flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

35-story mixed-use tower will be tallest residential building in Long Beach

Mixed-Use

35-story mixed-use tower will be tallest residential building in Long Beach

Studio One Eleven designed the tower.


By David Malone, Associate Editor | October 15, 2018
Shoreline Gateway Rendering

Image courtesy of Shoreline Development Partners, LP 

Designed as a companion building to The Current, a 17-story, 223-unit apartment tower, Shoreline Gateway has officially broken ground at its Ocean Blvd. and Alamitos Ave. location. When completed, the project will become the tallest residential building in Long Beach.

Shoreline Gateway will rise over 400 feet and 35 stories and provide 315 residential apartment homes, 6,460 sf of commercial space, five levels of underground parking, and amenities and community living spaces. The 34th floor will include a community room with 180-degree views of the Pacific Ocean, Downtown Long Beach, and Orange County. A rooftop pool, spa, and dining and entertainment deck will occupy the 35th floor. More community entertainment space can be found on the third floor, which features a dining and fire pit lounge, a large fitness studio, a pet spa, and a creativity studio.

 

See Also: Affordable treasures

 

The project offers a mix of studio, one-, and two-bedroom apartments that range from 580 sf to 2,480 sf. Two-story penthouses are included on floors 34 and 35. The building will be connected to The Current via a 10,000-sf shared plaza that includes retail and resident amenities.

The build team comprises Studio One Eleven (design architect), Carrier Johnson + Culture (architect of record), RELM (landscape architect), Englekirk (structural engineer), and C&V Consulting (civil). Build Group is the general contractor. The development team consists of Ledcor Properties Inc., Anderson Pacific LLC, Qualico Developments, and Lantower Residential.

Shoreline Gateway is slated for completion in quarter 4 of 2021.

Related Stories

Mixed-Use | Apr 22, 2022

San Francisco replaces a waterfront parking lot with a new neighborhood

A parking lot on San Francisco’s waterfront is transforming into Mission Rock—a new neighborhood featuring rental units, offices, parks, open spaces, retail, and parking.

Wood | Apr 13, 2022

Mass timber: Multifamily’s next big building system

Mass timber construction experts offer advice on how to use prefabricated wood systems to help you reach for the heights with your next apartment or condominium project. 

Office Buildings | Apr 11, 2022

SOM-designed office tower aims to promote health and wellness

Skidmore, Owings & Merrill (SOM) recently completed work on 800 Fulton Market, a new mixed-use office building in Chicago’s historic Fulton Market/West Loop neighborhood.

Multifamily Housing | Mar 29, 2022

Here’s why the U.S. needs more ‘TOD’ housing

Transit-oriented developments help address the housing affordability issue that many cities and suburbs are facing.

Multifamily Housing | Feb 24, 2022

First new, mixed-use high-rise in Detroit’s central business district in nearly 30 years opens

City Club Apartments completed two multifamily projects in 2021 in downtown Detroit including the first new, mixed-use high-rise in Detroit’s central business district in nearly 30 years.

Office Buildings | Feb 23, 2022

The Beam on Farmer, Arizona’s first mass timber, multi-story office building tops out

The Beam on Farmer, Arizona’s first mass timber, multi-story office building, topped out on Feb. 10, 2022.

Mixed-Use | Feb 9, 2022

David Chipperfield Architects to design Schützenstraße mixed-use development in Munich

The firm recently won a competition for the project.

Mixed-Use | Jan 13, 2022

Details unveiled for Atlanta’s Campus 244 mixed-use development

S9 Architecture is designing the project.

Mixed-Use | Jan 10, 2022

Mixed-use Arsenal Yards completes in Watertown’s East End

PCA master-planned the seven-building, one million sf destination and designed the urban village, residences, and open spaces.

Mixed-Use | Jan 5, 2022

Waterfront Station II breaks ground in Washington, D.C.

The mixed-use project will include 30% affordable housing.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021