flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

44-acre mixed-use project completes in Northridge, Calif.

Mixed-Use

44-acre mixed-use project completes in Northridge, Calif.

Ware Malcomb designed the project.


By David Malone, Associate Editor | November 5, 2018
The Mix entry facade
The Mix entry facade

After a three phase construction plan, The Mix at Harman Campus has officially opened. The 44-acre site combines office, retail, and restaurant space in a campus environment that promotes walkability and connection between buildings.

The project first broke ground in May 2016. Phases 1 and 2 consisted of the renovation of an existing 200,000-sf building into a multi-tenant office space. The renovation included a new exterior red brick, wood, and metal entry facade and a new circulation corridor. The central corridor includes open-air windows, high-ceilings, and plentiful natural light.

 

The Mix retail strip

See Also: Europe’s citizenM is trying to crack into the U.S. hotel market with steel-framed modular construction

 

Phase 3 of the project saw the construction of two new single-story speculative retail and restaurant buildings that total 17,000 sf. Town Square Park, a central landscaped courtyard amenity space with bocce ball courts and outdoor dining areas, was also constructed in Phase 3.

Oltmans Construction Co. was the general contractor for Phase 1 of the project while RM Dalton Corporation was the general contractor for Phases 2 and 3. Ware Malcomb provided master planning, architecture, interior design, and branding services for the project.

 

The Mmix facade and painting

Tags

Related Stories

Mixed-Use | Oct 11, 2021

Manhattan West opens the heart of New York City’s Far West Side

The project links several New York neighborhoods.

Mixed-Use | Oct 5, 2021

Ground-up mixed-use building completes near Wrigley Field

Hirsch/MPG Architecture + Planning designed the project.

Mixed-Use | Sep 28, 2021

BIG designs new Farfetch HQ on the slopes of Leça River in Porto

The project is situated within the larger Fuse Valley site.

Mixed-Use | Aug 19, 2021

COVID-conscious, pandemic-ready skyscraper breaks ground in Miami

The project will be part of Miami Worldcenter.

Mixed-Use | Aug 4, 2021

Diamond Schmitt to lead design for Therme Canada | Ontario Place redevelopment

The project will be a year-round waterfront destination.

Mixed-Use | Jul 16, 2021

SOM to lead the design of the 2026 Milan-Cortina Olympic Village

The project is part of the updated Porta Romana railway yard master plan.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021