projects database

To populate this database with both stalled projects and investors interested in financing them, the AIA in the last week initiated a communications campaign to solicit information about stalled projects around the country from its members and allied professionals.

| Nov 28, 2011

Leo A Daly and McCarthy Building complete Casino Del Sol expansion in Tucson, Ariz.

Firms partner with Pascua Yaqui Tribe to bring new $130 million Hotel, Spa & Convention Center to the Tucson, Ariz., community.

| Nov 28, 2011

Armstrong acquires Simplex Ceilings

Simplex will become part of the Armstrong Building Products division.

| Nov 28, 2011

Nauset Construction completes addition for Franciscan Hospital for Children

The $6.5 million fast-track, urban design-build projectwas completed in just over 16 months in a highly sensitive, occupied and operational medical environment.

| Nov 23, 2011

Lord, Aeck & Sargent opens fourth U.S. office, acquiring architecture firm in Austin, Texas

Strategic move offers growth opportunity and strengthens the firm’s historic preservation portfolio.

boombox1
boombox2
native1

More In Category



Urban Planning

The magic of L.A.’s Melrose Mile

Great streets are generally not initially curated or willed into being. Rather, they emerge organically from unintentional synergies of commercial, business, cultural and economic drivers. L.A.’s Melrose Avenue is a prime example. 


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021