The healthcare sector faces grave financial uncertainties, even with the June 28 Supreme Court decision upholding the Affordable Care Act. To help us sort out the factors impacting this lucrative segment, we turned to Philip Tobey, a Fellow of both the AIA and the American College of Healthcare Architects and Senior Vice President with SmithGroupJJR.
“Health industry providers legitimately expect significant efficiencies and lower costs for design and construction services, to go along with the economies that they themselves face with tighter and value-based reimbursement terms under health reform,” says Tobey, a member of Building Design+Construction’s Editorial Board.
In other words, AEC firms are going to have to share some of their healthcare clients’ pain. The drive for greater operational efficiency and lower cost in healthcare will be unrelenting, with bundled payments and shared savings models in lieu of traditional fee-for-service reimbursement forcing healthcare providers to eliminate wasteful practices.
Tobey sees three major trends emerging: 1) growing emphasis on ambulatory care, 2) medical systems integration, and 3) the “bundling/unbundling” of services.
SCROLL DOWN FOR GIANTS 300 TOP 25 AEC HEALTHCARE FIRM RANKINGS
1. PUSHING AMBULATORY CARE FACILITIES OUT
“The trend to push services out of the hospital into ambulatory settings will only intensify,” says Tobey. He notes, however, that there will be an “overwhelming need” to expand the front end of delivery—primary care, urgent care, and emergency departments—and to rationalize procedural and imaging resource capacity. At the same time, freestanding surgery and imaging centers may not be as prevalent in the future, and may need to be consolidated into larger hospital centers.
“Hospitals are not going away,” says Tobey, even though inpatient volumes are predicted to fall 5%, vs. 30% growth in outpatient volume. The sheer increased volume of patients, especially as baby boomers age, will inevitably drive up acute-care admissions. In the face of these seemingly countervailing trends, says Tobey, “The need to renovate outdated or obsolete facilities will be a strong driver in the healthcare business.”
2. INTEGRATING MEDICAL SYSTEMS MORE TIGHTLY
Tobey says the need for greater efficiency and ever-higher quality of care are not new goals for medical care or medical design, but hospital systems are being encouraged further by healthcare reform to streamline processes, with more mergers, acquisitions, and hospital-physician staff integrations on the horizon. “The industry’s even been talking about including services like long-term care and home care into this integrated approach,” he says.
Although there will always be a need for acute-care hospitals, Tobey sees a possible shift toward more community-based portals. As health systems continue to integrate, they will rely more and more on treatment venues outside the hospital to provide patients with coordinated preventive care and treatment for chronic conditions.
The IT component of hospital systems is already a natural for systems integration. “Providing the right information where it’s needed is essential for clinical care,” says Tobey, who foresees greater implementation of electronic medical records.
Are hospitals ready for lean?
“Everybody’s talking about it, but many hospital owners are wary of taking on lean,” says SmithGroupJJR’s Phil Tobey, FAIA, FACHA, whose firm is on the team for Sutter Health’s California Pacific Medical Center in San Francisco, the largest lean project in the U.S. “You have Sutter, which is totally lean, then you have clients who tell us not even to mention the word,” he says. “Others are applying the basic principles of lean construction without carrying the heavy weight of all that lean entails.”
Applying Lean/Six Sigma principles to healthcare, says Jeffrey C. Stouffer, AIA, a Principal with HKS, would result in “measurable outcomes and even risk sharing as part of the design and construction process” by eliminating unnecessary waste in construction and operations and increasing staff efficiency and safety, while reducing energy and staff costs for the hospital.
3. UNBUNDLING/BUNDLING OF HEALTHCARE SERVICES
Healthcare providers are “decanting” non-core functions—services like pharmacy, lab support, materials handling, and environmental management—from the mother ship into cheaper B-occupancy buildings. “Anything soft, anything that’s not high-tech, is being taken out,” says Tobey. “That’s the unbundling.”
However, once the unbundling of less-intense services has been accomplished, says Tobey, some hospital systems are opting to bundle the remaining hospital space, by placing beds back on top of the structure’s base diagnostic and support block, instead of having the traditional diagnostic/support chassis with attached nursing wings.
