flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

4.8-megawatt solar power system completed at Jersey Gardens Mall

4.8-megawatt solar power system completed at Jersey Gardens Mall

Solar array among the largest rooftop systems in North America.


By By BD+C Staff | February 16, 2012
The project is comprised of more than 15,000 high efficiency SunPower panels, an
The project is comprised of more than 15,000 high efficiency SunPower panels, and generates approximately the amount of power re

Glimcher Realty Trust announced the completion of a 4.8-megawatt SunPower rooftop solar system at Jersey Gardens in Elizabeth, N.J. The project, which is among the largest rooftop systems in North America, broke ground in June 2011 and began producing power this week.

Anchored by tenants like Gap Outlet, H&M, Lord & Taylor Outlet, Neiman Marcus Last Call, Nike Factory Store and Saks Fifth Avenue Off 5th, Jersey Gardens is the largest outlet mall in New Jersey. The mall was built by Glimcher Realty Trust in 1999 on the site of a former landfill.

The project is comprised of more than 15,000 high efficiency SunPower panels, and generates approximately the amount of power required for 564 New Jersey homes. It is expected to generate the equivalent of 11 percent of the mall’s electrical demand.  

The solar power system at Jersey Gardens was made possible through a partnership with Gerding Edlen Development, Inc. and Gerding Edlen Sustainable Solutions.

 This project is the result of a power purchase agreement between Glimcher Realty Trust and Clean Focus Corporation. Under the agreement, Clean Focus financed and owns the system. All solar renewable energy credits and environmental benefits associated with the system will be owned by Clean Focus. Jersey Gardens will buy the electricity at a predetermined, predictable price, providing a long-term hedge against rising power prices with no initial capital investment.

 The Jersey Gardens solar system was designed and installed by SunPower Corp., which will also operate and maintain the system. The system uses the SunPowerT5 Solar Roof Tile, which is the solar industry’s first non-penetrating rooftop product that combines a high-efficiency SunPower solar panel, frame and mounting system into a single, pre-engineered unit. Tilted at a 5-degree angle, the system will approximately double the energy generated per square meter compared to other systems that are mounted flat onto commercial rooftops. BD+C

Related Stories

| Nov 16, 2011

Project completion of BRAC 132, Office of the Chief Army Reserve Building, Ft. Belvoir, Va.

This fast-tracked, design-build project consists of a three-story, 88,470 sf administrative command building housing approximately 430 employees.

| Nov 16, 2011

Architecture Billings Index moves upward

The Architecture Billings Index climbed nearly three points in October. 

| Nov 16, 2011

CRSI recommends return to inch-pound markings

The intention of this resolution is for all new rollings of reinforcing steel products to be marked with inch-pound bar markings no later than January 1st, 2014. 

| Nov 16, 2011

John Patelski joins Ghafari as executive vice president

As executive vice president, Patelski will be responsible for expanding the firm’s services in new strategic markets.

| Nov 15, 2011

Struggling economy demands construction industry embrace enterprise-wide risk management

In today’s business environment of high supply and limited demand, it has become especially vital for organizations in the construction sector to effectively manage risk.

| Nov 15, 2011

Suffolk Construction breaks ground on the Victor housing development in Boston

Project team to manage construction of $92 million, 377,000 square-foot residential tower.

| Nov 15, 2011

Miller joins Perkins Eastman as regional manager, Middle East and Northern Africa

Miller joins Perkins Eastman with more than 48 years of experience in architecture, design management, and construction administration for planning and infrastructure.

| Nov 14, 2011

Summit Design+Build selected at GC for new Office Concepts headquarters

The new headquarters will include 17,000 sf of office space and 15,000 sf of warehouse and feature 24 ft ceilings, an open floor plan, two conference rooms and one training room and will feature sustainable finishes throughout. 

| Nov 14, 2011

Griffin Electric completes electrical work at Cary Arts Center

  The Griffin Electric team was responsible for replacing the previous electrical service on-site with a 1000A, 480/277V service and providing electrical feeds for a new fire pump chiller, six air-handlers and two elevators.

boombox1
boombox2
native1

More In Category




Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021