flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

5 must reads for the AEC industry today: April 17, 2020

Market Data

5 must reads for the AEC industry today: April 17, 2020

Meet the 'AEC outsiders' pushing the industry forward and the world's largest Living Building.


By BD+C Editors | April 17, 2020


1. Meet the ‘AEC outsiders’ who are helping to push the industry into the new decade (BD+C)
"As part of BD+C’s 2019 Giants 300 Technology and Innovation Study, 130 of the nation’s largest AEC firms were polled on a variety of topics, including whether or not the firm had a non-AEC hire in the past 24 months. Nearly two-thirds (63.8%) reported that they had hired an “AEC outsider” in this time period."

2. This will be the largest Living Building in the world
"Designed to last 500 years, the building has a projected Energy Use Index (EUI) of 18.6 kBtu/SF/YR; a typical Portland office building built to code has a EUI of 40.8 kBtu/SF/YR. A 133 kW PV solar array will occupy 8,300 sf on the building's roof and another 195.4 kW PV array will occupy 10,300 sf on the roof of a partner organization."

3. Boston mayor considers 'slow ramp-up' for construction (Boston Business Journal) 
"Boston Mayor Martin J. Walsh intends to speak with construction leaders in the next few days to discuss potentially restarting construction within the city, which Walsh halted in March in response to the coronavirus pandemic."

4. Building officials turn to video inspections to mitigate COVID-19 risk (Construction Dive)
"Building inspectors from Ohio, Nevada and Florida found common benefits to performing inspections using inexpensive tools like Facetime, Skype, Google Duo and Microsoft Teams. These include being able to perform inspections earlier in the day since they don't have to physically start their day in the office and then spend time driving to the project. The consensus was that as long as the inspection would be visually-based under normal circumstances, an inspection via video is acceptable."

5. Construction project on hold? Don't forget to maintain stored equipment (Karpinski Engineering) 
"One of the downstream effects of the COVID-19 pandemic is that many owners are placing their construction projects on hold. As they do so, they need to make sure that they are properly storing any equipment that has been delivered — or even installed — that will not be operational while the project is on hold," writes Karpinski Engineering's Lee Hodkey.

 

For more top stories from BD+C,  
sign up for the BD+C Daily 5 newsletter

Related Stories

Market Data | Jul 1, 2020

7 must reads for the AEC industry today: July 1, 2020

Facebook to build $800 million data center and 329 metro areas added construction jobs in May.

Market Data | Jun 30, 2020

AIA releases strategies and illustrations for reducing risk of COVID-19 in senior living communities

Resources were developed as part of AIA’s “Reopening America: Strategies for Safer Buildings” initiative.

Market Data | Jun 30, 2020

329 metro areas added construction jobs in May

Seattle-Bellevue-Everett, Wash. added the most construction jobs (28,600, 44%) in May.

Market Data | Jun 29, 2020

6 must reads for the AEC industry today: June 29, 2020

HQ tower features gardens on every floor and the head of Hilton talks about how his business will survive.

Market Data | Jun 26, 2020

5 must reads for the AEC industry today: June 26, 2020

Restoration of 1930s El Paso hotel completes and Arc offers tools, analytics for safe workplace re-entry.

Market Data | Jun 25, 2020

Commercial Construction Index drops amid Coronavirus pandemic, but contractors poised for near-term recovery

Contractors quickly prioritized worker health and safety, and 1 in 3 plan to hire more workers in the next 6 months.

Market Data | Jun 25, 2020

7 must reads for the AEC industry today: June 25, 2020

CDC to build the most advanced high containment laboratory in the country and architecture billings downward trajectory moderates.

Market Data | Jun 24, 2020

Architecture billings downward trajectory moderates

AIA’s Architecture Billings Index (ABI) score for May was 32.0 compared to 29.5 in April, but still represents a significant decrease in services provided by U.S. architecture firms.

Market Data | Jun 24, 2020

8 must reads for the AEC industry today: June 24, 2020

San Francisco's apartment market goes in reverse and WATG designs a solution for isolating without sacrificing social connectivity.

Market Data | Jun 23, 2020

National survey reveals pandemic's impact on college students' mental health, remote learning, families' income and more

Of 2,500 student respondents, 75% feel more anxious or stressed, 57% said they lost their summer jobs and 90% want to return to campus in the fall.

boombox1
boombox2
native1

More In Category


Contractors

Nonresidential construction spending decreased 0.2% in June

National nonresidential construction spending declined 0.2% in June, according to an Associated Builders and Contractors analysis of data published today by the U.S. Census Bureau. On a seasonally adjusted annualized basis, nonresidential spending totaled $1.21 trillion. Nonresidential construction has expanded 5.3% from a year ago.



Construction Costs

Data center construction costs for 2024

Gordian’s data features more than 100 building models, including computer data centers. These localized models allow architects, engineers, and other preconstruction professionals to quickly and accurately create conceptual estimates for future builds. This table shows a five-year view of costs per square foot for one-story computer data centers. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021