Demolition of the elevated Doyle Drive viaduct—and a new tunnel replacing it—is freeing up more space with views in San Francisco’s Presidio Parklands.
To fill this new void, Archdaily reports that the Presidio Trust invited five teams to envision “kid-friendly” plans for a 13-acre portion of the site, all of whom have unveiled their designs last week after three months of working.
The five teams competing are: James Corner Field Operations, OLIN with Olson Kundig Architects, Snøhetta with Hood Design Studio, West 8, and CMG Landscape Architecture. The winner will be announced in January.
Here’s a sneak peak of the unveiled designs:
Your Gateway Park
By Olin and Olson Kundig Architects
© OLIN Courtesy of the Presidio Trust
Presidio Point
By James Corner Field Operations
© James Corner Field Operations Courtesy of the Presidio Trust
Arcs & Strands
By Snøhetta and Hood Design Studio
© Snohetta Courtesy of the Presidio Trust
The Observation Post
By CMG Landscape Architecture
© CMG Landscape Architecture Courtesy of the Presidio Trust
PresidiO
By West 8
More information about each can be found at Archdaily.
Related Stories
| Mar 19, 2012
Smith Carter joins forces with Genivar
Smith Carter has a workforce of some 190 employees and designs complex buildings in challenging environments.
| Mar 19, 2012
HKS Selected for Baylor Medical Center at Waxahachie
Baylor Medical Center at Waxahachiewill incorporate advanced technology including telemedicine, digital imaging, remote patient monitoring, electronic medical records and computer patient records.
| Mar 19, 2012
Mixed-use project redefines Midtown District in Plantation, Fla.
Stiles Construction is building the residential complex, which is one of Broward County’s first multifamily rental communities designed to achieve LEED certification from the USGBC.
| Mar 16, 2012
Temporary fix to CityCenter's Harmon would cost $2 million, contractor says
By contrast, CityCenter half-owner and developer MGM Resorts International determined last year that the Harmon would collapse in a strong quake and can't be fixed in an economical way. It favors implosion at a cost of $30 million.
| Mar 16, 2012
Work on Oxnard, Calif. shopping center resumes after a three-year hiatus
Stalled since 2009, developers of the Collection at RiverPark decided to restart construction on the outdoor mall.
| Mar 16, 2012
Stego embarks on HPD Pilot Program
Vapor barrier manufacturer strives to provide better green choices to designers and builders.
| Mar 16, 2012
Marvin Windows and Doors accepting entries for fourth-annual myMarvin Architect’s Challenge
Architects in U.S. and abroad offered the chance to showcase their very best work.
| Mar 14, 2012
Hearing to decide fate of unfinished Harmon in Las Vegas under way
The testimony began with CityCenter consulting engineer Chukwuma Ekwueme methodically showing photo after photo of parts of the Harmon, where he and his team had chipped away the concrete pillars and beams to examine the steel reinforcing bars inside.
| Mar 14, 2012
Firestone names 2012 Master Contractor Award Winners
Annual award acknowledges industry’s top roofing professionals.