“You unbundle and decant the support services, then take the remaining high-intensity hospital base and put the beds on top,” says Tobey. A recent study for a 100-bed community hospital found that following such a scheme would result in 39% savings in construction costs per bed. +
TOP 25 HEALTHCARE SECTOR ARCHITECTURE FIRMS
Rank | Company | 2011 Healthcare Revenue ($) |
1 | HDR Architecture | 205,200,000 |
2 | HKS | 124,736,964 |
3 | Perkins+Will | 122,895,589 |
4 | Cannon Design | 121,000,000 |
5 | NBBJ | 116,401,000 |
6 | HOK | 102,695,248 |
7 | SmithGroupJJR | 74,600,000 |
8 | RTKL Associates | 68,421,405 |
9 | Perkins Eastman | 63,700,000 |
10 | Hammel, Green and Abrahamson | 61,900,000 |
11 | ZGF Architects | 54,338,355 |
12 | Heery International | 48,583,000 |
13 | HMC Architects | 42,715,899 |
14 | PageSoutherlandPage | 38,670,000 |
15 | IBI Group | 37,349,554 |
16 | Skidmore, Owings & Merrill | 33,950,000 |
17 | FKP Architects | 33,947,200 |
18 | Gresham, Smith and Partners | 32,876,981 |
19 | FreemanWhite | 28,500,000 |
20 | RBB Architects | 28,500,000 |
21 | LEO A DALY | 26,900,325 |
22 | BSA LifeStructures | 26,323,759 |
23 | EwingCole | 24,000,000 |
24 | KMD Architects | 20,161,678 |
25 | Ennead Architects | 19,875,000 |
TOP 25 HEALTHCARE SECTOR ENGINEERING FIRMS
Rank | Company | 2011 Healthcare Revenue ($) |
1 | AECOM Technology Corp. | 314,000,000 |
2 | Stantec | 109,980,000 |
3 | URS Corp. | 41,298,918 |
4 | Smith Seckman Reid | 38,300,000 |
5 | Jacobs | 32,950,000 |
6 | Parsons Brinckerhoff | 30,600,000 |
7 | KPFF Consulting Engineers | 28,000,000 |
8 | TTG|TMAD TAYLOR & GAINES | 27,677,900 |
9 | Mazzetti Nash Lipsey Burch | 24,988,296 |
10 | Degenkolb Engineers | 22,454,591 |
11 | Allen & Shariff | 21,577,769 |
12 | Bard, Rao + Athanas Consulting Engineers | 18,000,000 |
13 | ccrd partners | 17,100,000 |
14 | Atkins North America | 16,173,240 |
15 | AKF Group | 15,200,000 |
16 | KJWW Engineering Consultants | 14,607,369 |
17 | Syska Hennessy Group | 14,462,238 |
18 | Zak Companies | 13,882,705 |
19 | TLC Engineering for Architecture | 13,874,283 |
20 | Dewberry | 10,613,564 |
21 | Thornton Tomasetti | 9,860,000 |
22 | Sparling | 9,658,825 |
23 | Walter P Moore | 7,718,326 |
24 | M/E Engineering | 7,700,000 |
25 | Rutherford & Chekene | 7,650,000 |
TOP 25 HEALTHCARE SECTOR CONSTRUCTION FIRMS
Rank | Company | 2011 Healthcare Revenue ($) |
1 | Turner Corporation, The | 1,807,050,000 |
2 | McCarthy Holdings | 1,231,000,000 |
3 | Gilbane Building Co. | 1,091,777,000 |
4 | Clark Group | 1,067,411,678 |
5 | PCL Construction Enterprises | 869,130,091 |
6 | Brasfield & Gorrie | 833,522,003 |
7 | Skanska USA | 724,418,042 |
8 | JE Dunn Construction | 636,206,095 |
9 | Robins & Morton | 599,073,000 |
10 | DPR Construction | 588,199,172 |
11 | Whiting-Turner Contracting Co., The | 464,779,240 |
12 | Mortenson | 455,620,000 |
13 | Lend Lease | 434,626,482 |
14 | Hensel Phelps Construction | 425,760,000 |
15 | Suffolk Construction | 420,343,563 |
16 | Pepper Construction Group | 415,064,000 |
17 | Tutor Perini Corp. | 409,583,000 |
18 | Balfour Beatty US | 389,253,907 |
19 | Hunt Construction Group | 369,500,000 |
20 | Hoar Construction | 313,937,000 |
21 | Flintco | 291,400,000 |
22 | Layton Construction | 287,300,000 |
23 | HBE Corp. | 279,200,000 |
24 | Power Construction | 275,000,000 |
25 | Swinerton | 274,627,440 |
Related Stories
| Feb 15, 2011
AIA on President Obama's proposed $1 billion investment in energy conservation
The President’s budget increases the value of investment in energy conservation in commercial buildings by roughly $1 billion, reports AIA 2011 President Clark Manus, FAIA. The significant increase from the current tax deduction of $1.80 per sq. ft. now on the books is an increase for which the AIA has been advocating in order to encourage energy conservation.
