flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

250-unit rental building opens in Brooklyn

Multifamily Housing

250-unit rental building opens in Brooklyn

CetraRuddy designed the project.


By David Malone, Associate Editor | April 2, 2021
The Lois exterior courtyard

Photos: Cameron Blaylock

The Lois, an eight-story, 250-unit residential building, has opened on the border of Prospect-Lefferts Gardens and East Flatbush in Brooklyn. The building features a mix of middle-income and market rate residences from studios to three bedrooms as well as 6,000 sf of ground floor retail.

The $105 million, 227,000-sf project includes amenities such as an expansive roof terrace with barbecues, a top-floor tenant lounge, a gym with a separate yoga room, a children’s room with a private outdoor play area and splash pad, a screening room, a self-service pet spa, a quiet lounge, and a game room. Residents also have access to 125 parking spaces and a 41-unit tenant storage room in the cellar.

 

The Lois rooftop space

 

The building’s facade features recessed masonry expressions and copper panel accents meant to reference the growing neighborhood’s industrial past. Apartment units include washers and dryers, stainless steel appliances, hardwood floors, and central heating and cooling though an energy efficient VRF system.

The LEED Platinum certified building has set aside 75 units (30% of the building’s total) for households earning between 110% and 130% of Area Median Income. The Lois is the second building in a phased project bringing a total of more than 400 apartments to Brooklyn’s East Flatbush – Prospect-Lefferts Gardens neighborhood. The first building, The Clark at 310 Clarkson Avenue, opened in 2019.

 

The Lois apartment living room

 

The Lois apartment kitchen space

Related Stories

Multifamily Housing | Sep 12, 2019

Meet the masters of offsite construction

Prescient combines 5D software, clever engineering, and advanced robotics to create prefabricated assemblies for apartment buildings and student housing.

Multifamily Housing | Sep 10, 2019

Carbon-neutral apartment building sets the pace for scalable affordable housing

Project Open has no carbon footprint, but the six-story, solar-powered building is already leaving its imprint on Salt Lake City’s multifamily landscape. 

Multifamily Housing | Sep 4, 2019

Peloton to multifamily communities: Drop dead

Peloton will no longer sell its bikes to apartment communities.

| Sep 3, 2019

Top 10 indoor amenities in multifamily developments for 2019

In-unit washer/dryer heads our ranking of the top indoor amenities in multifamily housing developments. 

AEC Innovators | Aug 27, 2019

7 AEC industry disruptors and their groundbreaking achievements

From building prefab factories in the sky to incubating the next generation of AEC tech startups, our 2019 class of AEC Innovators demonstrates that the industry is poised for a shakeup. Meet BD+C’s 2019 AEC Innovators.

AEC Tech | Aug 25, 2019

Deluxe parking: A condo building in Philadelphia offers its owners a completely automated parking service

This is the first “palletless” system that Westfalia Technologies has installed.

Multifamily Housing | Aug 22, 2019

40-story residential tower to rise near Seattle’s Pike Place Market

Hewitt architects is designing the project.

Multifamily Housing | Aug 19, 2019

Affordable, senior development rises in the Bronx

RKTB Architects is designing the project.

Multifamily Housing | Aug 19, 2019

Top 10 outdoor amenities in multifamily housing for 2019

Top 10 results in the “Outdoor Amenities” category in our Multifamily Design+Construction Amenities Survey 2019.

Market Data | Aug 19, 2019

Multifamily market sustains positive cycle

Year-over-year growth tops 3% for 13th month. Will the economy stifle momentum?

boombox1
boombox2
native1

More In Category


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021