flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

5 building projects that put the 'team' in teamwork

5 building projects that put the 'team' in teamwork

The 2013 Building Team Award winners exemplify excellence in team collaboration. 


By BD+C Editors | June 12, 2013
The Georgia Tech Carbon-Neutral Energy Solutions Laboratory was the lone Platinu
The Georgia Tech Carbon-Neutral Energy Solutions Laboratory was the lone Platinum Award winner in the 2013 Building Team Awards competition.
This article first appeared in the BD+C June 2013 issue of BD+C.
The BD+C editors proudly present the winners of the 2013 Building Team Awards. Now in its 16th year, the Building Team Awards program honors commercial building projects that set the standard of excellence in design and construction, while meeting the needs of the owner, the occupant, and the community—all of which could not be accomplished without the successful collaboration of the Building Team.
 
 
 
 
 
 
 
 
 
 
 

Platinum Award Winner—Georgia Tech Carbon-Neutral Energy Solutions (CNES) Laboratory

Building Team cooperation and expertise help Georgia Tech create a LEED Platinum building for energy science. Read the article.
 
 
 
 

Gold Award Winner—Roosevelt University Wabash Building, Chicago

Roosevelt University builds a 32-story tower to satisfy students’ needs for housing, instruction, and recreation. Read the article.
 
 
 
 

Gold Award Winner—Endo Health Solutions, Malvern, Pa.

Working together for the first time, a unified Building Team executes a large pharmaceutical office program in just 12 months—while meeting the needs of two demanding clients. Read the article.
 
 
 
 

Silver Award Winner—Old Town School of Folk Music, East Building, Chicago

A LEED Gold project enhances a busy Chicago neighborhood, meeting ambitious criteria for acoustical design and adaptability. Read the article.
 
 
 
 

Bronze Award Winner—Vernon S. Broyles Jr. Leadership Center, Decatur, Ga.

A renovation/addition project at Columbia Theological Seminary unites a historic residence hall with a modern classroom facility. Read the article.
 
 
 

 

2013 Building Team Awards Judges

 

 
2013 Building Team Awards jury members (left to right): Peter Rumpf, LEED AP; Daniel Hughes; Cierine M. Nicolas, PE, LEED AP; Meggan M. Lux, AIA, NCARB, LEED AP BD+C; Terry Fielden, LEED AP BD+C. The editors of BD+C (not pictured) also participated in the judging. The jury was held April 24 at the Cliff Dwellers Club, Chicago, founded in 1907 by author Hamlin Garland (in portrait).
 
 
Daniel Hughes
Senior Manager, Facility Operations
Discover
Riverwoods, Ill.
 
Terry Fielden, LEED AP BD+C
Director of K-12 Education
International Contractors, Inc.
Elmhurst, Ill.
 
Meggan M. Lux, AIA, NCARB, 
LEED AP BD+C
Partner
UrbanWorks
Chicago
 
Cierine M. Nicolas, PE, LEED AP
Vice President
Environmental Systems Design, Inc.
Chicago
 
Peter Rumpf, LEED AP
Integrated Construction Manager
Mortenson Construction
Elk Grove Village, Ill.

Related Stories

| Dec 17, 2010

Alaskan village school gets a new home

Ayagina’ar Elitnaurvik, a new K-12 school serving the Lower Kuskikwim School District, is now open in Kongiganak, a remote Alaskan village of less than 400 residents. The 34,000-sf, 12-classroom facility replaces one that was threatened by river erosion.

| Dec 17, 2010

Luxury condos built for privacy

A new luxury condominium tower in Los Angeles, The Carlyle has 24 floors with 78 units. Each of the four units on each floor has a private elevator foyer. The top three floors house six 5,000-sf penthouses that offer residents both indoor and outdoor living space. KMD Architects designed the 310,000-sf structure, and Elad Properties was project developer.

| Dec 17, 2010

Subway entrance designed to exude Hollywood charm

The Hollywood/Vine Metro portal and public plaza in Los Angeles provides an entrance to the Red Line subway and the W Hollywood Hotel. Local architect Rios Clementi Hale Studio designed the portal and plaza to flow with the landmark theaters and plazas that surround it.

| Dec 17, 2010

New engineering building goes for net-zero energy

A new $90 million, 250,000-sf classroom and laboratory facility with a 450-seat auditorium for the College of Electrical and Computer Engineering at the University of Illinois at Urbana/Champaign is aiming for LEED Platinum.

| Dec 17, 2010

Vietnam business center will combine office and residential space

The 300,000-sm VietinBank Business Center in Hanoi, Vietnam, designed by Foster + Partners, will have two commercial towers: the first, a 68-story, 362-meter office tower for the international headquarters of VietinBank; the second, a five-star hotel, spa, and serviced apartments. A seven-story podium with conference facilities, retail space, restaurants, and rooftop garden will connect the two towers. Eco-friendly features include using recycled heat from the center’s power plant to provide hot water, and installing water features and plants to improve indoor air quality. Turner Construction Co. is the general contractor.

| Dec 17, 2010

Toronto church converted for condos and shopping

Reserve Properties is transforming a 20th-century church into Bellefair Kew Beach Residences, a residential/retail complex in The Beach neighborhood of Toronto. Local architecture firm RAWdesign adapted the late Gothic-style church into a five-story condominium with 23 one- and two-bedroom units, including two-story penthouse suites. Six three-story townhouses also will be incorporated. The project will afford residents views of nearby Kew Gardens and Lake Ontario. One façade of the church was updated for retail shops.

| Dec 17, 2010

ARRA-funded Navy hospital aims for LEED Gold

The team of Clark/McCarthy, HKS Architects, and Wingler & Sharp are collaborating on the design of a new naval hospital at Camp Pendleton in Southern California. The $451 million project is the largest so far awarded by the U.S. Navy under the American Recovery and Reinvestment Act. The 500,000-sf, 67-bed hospital, to be located on a 70-acre site, will include facilities for emergency and primary care, specialty care clinics, surgery, and intensive care. The Building Team is targeting LEED Gold.

| Dec 17, 2010

Arizona outpatient cancer center to light a ‘lantern of hope’

Construction of the Banner MD Anderson Cancer Center in Gilbert, Ariz., is under way. Located on the Banner Gateway Medical Center campus near Phoenix, the three-story, 131,000-sf outpatient facility will house radiation oncology, outpatient imaging, multi-specialty clinics, infusion therapy, and various support services. Cannon Design incorporated a signature architectural feature called the “lantern of hope” for the $90 million facility.

| Dec 17, 2010

Cladding Do’s and Don’ts

A veteran structural engineer offers expert advice on how to avoid problems with stone cladding and glass/aluminum cladding systems.

| Dec 17, 2010

5 Tips on Building with SIPs

Structural insulated panels are gaining the attention of Building Teams interested in achieving high-performance building envelopes in commercial, industrial, and institutional projects.

boombox1
boombox2
native1

More In Category


Retail Centers

Thinking outside the big box (store)

For over a decade now, the talk of the mall industry has been largely focused on what developers can do to fill the voids left by a steady number of big box store closures. But what do you do when big box tenants stay put?


Government Buildings

OSHA’s proposed heat standard published in Federal Register

The Occupational Safety and Health Administration (OSHA) has published a proposed standard addressing heat illness in outdoor and indoor settings in the Federal Register. The proposed rule would require employers to evaluate workplaces and implement controls to mitigate exposure to heat through engineering and administrative controls, training, effective communication, and other measures.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021