| Feb 14, 2011
Sustainable Roofing: A Whole-Building Approach
According to sustainability experts, the first step toward designing an energy-efficient roofing system is to see roof materials and systems as an integral component of the enclosure and the building as a whole. Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam.
| Feb 11, 2011
Four Products That Stand Up to Hurricanes
What do a panelized wall system, a newly developed roof hatch, spray polyurethane foam, and a custom-made curtain wall have in common? They’ve been extensively researched and tested for their ability to take abuse from the likes of Hurricane Katrina.
| Feb 11, 2011
RS Means Cost Comparison Chart: Office Buildings
This month's RS Means Cost Comparison Chart focuses on office building construction.
| Feb 11, 2011
Sustainable features on the bill for dual-building performing arts center at Soka University of America
The $73 million Soka University of America’s new performing arts center and academic complex recently opened on the school’s Aliso Viejo, Calif., campus. McCarthy Building Companies and Zimmer Gunsul Frasca Architects collaborated on the two-building project. One is a three-story, 47,836-sf facility with a grand reception lobby, a 1,200-seat auditorium, and supports spaces. The other is a four-story, 48,974-sf facility with 11 classrooms, 29 faculty offices, a 150-seat black box theater, rehearsal/dance studio, and support spaces. The project, which has a green roof, solar panels, operable windows, and sun-shading devices, is going for LEED Silver.
| Feb 11, 2011
BIM-enabled Texas church complex can broadcast services in high-def
After two years of design and construction, members of the Gateway Church in Southland, Texas, were able to attend services in their new 4,000-seat facility in late 2010. Located on a 180-acre site, the 205,000-sf complex has six auditoriums, including a massive 200,000-sf Worship Center, complete with catwalks, top-end audio and video system, and high-definition broadcast capabilities. BIM played a significant role in the building’s design and construction. Balfour Beatty Construction and Beck Architecture formed the nucleus of the Building Team.
| Feb 11, 2011
Kentucky’s first green adaptive reuse project earns Platinum
(FER) studio, Inglewood, Calif., converted a 115-year-old former dry goods store in Louisville, Ky., into a 10,175-sf mixed-use commercial building earned LEED Platinum and holds the distinction of being the state’s first adaptive reuse project to earn any LEED rating. The facility, located in the East Market District, houses a gallery, event space, offices, conference space, and a restaurant. Sustainable elements that helped the building reach its top LEED rating include xeriscaping, a green roof, rainwater collection and reuse, 12 geothermal wells, 81 solar panels, a 1,100-gallon ice storage system (off-grid energy efficiency is 68%) and the reuse and recycling of construction materials. Local firm Peters Construction served as GC.
| Feb 11, 2011
Former Richardson Romanesque hotel now houses books, not beds
The Piqua (Ohio) Public Library was once a late 19th-century hotel that sat vacant and deteriorating for years before a $12.3 million adaptive reuse project revitalized the 1891 building. The design team of PSA-Dewberry, MKC Associates, and historic preservation specialist Jeff Wray Associates collaborated on the restoration of the 80,000-sf Richardson Romanesque building, once known as the Fort Piqua Hotel. The team restored a mezzanine above the lobby and repaired historic windows, skylight, massive fireplace, and other historic details. The basement, with its low ceiling and stacked stone walls, was turned into a castle-like children’s center. The Piqua Historical Museum is also located within the building.