Glimcher Realty Trust announced the completion of a 4.8-megawatt SunPower rooftop solar system at Jersey Gardens in Elizabeth, N.J. The project, which is among the largest rooftop systems in North America, broke ground in June 2011 and began producing power this week.
Anchored by tenants like Gap Outlet, H&M, Lord & Taylor Outlet, Neiman Marcus Last Call, Nike Factory Store and Saks Fifth Avenue Off 5th, Jersey Gardens is the largest outlet mall in New Jersey. The mall was built by Glimcher Realty Trust in 1999 on the site of a former landfill.
The project is comprised of more than 15,000 high efficiency SunPower panels, and generates approximately the amount of power required for 564 New Jersey homes. It is expected to generate the equivalent of 11 percent of the mall’s electrical demand.
The solar power system at Jersey Gardens was made possible through a partnership with Gerding Edlen Development, Inc. and Gerding Edlen Sustainable Solutions.
This project is the result of a power purchase agreement between Glimcher Realty Trust and Clean Focus Corporation. Under the agreement, Clean Focus financed and owns the system. All solar renewable energy credits and environmental benefits associated with the system will be owned by Clean Focus. Jersey Gardens will buy the electricity at a predetermined, predictable price, providing a long-term hedge against rising power prices with no initial capital investment.
The Jersey Gardens solar system was designed and installed by SunPower Corp., which will also operate and maintain the system. The system uses the SunPowerT5 Solar Roof Tile, which is the solar industry’s first non-penetrating rooftop product that combines a high-efficiency SunPower solar panel, frame and mounting system into a single, pre-engineered unit. Tilted at a 5-degree angle, the system will approximately double the energy generated per square meter compared to other systems that are mounted flat onto commercial rooftops. BD+C
Related Stories
| May 18, 2011
Addition provides new school for pre-K and special-needs kids outside Chicago
Perkins+Will, Chicago, designed the Early Learning Center, a $9 million, 37,000-sf addition to Barrington Middle School in Barrington, Ill., to create an easily accessible and safe learning environment for pre-kindergarten and special-needs students.
| May 18, 2011
Raphael Viñoly’s serpentine-shaped building snakes up San Francisco hillside
The hillside location for the Ray and Dagmar Dolby Regeneration Medicine building at the University of California, San Francisco, presented a challenge to the Building Team of Raphael Viñoly, SmithGroup, DPR Construction, and Forell/Elsesser Engineers. The 660-foot-long serpentine-shaped building sits on a structural framework 40 to 70 feet off the ground to accommodate the hillside’s steep 60-degree slope.
| May 18, 2011
New center provides home to medical specialties
Construction has begun on the 150,000-sf Medical Arts Pavilion at the University Medical Center in Princeton, N.J.
| May 18, 2011
Improvements add to Detroit convention center’s appeal
Interior and exterior renovations and updates will make the Detroit Cobo Center more appealing to conventioneers. A new 40,000-sf ballroom will take advantage of the center’s riverfront location, with views of the river and downtown.
| May 18, 2011
One of Delaware’s largest high schools seeks LEED for Schools designation
The $82 million, 280,000-sf Dover (Del.) High School will have capacity for 1,800 students and feature a 900-seat theater, a 2,500-seat gymnasium, and a 5,000-seat football stadium.
| May 18, 2011
Carnegie Hall vaults into the 21st century with a $200 million renovation
Historic Carnegie Hall in New York City is in the midst of a major $200 million renovation that will bring the building up to contemporary standards, increase educational and backstage space, and target LEED Silver.
| May 17, 2011
Redesigning, redefining the grocery shopping experience
The traditional 40,000- to 60,000-sf grocery store is disappearing and much of the change is happening in the city. Urban infill sites and mixed-use projects offer grocers a rare opportunity to repackage themselves into smaller, more efficient, and more convenient retail outlets. And the AEC community will have a hand in developing how these facilities will look and operate.
| May 17, 2011
Architecture billings index fell in April, hurt by tight financing for projects
The architecture billings index, a leading indicator of U.S. construction activity, fell in April, hurt by tight financing for projects. The architecture billings index fell 2.9 points last month to 47.6, a level that indicates declining demand for architecture services, according to the American Institute of Architects.