Providing both capital and collaboration, GE led a $22 million investment round in San Francisco-based Project Frog and began construction of one of its prefabricated environmentally sustainable buildings at GE's renowned Learning Center in Ossining, NY.
Led by GE Energy Financial Services and joined by other investors including Claremont Creek Ventures, Greener Capital Partners, and RockPort Capital Partners, the $22 million investment will help Project Frog expand its sales pipeline and execute on orders. The investment amount for each firm participating was not disclosed.
Project Frog's technology improves traditional building construction methods by combining semi-custom designs with a pre-engineered kit of energy-efficient building components. This enables higher quality, more environmentally sustainable, faster and cheaper construction. Through advanced performance modeling, Project Frog analyzes how its buildings will perform in each location, allowing owners to optimize a building kit to match their desired performance. The kits are delivered to project sites ready for assembly, and typically take one to six months to construct --less than half the time required for traditional construction. The buildings use at least 25% less energy than the strictest building codes in the U.S., and as much as 80% less energy in certain parts of the country. Project Frog manufactures its commercial building systems for educational and government organizations, healthcare offices and retail spaces. BD+C
Related Stories
| Nov 29, 2011
AIA launches stalled projects database
To populate this database with both stalled projects and investors interested in financing them, the AIA in the last week initiated a communications campaign to solicit information about stalled projects around the country from its members and allied professionals.
| Nov 28, 2011
Leo A Daly and McCarthy Building complete Casino Del Sol expansion in Tucson, Ariz.
Firms partner with Pascua Yaqui Tribe to bring new $130 million Hotel, Spa & Convention Center to the Tucson, Ariz., community.
| Nov 28, 2011
Armstrong acquires Simplex Ceilings
Simplex will become part of the Armstrong Building Products division.
| Nov 28, 2011
Nauset Construction completes addition for Franciscan Hospital for Children
The $6.5 million fast-track, urban design-build projectwas completed in just over 16 months in a highly sensitive, occupied and operational medical environment.
| Nov 23, 2011
Lord, Aeck & Sargent opens fourth U.S. office, acquiring architecture firm in Austin, Texas
Strategic move offers growth opportunity and strengthens the firm’s historic preservation portfolio.
| Nov 23, 2011
Griffin Electric completes Gwinnett Tech project
Accommodating up to 3,000 students annually beginning this fall, the 78,000-sf, three-story facility consists of thirteen classrooms and twelve high-tech laboratories, in addition to several lecture halls and faculty offices.
| Nov 22, 2011
Corporate America adopting revolutionary technology
The survey also found that by 2015, the standard of square feet allocated per employee is expected to drop from 200 to estimates ranging from 50 to 100 square feet per person dependent upon the industry sector.
| Nov 22, 2011
Report finds that L.A. lags on solar energy, offers policy solutions
Despite robust training programs, L.A. lacks solar jobs; lost opportunity for workers in high-need communities.
| Nov 22, 2011
Saskatchewan's $1.24 billion carbon-capture project
The government of Saskatchewan has approved construction of the Boundary Dam Integrated Carbon Capture and Storage Demonstration Project.