flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

5 competing designs unveiled for Presidio Parklands in San Francisco

5 competing designs unveiled for Presidio Parklands in San Francisco

The Presidio Trust will announce a winning design in January.


By BD+C Staff | September 11, 2014
The Observation Post / CMG Landscape Architecture. Image CMG Landscape Architecture Courtesy of the Presidio Trust

Demolition of the elevated Doyle Drive viaduct—and a new tunnel replacing it—is freeing up more space with views in San Francisco’s Presidio Parklands.

To fill this new void, Archdaily reports that the Presidio Trust invited five teams to envision “kid-friendly” plans for a 13-acre portion of the site, all of whom have unveiled their designs last week after three months of working.

The five teams competing are: James Corner Field Operations, OLIN with Olson Kundig Architects, Snøhetta with Hood Design Studio, West 8, and CMG Landscape Architecture. The winner will be announced in January.

Here’s a sneak peak of the unveiled designs:

Your Gateway Park
By Olin and Olson Kundig Architects


© OLIN Courtesy of the Presidio Trust 

 

 

Presidio Point
By James Corner Field Operations


© James Corner Field Operations Courtesy of the Presidio Trust 

 

 

Arcs & Strands
By Snøhetta and Hood Design Studio


© Snohetta Courtesy of the Presidio Trust 

 

 

The Observation Post
By CMG Landscape Architecture


© CMG Landscape Architecture Courtesy of the Presidio Trust 

 

 

PresidiO
By West 8


© Team West 8 

 

More information about each can be found at Archdaily. 

Related Stories

| Oct 30, 2012

Two-hour fire rated curtain wall passes CDC tests

CDC (Curtain Wall Design and Consulting) is an independent firm providing a wide range of building envelope design, engineering, and consulting services to design professionals nationwide.

| Oct 30, 2012

Wight & Company announces three hires

Expands team and adds staff to work on the UNO project.

| Oct 15, 2012

Silicones from Dow Corning solve high-altitude technical challenges at the world’s tallest tower

The spectacular Burj Khalifa skyscraper soars to 828m above ground level, holding the record for being the world’s tallest building and also for the highest installation of an aluminum and glass façade. To take on its numerous challenges and technical difficulties, it required proven silicone solutions and full support from Dow Corning.

| Oct 15, 2012

Three new members elected to AISC Board of Directors

New members will immediately begin serving on the AISC Board of Directors, assisting with the organization's planning and leadership in the steel construction industry.

| Oct 11, 2012

Hank Adams Named to Lead HDR’s Healthcare Program

With more than 25 years of experience, HDR vice president is tapped to lead firm's healthcare projects.

| Oct 10, 2012

Foster + Partners to Design New 425 Park Avenue Tower

Conceptual designs submitted by Foster, Hadid, Koolhaas and Rogers to be on exhibit during Municipal Art Society’s Annual Symposium

| Oct 9, 2012

AIA billings index sounds a positive note

The so-called new projects index was at a relatively healthy 57.2, up from 56.3 the previous month.

| Oct 9, 2012

Celebrating brick in architecture

The Brick Industry Association’s 2012 Brick in Architecture Awards put the spotlight on new projects that make creative use of one of humankind’s oldest and most beloved building materials.

| Oct 5, 2012

2012 Reconstruction Award Special Recognition: Joplin Interim High School, Joplin, Mo.

At 5:41 p.m. CDT on Sunday, May 22, 2011, an EF5 tornado touched down in Joplin, Mo. In the next 31 minutes, the mile-wide, multiple-vortex tornado, with winds up to 250 mph, destroyed two thousand buildings, including Joplin High and nine other schools.

| Oct 5, 2012

2012 Reconstruction Award Bronze Winner: DPR Construction, Phoenix Regional Office, Phoenix, Ariz.

Working with A/E firm SmithGroupJJR, DPR converted a vacant 16,533-sf one-time “adult-themed boutique” in the city’s reemerging Discovery Triangle into a LEED-NC Platinum office, one that is on target to be the first net-zero commercial office building in Arizona.

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021