flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

$3.8-million athletic field and track opens in Glen Head, N.Y.

$3.8-million athletic field and track opens in Glen Head, N.Y.

The complex also includes a new, one-story, multi-purpose building that serves as the main entry port to the athletic facilities.


By Posted by Tim Gregorski, Senior Editor | September 24, 2012
The new, $3.8-million, 100,000-square-foot sports complex replaced and expanded
The new, $3.8-million, 100,000-square-foot sports complex replaced and expanded the deteriorated facilities which were insuffici

The leadership of the North Shore School District, community leaders and BBS Architects, Landscape Architects and Engineers celebrated the official opening of the new athletic field, running track and supporting facilities.

The district encompasses a high school, middle school and three elementary schools. BBS served the district as architect and engineer for the project. Savin Engineers provided construction management services.

“The new, $3.8-million, 100,000-square-foot sports complex replaced and expanded the deteriorated facilities which were insufficient for the needs of the district’s 2,850 students,” says BBS Director of Architecture Joseph B. Rettig, AIA, LEED AP.  “The new complex includes a multi-use, synthetic turf field; an eight-lane running track; and a 1,700-square-foot concession, bathroom and storage building.”

The creative financing for the project included a combination of the district’s private/not-for-profit and other public sources. This public/private combination of funding sources was unusual for a school-related construction project, but made financing easier at the time when local property tax increases in New York State are capped at 2%. The support of the Viking Foundation allowed the district to utilize funds raised through direct taxation to maintain the necessary level of instructional activities, while still making the construction of the new field and track possible.

The BBS team faced several engineering challenges, including the requirement to protect a neighboring wetland recharge basin and a poorly draining fill and soil at the site of the new field.

The complex also includes a new, one-story, multi-purpose building that serves as the main entry port to the athletic facilities. The building consists of two structures connected by a pitched steel truss roof with gray asphalt shingles and a reverse gable. The entryway between the buildings is protected by a decorative iron gate. The entire athletic facility received a new security system. +

Related Stories

Architects | Nov 2, 2015

China Accord: Design firms sign pledge to tackle climate change

52 companies will collaborate to reduce carbon emissions.

BIM and Information Technology | Oct 29, 2015

MIT develops ‘river of 3D pixels’ to assemble objects

The Kinetic Blocks can manipulate objects into shapes without human interference.

Architects | Oct 27, 2015

Top 10 tile trends for 2016

Supersized tile and 3D walls are among the trending tile design themes seen at Cersaie, an exhibition of ceramic tile and bathroom furnishings held in Bologna, Italy in October.

Architects | Oct 27, 2015

Architecture at Zero 2015 design competition names award winners

Entrants created family-style student residential plans for the University of California, San Francisco Mission Bay campus. All projects needed to be as close to net-zero as possible.

Architects | Oct 22, 2015

AIA: Architecture firms reporting progress on achieving carbon reduction targets as part of the 2030 Commitment

The AIA 2030 2014 Progress Report highlights an increase in design projects, gross square footage, and net-zero energy projects.

Architects | Oct 21, 2015

Strong rebound for Architecture Billings Index

Business conditions continue to be weak in the Northeast, but the other regions are in good shape.

Museums | Oct 20, 2015

Frank Lloyd Wright’s Bachman Wilson House finds new home at Arkansas museum

Crystal Bridges Museum reconstructed the 61-year-old Usonian house and will open it to the public in November.

Architects | Oct 20, 2015

Four building material innovations from the Chicago Architecture Biennial

From lightweight wooden pallets to the largest lengths of CLT-slabs that can be shipped across North America

University Buildings | Oct 16, 2015

5 ways architecture defines the university brand

People gravitate to brands for many reasons. Campus architecture and landscape are fundamental influences on the college brand, writes Perkins+Will's David Damon.

Architects | Oct 13, 2015

Architects Foundation expands National Resilience Initiative

The group is launching a search for three more NRI members.

boombox1
boombox2
native1

More In Category

Great Solutions

41 Great Solutions for architects, engineers, and contractors

AI ChatBots, ambient computing, floating MRIs, low-carbon cement, sunshine on demand, next-generation top-down construction. These and 35 other innovations make up our 2024 Great Solutions Report, which highlights fresh ideas and innovations from leading architecture, engineering, and construction firms.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021