flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

250-unit rental building opens in Brooklyn

Multifamily Housing

250-unit rental building opens in Brooklyn

CetraRuddy designed the project.


By David Malone, Associate Editor | April 2, 2021
The Lois exterior courtyard

Photos: Cameron Blaylock

The Lois, an eight-story, 250-unit residential building, has opened on the border of Prospect-Lefferts Gardens and East Flatbush in Brooklyn. The building features a mix of middle-income and market rate residences from studios to three bedrooms as well as 6,000 sf of ground floor retail.

The $105 million, 227,000-sf project includes amenities such as an expansive roof terrace with barbecues, a top-floor tenant lounge, a gym with a separate yoga room, a children’s room with a private outdoor play area and splash pad, a screening room, a self-service pet spa, a quiet lounge, and a game room. Residents also have access to 125 parking spaces and a 41-unit tenant storage room in the cellar.

 

The Lois rooftop space

 

The building’s facade features recessed masonry expressions and copper panel accents meant to reference the growing neighborhood’s industrial past. Apartment units include washers and dryers, stainless steel appliances, hardwood floors, and central heating and cooling though an energy efficient VRF system.

The LEED Platinum certified building has set aside 75 units (30% of the building’s total) for households earning between 110% and 130% of Area Median Income. The Lois is the second building in a phased project bringing a total of more than 400 apartments to Brooklyn’s East Flatbush – Prospect-Lefferts Gardens neighborhood. The first building, The Clark at 310 Clarkson Avenue, opened in 2019.

 

The Lois apartment living room

 

The Lois apartment kitchen space

Related Stories

Multifamily Housing | Jun 4, 2020

Roof hatches selected for infill townhomes in Miami’s Little Havana neighborhood

Townhome project in Little Havana, Miam, Fla., uses BILCO roof hatches for reliability, code compliance.

Multifamily Housing | May 29, 2020

New multifamily project includes energy storage as an amenity

Each battery is linked to an on-site solar panel array.

Coronavirus | May 26, 2020

Multifamily developers report mounting delays in permitting and starts due to coronavirus pandemic

More than half (53%) of multifamily developer respondents reported construction delays in the jurisdictions where they operate, according to the third edition of the National Multifamily Housing Council (NMHC) COVID-19 Construction Survey.

Multifamily Housing | May 8, 2020

Nashville's newest residential tower will rise 416 feet

Goettsch Partners is designing the project.  

Multifamily Housing | May 8, 2020

'Lakehouse' is the first multifamily project in Colorado to receive WELL Precertification

Stantec and Muñoz + Albin are the project's architects.  

Senior Living Design | May 5, 2020

5 memory care communities with a strong sense of mission

Communities in California, Colorado, Florida, Maryland, and Virginia display excellence in memory care facility development, design, and construction.

Multifamily Housing | Apr 23, 2020

Tankless water heaters: 12 things to know about these energy savers for multifamily housing

Twelve factors to consider in using tankless water heaters in multifamily housing.

Multifamily Housing | Apr 20, 2020

Multifamily market flattens as construction proposal activity sinks

Multifamily has consistently been one of the strongest performers among 58 submarkets measured in PSMJ Resources’ quarterly survey.

boombox1
boombox2
native1

More In Category


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021