flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

31-story YotelPAD Miami combines 222 hotel rooms and 231 condominiums

Hotel Facilities

31-story YotelPAD Miami combines 222 hotel rooms and 231 condominiums

YotelPAD is a new brand by Yotel.


By David Malone, Associate Editor | February 4, 2019
yotelPAD exterior

Courtesy Stantec.

YotelPAD Miami, a 31-story hotel/condo project, is currently under construction in Miami’s downtown urban core at 227 NE 2nd Street. Stantec is providing all-inclusive architecture, interior design, and engineering services for the project.

The 327,356-sf tower will feature 222 Yotel-branded “cabins” (hotel rooms) and 231 “PADs” (condominiums). Building amenities will include a Skytop Lounge, a pool deck with a restaurant and bar, a fitness center, co-working space, and a pet spa.

An amenity deck on the 12th floor will separate the building into two distinct elements. The bottom portion of the building (floors 2-12) is the hotel and features a simple geometric design. The condominiums will be located above the amenity pad (floors 15-30) and feature floor-to-ceiling windows and balconies.

 

See Also: The year-end U.S. hotel construction pipeline continues steady growth trend

 

The ground level will include separate lobbies for guests and residences, a restaurant, a lounge, an organic matcha bar, and co-working space. Also included for residents are smart lockers for package deliveries, bike storage, and individual storage. Condo units will range from studios to one- and two-bedrooms and range in size from 417 sf to 708 sf.

Aria Development Group and AQARAT are the project’s developers. YotelPAD Miami is slated for completion in early 2021.

Related Stories

| Nov 3, 2011

GREC Architects announces opening of the Westin Abu Dhabi Golf Resort and Spa

The hotel was designed by GREC and an international team of consultants to enhance the offerings of the Abu Dhabi Golf Club without imposing upon the dramatic landscapes of the elite golf course.

| Nov 3, 2011

Hardin Construction tops out Orlando Embassy Suites

The project began in April 2011 and is expected to open in fall 2012.

| Nov 2, 2011

John W. Baumgarten Architect, P.C, wins AIA Long Island Chapter‘s Healthcare Award for Renovation

The two-story lobby features inlaid marble floors and wood-paneled wainscoting that pays homage to the building’s history.

| Sep 26, 2011

Energy efficient LED flat panels installed at N.Y. metro hospitals

LED Flat Panels deliver fully dimmable, energy efficient high quality lighting with even, shadow-free distribution, and excellent 85 Color Rendering Index. 

| Sep 23, 2011

Curtainwall façade installation at Ohio State Cancer and Critical Care facility

A sophisticated curtainwall facade will be installed at the new OSU Cancer and Critical Care facility.

| Sep 14, 2011

Insulated metal wall panels adorn Pennsylvania hospital

The $40 million, 80,000 sf medical office building includes more than 7,000 sf of architectural flat insulated metal wall panels.

| Sep 12, 2011

Living Buildings: Are AEC Firms up to the Challenge?

Modular Architecture > You’ve done a LEED Gold or two, maybe even a LEED Platinum. But are you and your firm ready to take on the Living Building Challenge? Think twice before you say yes.

| Sep 7, 2011

KLMK Group awarded contract with Louisiana’s Slidell Memorial Hospital

The renovation will include a 56,000-sf Emergency Room/Cardiology Expansion.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021