flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

$22 million investment made in energy efficient building maker

$22 million investment made in energy efficient building maker


By By BD+C Staff | September 9, 2011
Project Frog buildings use at least 25% less energy than the strictest building codes in the U.S.

Providing both capital and collaboration, GE led a $22 million investment round in San Francisco-based Project Frog and began construction of one of its prefabricated environmentally sustainable buildings at GE's renowned Learning Center in Ossining, NY.
Led by GE Energy Financial Services and joined by other investors including Claremont Creek Ventures, Greener Capital Partners, and RockPort Capital Partners, the $22 million investment will help Project Frog expand its sales pipeline and execute on orders. The investment amount for each firm participating was not disclosed.
Project Frog's technology improves traditional building construction methods by combining semi-custom designs with a pre-engineered kit of energy-efficient building components. This enables higher quality, more environmentally sustainable, faster and cheaper construction. Through advanced performance modeling, Project Frog analyzes how its buildings will perform in each location, allowing owners to optimize a building kit to match their desired performance. The kits are delivered to project sites ready for assembly, and typically take one to six months to construct --less than half the time required for traditional construction. The buildings use at least 25% less energy than the strictest building codes in the U.S., and as much as 80% less energy in certain parts of the country. Project Frog manufactures its commercial building systems for educational and government organizations, healthcare offices and retail spaces. BD+C

Related Stories

| Oct 7, 2011

GREENBUILD 2011: UL Environment releases industry-wide sustainability requirements for doors

  ASSA ABLOY Trio-E door is the first to be certified to these sustainability requirements.

| Oct 7, 2011

GREENBUILD 2011: UL Environment clarifies emerging environmental product declaration field

  White paper defines EPD, details development process, and identifies emerging trends for manufacturers, architects, designers, and buyers.

| Oct 7, 2011

GREENBUILD 2011: Otis Elevator introduces energy-efficient escalator

The energy-efficient NCE escalator from Otis offers customers substantial “green” benefits.

| Oct 7, 2011

GREENBUILD 2011: Schools program receives grant to track student conservation results

To track results, schools will use the newly developed Sustainability Dashboard, a unique web-based service that makes tracking sustainability initiatives affordable and easy.

| Oct 7, 2011

GREENBUILD 2011: Transparent concrete makes its North American debut at Greenbuild

  The panels allow interior lights to filter through, from inside. 

| Oct 6, 2011

GREENBUILD 2011: Growing green building market supports 661,000 green jobs in the U.S.

Green jobs are already an important part of the construction labor workforce, and signs are that they will become industry standard.

| Oct 6, 2011

GREENBUILD 2011: Dow Corning features new silicone weather barrier sealant

Modular Design Architecture >Dow Corning 758 sealant used in GreenZone modular high-performance medical facility.

| Oct 6, 2011

GREENBUILD 2011: NEXT Living EcoSuite showcased

  Tridel teams up with Cisco and Control4 to unveil the future of green condo living in Canada.

| Oct 5, 2011

GREENBUILD 2011: Johnson Controls announces Panoptix, a new approach to building efficiency

Panoptix combines latest technology, new business model and industry-leading expertise to make building efficiency easier and more accessible to a broader market.

boombox1
boombox2
native1

More In Category



Urban Planning

The magic of L.A.’s Melrose Mile

Great streets are generally not initially curated or willed into being. Rather, they emerge organically from unintentional synergies of commercial, business, cultural and economic drivers. L.A.’s Melrose Avenue is a prime example. 


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021