flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

5 new designs unveiled for Make It Right homes at Fort Peck, Mont.

5 new designs unveiled for Make It Right homes at Fort Peck, Mont.

More than 600 out of the 6,000 people living on the Fort Peck Indian Reservation are on a waiting list for housing. 


By BD+C Staff | June 23, 2014
Method Homes' home design for the Fort Peck Indian Reservation.
Method Homes' home design for the Fort Peck Indian Reservation.

Make It Right, Brad Pitt's foundation that builds homes for people in need, has just revealed five new designs for the Fort Peck (Mont.) Indian Reservation.

The organization plans to build 20 three- and four-bedroom homes on the reservation in the short-term. In the long term, a sustainable master plan for the entire 3,300-square-mile reservation is in the works, Arch Daily reports.

The designs come from GRAFT, Sustainable Native Communities Collaborative, Architecture for Humanity, Method Homes, and Living Homes, and were created with direction from the Fort Peck community. All homes are to be built to the standard of LEED Platinum certification. 

More than 600 out of the 6,000 people living on the Fort Peck Reservation are on a waiting list for housing. Make It Right's homes will be available to those at or below 60% of the area's median income. 

 

GRAFT 

Rendering credit: GRAFT
 
“One of the most fascinating aspects of working with Make It Right is the real collaboration with the community. This kind of relationship with the community is the real success of Make It Right projects.” - Christoph Korner, founding partner, GRAFT
 
 
 

Architecture for Humanity

Rendering credit: Architecture for Humanity
 
“We are enthusiastic about these home designs that reflect traditional life ways while exemplifying deep green public-impact architecture.” - Nathaniel Corum, architect, Architecture for Humanity
 
 
 

Method Homes

Rendering credit: Method Homes
 
“The community engagement in the design process and overall mission of creating a holistically sustainable community have been inspiring to witness.” - Brian Abramson, co-founder, Method Homes
 
 
 

Living Homes

Rendering credit: Living Homes
 
“We believe Make It Right’s Fort Peck project will set a standard for sustainable community development.” - Steve Glenn, founder, Living Homes
 
 
 

Sustainable Native Communities Collaborative

Rendering credit: Sustainable Native Communities Collaborative
 
“As a tribal designer working in Indian Country, I feel we have an obligation to design and build housing that is tied to the culture, community and place of Fort Peck.” - Joseph Kunkel, architect, Sustainable Native Communities Collaborative

Related Stories

| Mar 7, 2012

Firestone iPad app offers touch technology

Free app provides a preview of Firestone’s Roots to Rooftop Building Envelope Solution with an overview of all the products from ground and stormwater management solutions, to complete wall panel and commercial roofing system applications.

| Mar 7, 2012

LEO A DALY opens new office in Riyadh, Saudi Arabia

Jay N. Kline, Regional Manager – Saudi Arabia, to lead new office.

| Mar 7, 2012

Turner appointed Batson-Cook CFO and treasurer

Cecil G. Hood to continue in advisory role.

| Mar 7, 2012

Thornton Tomasetti names Dowdall VP of Kansas City office

Dowdall will be responsible for supporting the Property Loss Consulting, Building Performance and Building Sustainability practices nationally.

| Mar 7, 2012

LEO A DALY selected to design Minnesota Fallen Firefighters Memorial

The bronze, figurative sculpture of a firefighter rescuing a child, which is currently on display at the Minneapolis/St. Paul International Airport, is lit by natural light through a circular void in the monolith.

| Mar 7, 2012

Houlihan Lokey adds Steffen to Industrials Group

Steffen bolsters group with experience in the building materials and rorest product sectors.

| Mar 6, 2012

Country’s first Green House home for veterans completed

Residences at VA Danville to provide community-centered housing for military veterans.

| Mar 6, 2012

EwingCole completes first design-build project for the USMA

The second phase of the project, which includes the academic buildings and the lacrosse and football fields, was completed in January 2012.

| Mar 6, 2012

Gensler and Skender complete new corporate headquarters for JMC Steel in Chicago

Construction was completed by Skender in just 12 weeks.

| Mar 6, 2012

BLT Architects promotes two to associate

Architect Nicole Dress and interior designer Jessica Moser acknowledged for excellence.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021