flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

5 building projects that put the 'team' in teamwork

5 building projects that put the 'team' in teamwork

The 2013 Building Team Award winners exemplify excellence in team collaboration. 


By BD+C Editors | June 12, 2013
The Georgia Tech Carbon-Neutral Energy Solutions Laboratory was the lone Platinu
The Georgia Tech Carbon-Neutral Energy Solutions Laboratory was the lone Platinum Award winner in the 2013 Building Team Awards competition.
This article first appeared in the BD+C June 2013 issue of BD+C.
The BD+C editors proudly present the winners of the 2013 Building Team Awards. Now in its 16th year, the Building Team Awards program honors commercial building projects that set the standard of excellence in design and construction, while meeting the needs of the owner, the occupant, and the community—all of which could not be accomplished without the successful collaboration of the Building Team.
 
 
 
 
 
 
 
 
 
 
 

Platinum Award Winner—Georgia Tech Carbon-Neutral Energy Solutions (CNES) Laboratory

Building Team cooperation and expertise help Georgia Tech create a LEED Platinum building for energy science. Read the article.
 
 
 
 

Gold Award Winner—Roosevelt University Wabash Building, Chicago

Roosevelt University builds a 32-story tower to satisfy students’ needs for housing, instruction, and recreation. Read the article.
 
 
 
 

Gold Award Winner—Endo Health Solutions, Malvern, Pa.

Working together for the first time, a unified Building Team executes a large pharmaceutical office program in just 12 months—while meeting the needs of two demanding clients. Read the article.
 
 
 
 

Silver Award Winner—Old Town School of Folk Music, East Building, Chicago

A LEED Gold project enhances a busy Chicago neighborhood, meeting ambitious criteria for acoustical design and adaptability. Read the article.
 
 
 
 

Bronze Award Winner—Vernon S. Broyles Jr. Leadership Center, Decatur, Ga.

A renovation/addition project at Columbia Theological Seminary unites a historic residence hall with a modern classroom facility. Read the article.
 
 
 

 

2013 Building Team Awards Judges

 

 
2013 Building Team Awards jury members (left to right): Peter Rumpf, LEED AP; Daniel Hughes; Cierine M. Nicolas, PE, LEED AP; Meggan M. Lux, AIA, NCARB, LEED AP BD+C; Terry Fielden, LEED AP BD+C. The editors of BD+C (not pictured) also participated in the judging. The jury was held April 24 at the Cliff Dwellers Club, Chicago, founded in 1907 by author Hamlin Garland (in portrait).
 
 
Daniel Hughes
Senior Manager, Facility Operations
Discover
Riverwoods, Ill.
 
Terry Fielden, LEED AP BD+C
Director of K-12 Education
International Contractors, Inc.
Elmhurst, Ill.
 
Meggan M. Lux, AIA, NCARB, 
LEED AP BD+C
Partner
UrbanWorks
Chicago
 
Cierine M. Nicolas, PE, LEED AP
Vice President
Environmental Systems Design, Inc.
Chicago
 
Peter Rumpf, LEED AP
Integrated Construction Manager
Mortenson Construction
Elk Grove Village, Ill.

Related Stories

| Feb 14, 2012

Angelo State University opens doors to new recreation center expansion

  Designed by SmithGroup, the JJR_Center for Human Performance offers enhanced fitness options, dynamic gathering space.

| Feb 14, 2012

SAIC selected for architectural and engineering design services at Lajes Field, Azores

SAIC’s services will include a broad variety of new construction projects and maintenance and repair projects

| Feb 14, 2012

Skanska promotes Aparicio and hires Leintz in Southern California

Aparicio and Leintz are both based in Skanska’s Los Angeles office.

| Feb 14, 2012

The Jackson Laboratory announces Gilbane Building Co. as program manager for Connecticut facility

Gilbane to manage program for new genomic medicine facility that will create 300 jobs in Connecticut.

| Feb 14, 2012

Thornton Tomasetti names Al Hashimi vice president for its Middle East Operations

Al Hashimi is joining the company to help expand Thornton Tomasetti’s business in the region and support clients locally.

| Feb 13, 2012

WHR Architects renovation of Morristown Memorial Hospital Simon Level 5 awarded LEED Gold

Located in the Simon Building, which serves as the main entrance leading into the Morristown Memorial Hospital campus, the project comprises three patient room wings connected by a centralized nursing station and elevator lobby.

| Feb 13, 2012

Center for Sustainable Building Research launches CommercialWindows.org

Resource aims at reducing commercial operating costs and energy consumption.

| Feb 13, 2012

New medical city unveiled in Abu Dhabi

SOM’s design for the 838-bed, three-million-square foot complex creates a new standard for medical care in the region.

| Feb 10, 2012

Task force addresses questions regarding visually graded Southern Pine lumber

Answers address transition issues, how to obtain similar load-carrying capabilities, and why only some grades and sizes are affected at this time. 

| Feb 10, 2012

Atlanta Housing Authority taps Johnson Controls to improve public housing efficiency

Energy-efficiency program to improve 13 senior residential care facilities and save nearly $18 million.

boombox1
boombox2
native1

More In Category

Construction Costs

Data center construction costs for 2024

Gordian’s data features more than 100 building models, including computer data centers. These localized models allow architects, engineers, and other preconstruction professionals to quickly and accurately create conceptual estimates for future builds. This table shows a five-year view of costs per square foot for one-story computer data centers. 


Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.



Healthcare Facilities

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021