flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

4 projects honored with AIA TAP Innovation Awards for excellence in BIM and project delivery

BIM and Information Technology

4 projects honored with AIA TAP Innovation Awards for excellence in BIM and project delivery

Morphosis Architects' Emerson College building in Los Angeles and the University of Delaware’s ISE Lab are among the projects honored by AIA for their use of BIM/VDC tools.


By AIA | May 27, 2015
4 designs honored at AIA's TAP Innovation Awards

The three main massing elements (south bar, atrium, and north tower) are each designed with their own structural systems and floor-to-floor heights to maximize efficiencies. Image: Alene Davis

The American Institute of Architects (AIA) Technology in Architectural Practice (TAP) Knowledge Community developed the AIA TAP Innovation Awards to honor state of the art of the design, delivery, and management of the built environment as enabled by advanced processes and technologies.

TAP has spearheaded efforts to highlight case studies from the profession in the harnessing of BIM technology and processes to further design, construction, and project excellence. The AIA TAP Innovation Awards emphasizes how this array of new practices and technologies will further enable project delivery and enhance data-centric methodologies in the management of buildings for their entire lifecycle, from design, to construction, and through operations.

Categories for the TAP Innovation Awards include: Stellar Architecture, Delivery Process Excellence, Academic Program/Curriculum Development (none selected this year), and Exemplary use in a Small Firm.  

 

Category A – Stellar Architecture

Submissions in this category exhibited exemplary architectural design and display innovations in practices and technologies. 

Emerson College; Los Angeles
Morphosis Architects

An all-glass facade at street level invites students and the community to mingle at the public cafe. Image: Iwan Baan

 

Morphosis created a custom computational tool to layout key design elements that allowed for aesthetic and sustainable features to be developed in concert with each other. Anticipated to achieve a LEED Gold rating, this project delivers advanced energy efficiency features including radiant heating and cooling, window contacts to facilitate natural ventilation, operable sunshades, user controllability, and solar thermal collectors.

The project is expected to achieve a 15% energy cost savings over baseline figures and a 31% reduction of potable water use in all fixtures. Responding to local weather conditions, the automated sunshade system opens and closes horizontal fins outside the high-performance glass curtain-wall to minimize heat gain while maximizing daylight and views.  

 

 

Category B – Delivery Process Excellence

Submissions in this category exhibited outstanding examples of innovations in collaboration in the project delivery process to fulfill project goals. 

University of Delaware’s Interdisciplinary Science and Engineering Lab (ISE Lab);
Newark, Del.
Ayers Saint Gross

The building and site utilize best green practices, including capturing stormwater in the landscape. Image: Tom Holdsworth

 

The architect and consulting engineers developed 13 design models using BIM software, which were combined to allow a full understanding of how each building system affected the other. These models were constantly available to the construction management team and fabricators via the project cloud.

An open exchange of files between design and construction entities allowed the project to be completed 60 days ahead of schedule. Robotically-controlled bulldozers enabled a greater level of control for site grading and retention swales. A constantly evolving schedule was made possible by linking modeled elements to timelines, ensuring early or on-time completion of each phase of construction.

 

 

Honorable Mention 

OHSU/PSU/OSU Collaborative Life Sciences Building; Portland, Ore.
SERA Architects and CO Architects

The complex geometries of the building, including the atrium and its ramping system, were molded and coordinated in Revit and Navisworks. Image: Jeremy Bitterman

 

With 28 design teams in 10 states, the use of modeling software, file exchange software, cloud-based collaboration technology, and document management tools was critical to the project’s work flow. The entire construction team chose to collocate throughout the project, which allowed it to be conceived, constructed, and delivered in only 38 months.

During the latter stages of design, the architect, engineers, contractor, and subcontractors met frequently to hold clash-detection meetings, resolving system conflicts during design and easing the 3D model transition to the subcontractors. The design team calculated the total savings to the owner for their all-digital process was just under $10 million when accounting for print costs and labor hours.

 

 

Category D – Exemplary Use in a Small Firm

Submissions in this category exhibited exemplary improvements through application of progressive practices, innovative processes and advanced technologies in a firm of 10 or fewer members, at any stage(s) of the overall process of project feasibility assessment, programming, design, documentation, procurement, construction, and operation. 

D-Bridge
Point B Design

Visual voxels project structural voels' geometry into the interior, maximizing visual stimulation. Image: Point B Design

 

The D-Bridge is a yet-unbuilt architectural project and experimental structure that serves as an extension to a private gallery and residence. The core feature of the Bridge serves as both its form and structure with 1,000 laser-cut, folded cells made from flat sheets of stainless steel (voxels). By developing a cultural change in practice, the team has been able to engage everyone involved in the project to create a greater level of collaboration and understanding. 

 

The jury for the AIA TAP Innovation Awards include:
• Steven Wolf, AIA (Chair), Target Corporation
• Dr. Carrie Sturts Dossick, P.E., University of Washington
• Federico Negro, CASE
• Shane Burger, Woods Bagot
• Randall Deutsch, AIA, University of Illinois at Urbana-Champaign

Related Stories

BIM and Information Technology | Sep 16, 2015

Norman Foster proposes 'drone ports' as a way to ship goods across Africa

The structures would store cargo-shipping drones and serve as community centers.

BIM and Information Technology | Sep 16, 2015

VIDEO: See how Wiss, Janney, Elstner engineers use drones to perform building inspections

"We believe that drone usage will enable building owners to assess problems quicker and with less risk to the general public and workers,” said WJE Principal Michael Petermann.

BIM and Information Technology | Sep 14, 2015

Is Apple's new iPad Pro a game changer for architects?

A stylus, split screen, and improved graphics make designing on the tablet easier.

BIM and Information Technology | Sep 9, 2015

How is data changing the nature of design?

Advances in building information modeling allow for more thorough project documentation, but don't get lost in the white noise, writes Shepley Bulfinch’s Kyle Martin. 

BIM and Information Technology | Sep 7, 2015

The power of data: How AEC firms and owners are using analytics to transform design and construction

Case’s bldgs = data conference highlighted how collecting data about personal activities can inform design and extend the power of BIM/VDC.

BIM and Information Technology | Aug 28, 2015

MIT researchers develop 3D printer that produces intricate glass structures

The machine uses molten glass as its “ink,” contained in a “kiln cartridge” that heats up at 1,900 degrees until it is molten and pliable.

BIM and Information Technology | Aug 27, 2015

Zebra Imaging launches 3D hologram creator for Autodesk Revit

Company promises new product will bring "easy creation process" to holographic imaging in AEC community.

Office Buildings | Aug 24, 2015

British company OpenDesk offers open-sourced office furniture

Offices can “download” their furniture to be made locally, anywhere.

Energy Efficiency | Aug 24, 2015

Google develops Google Maps for solar energy

The tool offers high-resolution aerial maps, like the one used in Google Earth, to estimate the total sunlight a rooftop receives throughout the year.

Sponsored | BIM and Information Technology | Aug 20, 2015

Part II - Will BIM Work as a Deliverable? A Legal Perspective on BIM

Having the right counsel on your team can be the difference between long drawn-out negotiations and breaking new ground to meet the owner’s needs.

boombox1
boombox2
native1

More In Category



AEC Tech

Lack of organizational readiness is biggest hurdle to artificial intelligence adoption

Managers of companies in the industrial sector, including construction, have bought the hype of artificial intelligence (AI) as a transformative technology, but their organizations are not ready to realize its promise, according to research from IFS, a global cloud enterprise software company. An IFS survey of 1,700 senior decision-makers found that 84% of executives anticipate massive organizational benefits from AI. 


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021