flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

$3B Willets Points mixed-use development in New York wins City Council approval

$3B Willets Points mixed-use development in New York wins City Council approval

The massive development includes a mall, rooftop farm, retail space, hotel, and thousands of apartment units. 


By BD+C Editor | October 25, 2013

The $3 billion Willets Points plan in New York City that will transform 23 acres into a mixed-use development has gained approval from the City Council. Construction will be done in two phases and will include a mall, rooftop farm, retail space, a hotel and thousands of apartment units.

The project is expected to create 12,000 construction jobs, and generate billions in economic activity. The city has either spent or earmarked about $400 million on the development including the purchase of the land in the northern Queens neighborhood and funded key infrastructure improvements such as sewage and paved streets to an area that was one of the few remaining pockets in the city with neither.

According to a Crains New York report, the city has either spent or earmarked about $400 million on the development during the past five years, including the purchase of 23 acres of land in the northern Queens neighborhood and infrastructure improvements. Last year, the city reached a deal with developers, the Related Cos. and Sterling Equities, to design, construct and operate the massive development.

(http://www.crainsnewyork.com/article/20131009/REAL_ESTATE/131009874)

Related Stories

| Jan 2, 2015

Construction put in place enjoyed healthy gains in 2014

Construction consultant FMI foresees—with some caveats—continuing growth in the office, lodging, and manufacturing sectors. But funding uncertainties raise red flags in education and healthcare.

| Dec 29, 2014

Reef Worlds to build world’s largest underwater theme park for luxury resort [BD+C's 2014 Great Solutions Report]

Dubai is known for its gargantuan commercial building projects. The latest to be proposed is the world’s largest underwater theme park, designed and built by Reef Worlds. The project was named a 2014 Great Solution by the editors of Building Design+Construction.

| Dec 28, 2014

AIA course: Enhancing interior comfort while improving overall building efficacy

Providing more comfortable conditions to building occupants has become a top priority in today’s interior designs. This course is worth 1.0 AIA LU/HSW.

| Dec 22, 2014

Studio Gang to design Chicago’s third-tallest skyscraper

The first U.S. real-estate investment by The Wanda Group, owned by China’s richest man, will be an 88-story, 1,148-ft-tall mixed-use tower designed by Jeanne Gang.

| Dec 2, 2014

Nonresidential construction spending rebounds in October

This month's increase in nonresidential construction spending is far more consistent with the anecdotal information floating around the industry, says ABC's Chief Economist Anirban Basu.

| Nov 29, 2014

20 tallest towers that were never completed

Remember the Chicago Spire? What about Russia Tower? These are two of the tallest building projects that were started, but never completed, according to the Council on Tall Buildings and Urban Habitat. The CTBUH Research team offers a roundup of the top 20 stalled skyscrapers across the globe.

| Nov 18, 2014

New tool helps developers, contractors identify geographic risk for construction

The new interactive tool from Aon Risk Solutions provides real-time updates pertaining to the risk climate of municipalities across the U.S.

| Nov 17, 2014

Goettsch Partners-designed Grand Hyatt opens in Dalian, China

The triangular shape of the 44-story tower ensures that all bays receive southern light and views of the Yellow Sea.

| Nov 10, 2014

5 guiding principles for solving airflow issues in open-plenum office spaces

Although architecturally appealing, exposed ceilings can create unwanted drafts and airflow problems if not engineered correctly. McGuire Engineers' Bill Stangeland offers tips for avoiding airflow issues on these projects.

| Nov 10, 2014

Hotel construction pipeline hits five-year high

The hotel construction pipeline hit a five-year high in the third quarter, clocking in at 3,516 projects and 443,936 rooms, Lodging Econometrics reports. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021