Demolition of the elevated Doyle Drive viaduct—and a new tunnel replacing it—is freeing up more space with views in San Francisco’s Presidio Parklands.
To fill this new void, Archdaily reports that the Presidio Trust invited five teams to envision “kid-friendly” plans for a 13-acre portion of the site, all of whom have unveiled their designs last week after three months of working.
The five teams competing are: James Corner Field Operations, OLIN with Olson Kundig Architects, Snøhetta with Hood Design Studio, West 8, and CMG Landscape Architecture. The winner will be announced in January.
Here’s a sneak peak of the unveiled designs:
Your Gateway Park
By Olin and Olson Kundig Architects
© OLIN Courtesy of the Presidio Trust
Presidio Point
By James Corner Field Operations
© James Corner Field Operations Courtesy of the Presidio Trust
Arcs & Strands
By Snøhetta and Hood Design Studio
© Snohetta Courtesy of the Presidio Trust
The Observation Post
By CMG Landscape Architecture
© CMG Landscape Architecture Courtesy of the Presidio Trust
PresidiO
By West 8
More information about each can be found at Archdaily.
Related Stories
| May 31, 2012
2011 Reconstruction Award Profile: Seegers Student Union at Muhlenberg College
Seegers Student Union at Muhlenberg College has been reconstructed to serve as the core of social life on campus.
| May 31, 2012
2011 Reconstruction Awards Profile: Ka Makani Community Center
An abandoned historic structure gains a new life as the focal point of a legendary military district in Hawaii.
| May 31, 2012
5 military construction trends
Defense spending may be down somewhat, but there’s still plenty of project dollars out there if you know where to look.
| May 31, 2012
New School’s University Center in NYC topped out
16-story will provide new focal point for campus.
| May 31, 2012
Day & Zimmermann taps Jobe for ECM VP
Ken Jobe, a senior executive with 30+ years of industry-related experience, joins Day & Zimmermann to expand footprint in the process & industrial markets.
| May 31, 2012
Perkins+Will-designed engineering building at University of Buffalo opens
Clad in glass and copper-colored panels, the three-story building thrusts outward from the core of the campus to establish a new identity for the School of Engineering and Applied Sciences and the campus at large.
| May 30, 2012
Construction milestone reached for $1B expansion of San Diego International Airport
Components of the $9-million structural concrete construction phase included a 700-foot-long, below-grade baggage-handling tunnel; metal decks covered in poured-in-place concrete; slab-on-grade for the new terminal; and 10 exterior architectural columns––each 56-feet tall and erected at a 14-degree angle.
| May 30, 2012
Pringle Brandon in discussions to join forces with Perkins+Will
The London offices would be known as Pringle Brandon Perkins+Will.
| May 30, 2012
Boral Bricks announces winners of “Live.Work.Learn” student architecture contest
Eun Grace Ko, a student at the Ryerson University in Toronto, Canada, named winner of annual contest.