flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

350,000-sf High Tech High School opens in Secaucus, N.J.

Education Facilities

350,000-sf High Tech High School opens in Secaucus, N.J.

The technical school is on the Frank J. Cargiulo Campus.


By David Malone, Associate Editor | September 12, 2018
Exterior of High Tech High School

Photo: Kate Glicksberg

A new $150 million, 350,000-sf technical high school in Secaucus, N.J. will provide education to almost 2,000 students across 70 classrooms and specialty spaces. High Tech High School sits on the 20-acre Frank J. Gargiulo Campus, which replaces the former North Bergen campus, and provides technically-focused, hands-on learning.

The new campus includes a fabrication lab, 120-seat black box theater, 325-seat performing arts auditorium, 80-inch interactive monitors to replace and enhance standard chalkboards, and a tv production studio with a functioning control room. Food for the culinary kitchen lab will be grown in a hydroponic rooftop garden. Designed to meet LEED Gold standards, the school features water efficient landscaping, geothermal heating, a green roof, and wind turbines.

 

See Also: Construction begins on North Carolina State University’s new engineering building

 

Culinary Kitchen at High tech High SchoolPhoto: Kate Glicksberg.

 

The Hudson County Improvement Authority managed the design and construction process for Hudson County School of Technology and partnered with RSC Architects, DMR Architects, MAST Construction Services, and Terminal Construction Corp. High Tech High School joins KAS Prep and Hudson Technical on the Frank J. Gargiulo Campus.

 

High Tech High School classroomPhoto: Kate Glicksberg.

 

High Tech High School interiorPhoto: Kate Glicksberg.

Related Stories

Education Facilities | Aug 20, 2018

More districts are reusing empty offices, stores, and other buildings to upgrade their schools

Older schools, with their small windows and rooms and creaky infrastructure, are tough and expensive to retrofit.

Education Facilities | Aug 14, 2018

Making schools more secure is imperative, but how best to do that isn't settled yet

In the first 21 weeks of 2018 alone, there were 23 school shootings where someone was killed or injured, according to CNN.

Education Facilities | Aug 13, 2018

Is STEM running out of steam?

Has STEM, which the business community urged school districts to embrace, been oversold as a career path?

Education Facilities | Aug 7, 2018

High-tech instruction space trains students in manufacturing robots

Harley Ellis Devereaux served as lead designer and lab planner for the project.

Education Facilities | Jul 11, 2018

Why school architects must understand how students learn

Would instruction be more effective if students spent less time passively listening to lectures and more time actively learning through activities, discussions, and group work? 

Education Facilities | Jul 6, 2018

Building for growth: Supporting gender-specific needs in middle school design

Today, efforts toward equity in education encompass a wide spectrum of considerations including sex, gender identity, socio-economic background, and ethnicity to name a few.

University Buildings | Jul 5, 2018

Brown University’s Engineering Research Center increases the university’s School of Engineering lab space by 30%

KieranTimberlake designed the facility and Shawmut Design and Construction was the general contractor.

boombox1
boombox2
native1

More In Category


Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021